Vancouver, BC ( December 8 , 202 1) Skeena Resources Limited (TSX: SKE, NYSE: SKE)

(“Skeena” or the “Company”) is pleased to report new drilling results from the 2021 Phase II Albino

Waste Facility (“AWF”) investigation at the Eskay Creek gold-silver p roject (“Eskay Creek” or the

“Project”) located in the Golden Triangle of British Columbia. This expansion program, totaling 212 m

over 12 vertical drill holes, was completed utilizing an air rotary drill rig from the surface of the permitted

AWF in Q4 2021. Analytical results from the recently completed drill holes are detailed in this release.

Reference images are presented at the end of this release as well as on the Company’s website.

Eskay Creek AWF Phase II 2021 Highlights:

• 5.90 g/t Au, 317 g/t Ag (10.13 g/t AuEq) over 16.77 m (SK-21-899)

• 4.53 g/t Au, 168 g/t Ag (6.77 g/t AuEq) over 12.20 m (SK-21-901)

• 5.84 g/t Au, 222 g/t Ag (8.80 g/t AuEq) over 13.72 m (SK-21-903)

• 3.39 g/t Au, 156 g/t Ag (5.47 g/t AuEq) over 16.77 m (SK-21-908)

• 3.76 g/t Au, 151 g/t Ag (5.77 g/t AuEq) over 16.76 m (SK-21-909)

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths equate to 100% of reported sample

lengths. Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq

composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples

below detection limit were nulled to a value of zero.

Phase II Drilling Substantively Increases AWF Mineralization

Phase II AWF expansion drilling has been very successful in increasing the Au-Ag mineralization

discovered during the Company’s initial drill program in Q1 2021. This new drilling was completed

from a floating barge on the water surface of the AWF on 50 m staggered drill centers. Highlights of

the drilling include SK-21-899: 5.90 g/t Au, 317 g/t Ag (10.13 g/t AuEq) o ver 16.77 m, SK-21-903:

5.84 g/t Au, 222 g/t Ag (8.80 g/t AuEq) over 13.72 m and are comparable in grade and width to the

mineralization intersected in the Phase I progra m. Courtesy of this expansion drilling, mineralization

within the AWF has now been increased to an area measuring 350 m by 125 m. The remainder of the

AWF is untested by drilling and remains open for expansion.

To date, th e combined Phase I and Phase II prog rams have intersected a mineralized horizon

averaging 13.20 m (true thickness) across 20 drill holes with length weighted grades averaging 4.03 g/t

Au, 163 g/t Ag ( 6.21 g/t AuEq ), 39 ppm Hg, 331 ppm As and 922 ppm Sb. The length weighted

concentrations of Hg, As and Sb from the combined AWF programs are, to date, consistent with the

Company’s pit constrained Mineral Resource Estimate (MRE) for the in situ Eskay Creek deposits.

Current Status and Next Steps

The Company anticipates continuing the Phase II program in early Q1 2022 with two drill rigs from the

ice surface once the engineered ice thicknesses at the AWF meet s safety requirements. Staggered

NR: 21-40 | December 8, 2021

50 m drill spacings are expected to be completed to determine the exte nts of the mineralization

followed by infill on 25 m centers.

Albino Waste Facility Discussion

Situated west of the Eskay Creek mine site, the Albino Waste Facility was utilized by former operators

as a subaqueous repository for mine waste and included both development waste rock as well as mill

tailings. It is estimated that approximately 2 million tonnes of waste rock and tailings material was

deposited into the AWF during the previous operations at Eskay Creek.

During historical operations, the underground mine development was largely driven in the often -

mineralized footwall rhyolite sequences be low the mined contact mudstone. Although these rocks

possessed variable Au -Ag tenor, former operators considered the rhyolite hosted mineralization

uneconomic due to the high cutoff grades required at the time. Hence, this development rock was

transferred to the AWF for subaqueous deposition.

About Skeena

Skeena Resources Limited is a Canadian mining exploration and development company focused on

revitalizing the past-producing Eskay Creek gold-silver mine located in Tahltan Territory in the Golden

Triangle of northwest British Columbia, Canada. The Company released a Prefeasibility Study for

Eskay Creek in July 2021 which highlights an open -pit average grade of 4.57 g/t AuEq, an after -tax

NPV5% of C$1.4B, 56% IRR, and a 1.4 -year payback at US$1,550/oz Au. Skeena is currently

completing both infill and exploration drilling to advance Eskay Creek to full Feasibility by Q1 2022.

On behalf of the Board of Directors of Skeena Resources Limited,

Walter Coles Jr.

President & CEO

Contact Information

Investor Inquiries: [email protected]

Office Phone: +1 604 684 8725

Company Website: www.skeenaresources.com

Qualified Persons

Exploration activities a t the Eskay Creek Project are administered on site by the Company’s

Exploration Managers, Raegan Markel, P.Geo., John Tyler and Director of Exploration, Adrian Newton

P.Geo. In accordance with National Instrument 43 -101 Standards of Disclosure for Mineral Projects,

Paul Geddes, P.Geo. Vice President Exploration and Resource Development, is the Qualified Person

for the Company and has prepared, validated and approved the technical and scientific content of this

news release. The Company strictly adheres to C IM Best Practices Guidelines in conducting,

documenting, and reporting the exploration activities on its projects.

Quality Assurance – Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and

bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are

applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC)

samples at regular intervals in the sample stream, including blanks and reference materials with all

sample shipments to monitor laboratory performance. The QAQC program was designed and

approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s

Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British

Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard

for gold assays and all analytical methods include quality control materials at set frequencies with

established data acceptance criteria. The entire sample is crushed and 1 kg is pulverized. Analysis for

gold is by 50 g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and

upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 50 g

fire assay fusion with gravimetric finish. Analysis for silver is by 50 g fire assay fusion with gravimetric

finish with a lower limit of 5ppm and upper limit of 10,000 ppm. Samples with silver assays greater

than 10,000 ppm are re -analyzed using a gravimetric silver concentrate method. A selected number

of samples are also analyzed using a 48 multi -element geochemical package by a 4 -acid digestion,

followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP -AES) and Inductively

Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with

Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP -AES) finish. Samples with sulfur

reporting greater than 10% from the multi -element analysis are re -analyzed for total sulfur by Leco

furnace and infrared spectroscopy.

Cautionary note regarding forward-looking statements

Certain statements and information contained or incorporated by reference in this press release constitute “forward-looking information”

and “forward -looking statements” within the meaning of applicable Canadian and United States securities legislation (co llectively,

“forward-looking statements”). These statements relate to future events or our future performance. The use of words such as

“anticipates”, “believes”, “proposes”, “contemplates”, “generates”, “targets”, “is projected”, “is planned”, “considers” , “estimates”,

“expects”, “is expected”, “potential” and similar expressions, or statements that certain actions, events or results “may”, “ might”, “will”,

“could”, or “would” be taken, achieved, or occur, may identify forward -looking statements. All state ments other than statements of

historical fact are forward -looking statements. Specific forward -looking statements contained herein include, but are not limited to,

statements regarding the results of the PFS, completion of a feasibility study, processing capacity of the mine, anticipated mine life,

probable reserves, estimated project capital and operating costs, sustaining costs, results of test work and studies, planned

environmental assessments, the future price of metals, metal concentrate, and future exploration and development. Such forward -

looking statements are based on material factors and/or assumptions which include, but are not limited to, the estimation of mineral

resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of

future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory app rovals,

environmental risks, title disputes and the assumptions set forth he rein and in the Company’s Management’s Discussion and Analysis

(“MD&A”) for the year ended December 31, 2020, and the Company’s Annual Information Form (“AIF”) dated March 25, 2021. Such

forward-looking statements represent the Company’s management expectations, estimates and projections regarding future events or

circumstances on the date the statements are made, and are necessarily based on several estimates and assumptions that, while

considered reasonable by the Company as of the date hereof, are not guarantees of future performance. Actual events and results may

differ materially from those described herein, and are subject to significant operational, business, economic, and regulatory risks and

uncertainties. The risks and uncertainties that may affect the forward-looking statements in this press release include, among others:

the inherent risks involved in exploration and development of mineral properties, including permitting and other government a pprovals;

changes in economic conditions, including changes in the price of gold and other key variables; changes in mine plans and other factors,

including accidents, equipment breakdown, bad weather and other project execution delays, many of which are beyond the contro l of

the Company; environmental risks and unanticipated reclamation expenses; and other risk factors identified in the Company’s 2020

MD&A and AIF, and in the Company’s other periodic filings with securities and regulatory authorities in Canada and the United States

that are available on SEDAR at www.sedar.com or on EDGAR at www.sec.gov.

Readers should not place undue reliance on such forward -looking statements. The Company does not undertake any obligations to

update and/or revise any forward-looking statements except as required by applicable securities laws.

Cautionary note to U.S. Investors concerning estimates of mineral reserves and mineral resources

Skeena’s mineral reserves and mineral resources included or incorporated by reference herein have been estimated in accordance with

National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43 -101”) as required by Canadian securities regulatory

authorities, which differ from the requirements of U.S. securities laws. The terms “mineral reserve”, “proven mineral reserve”, “probable

mineral reserve”, “mineral resource”, “measured mineral resource”, “indicated mineral resource” and “inferre d mineral resource” are

Canadian mining terms as defined in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”)

“CIM Definition Standards – For Mineral Resources and Mineral Reserves” adopted by the CIM Council (as amended, the “CIM Definition

Standards”). The U.S. Securities and Exchange Commission (the “SEC”) has mineral property disclosure rules in Regulation S -K

Subpart 1300 applicable to issuers with a class of securities registered under the Securities Exchange Act of 1934 (the “Exchange Act”),

which rules were updated effective February 25, 2019 (the “SEC Mineral Property Rules”) with compliance required for the firs t fiscal

year beginning on or after January 1, 2021. Skeena is not required to provide disclosure on its mineral properties under the SEC Mineral

Property Rules or their predecessor rules under SEC Industry Guide 7 because it is a “foreign private issuer” under the Excha nge Act

and entitled to file reports with the SEC under MJDS.

The SEC Mineral Property Rules include terms describing mineral reserves and mineral resources that are substantially similar, but not

always identical, to the corresponding terms under the CIM Definition Standards. The SEC Mineral Property Rules allow estimat es of

“measured”, “indicated” and “inferred” mineral resources. The SEC Mineral Property Rules’ definitions of “proven mineral reserve” and

“probable mineral reserve” are substantially similar to the corresponding CIM Definition Standards. Investors are cautioned t hat, while

these terms are substantially similar to definitions in the CIM Definition Standards, differences exist between the definitio ns under the

SEC Mineral Property Rules and the corresponding definitions in the CIM Definition Standards. Accordingly, there is no assurance any

mineral reserves or mineral resources that Skeena may report as “proven mineral reserves”, “probable mineral reserves”, “meas ured

mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43 -101 would be the same had Skeena

prepared the mineral reserve or mineral resource estimates under the standards adopted under the SEC Mineral Property Rules.

In addition, investors are cautioned not to assume that any part or all of Skeena’s mineral resources constitute or will be converted into

reserves. These terms have a great amount of uncertainty as to their economic and legal feasibility. Accordingly, investors are cautioned

not to assume that any “measured”, “indicated”, or “inferred” mineral resources that Skeena reports are or will be economically or legally

mineable. Further, “inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertain ty as to

their economic and legal feasibility. It cannot be assumed that a ll or any part of an “inferred mineral resource” will ever be upgraded to

a higher category. Under Canadian securities laws, estimates of “inferred mineral resources” may not form the basis of feasib ility or

prefeasibility studies, except in rare cases where permitted under NI 43-101.

For these reasons, the mineral reserve and mineral resource estimates and related information presented herein may not be comparable

to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the U.S. federal

securities laws and the rules and regulations thereunder.

Table 1: Eskay Creek Project 2021 Phase II Albino Drilling Campaign Length-Weighted Drill Hole

Composites:

Hole-ID From (m) To (m) Sample Length (m) Au (g/t) Ag (g/t) AuEq (g/t) Hg (ppm) As (ppm) Sb (ppm)

SK-21-899 3.35 9.45 6.10 3.62 88.0 4.79 29 184 389

SK-21-899 9.45 12.50 3.05 3.28 190.0 5.81 25 338 629

SK-21-899 12.50 15.54 3.04 4.50 239.0 7.69 37 278 989

SK-21-899 15.54 17.07 1.53 13.80 1040.0 27.67 111 508 3,440

SK-21-899 17.07 18.59 1.52 10.30 575.0 17.97 154 514 3,460

SK-21-899 18.59 20.12 1.53 10.75 663.0 19.59 195 506 4,290

COMPOSITE 3.35 20.12 16.77 5.90 317.4 10.13 64 318 1,454

SK-21-900 2.74 6.71 3.97 0.10 4.0 0.15 3 15 41

COMPOSITE 2.74 6.71 3.97 0.10 4.0 0.15 3 15 41

SK-21-901 2.74 5.79 3.05 1.54 59.2 2.33 22 203 438

SK-21-901 5.79 7.32 1.53 2.79 75.9 3.80 30 308 642

SK-21-901 7.32 8.84 1.52 4.09 160.0 6.22 44 418 1,085

SK-21-901 8.84 10.36 1.52 6.14 268.0 9.71 66 316 1,680

SK-21-901 10.36 11.89 1.53 5.13 278.0 8.84 82 291 2,530

SK-21-901 11.89 13.41 1.52 10.40 315.0 14.60 132 670 3,420

SK-21-901 13.41 14.94 1.53 4.67 128.0 6.38 40 466 1,725

COMPOSITE 2.74 14.94 12.20 4.53 167.8 6.77 55 359 1,494

SK-21-902 3.05 6.10 3.05 3.00 91.0 4.21 21 366 464

SK-21-902 6.10 7.62 1.52 2.44 61.8 3.26 19 270 347

SK-21-902 7.62 9.14 1.52 3.48 122.0 5.11 41 325 752

SK-21-902 9.14 10.67 1.53 3.07 137.0 4.90 34 177 1,055

Hole-ID From (m) To (m) Sample Length (m) Au (g/t) Ag (g/t) AuEq (g/t) Hg (ppm) As (ppm) Sb (ppm)

COMPOSITE 3.05 10.67 7.62 3.00 100.6 4.34 27 301 617

SK-21-903 3.35 6.40 3.05 11.80 492.0 18.36 56 320 662

SK-21-903 6.40 7.92 1.52 7.60 322.0 11.89 47 305 776

SK-21-903 7.92 9.45 1.53 4.50 114.0 6.02 23 358 611

SK-21-903 9.45 10.97 1.52 2.55 94.5 3.81 23 369 451

SK-21-903 10.97 12.50 1.53 4.50 135.0 6.30 44 466 597

SK-21-903 12.50 14.02 1.52 4.86 163.0 7.03 207 308 633

SK-21-903 14.02 15.54 1.52 4.26 166.0 6.47 46 320 507

SK-21-903 15.54 17.07 1.53 0.72 22.3 1.02 6 68 104

COMPOSITE 3.35 17.07 13.72 5.84 222.2 8.80 56 315 556

SK-21-904 2.44 5.49 3.05 2.34 83.8 3.46 25 316 435

SK-21-904 5.49 7.01 1.52 3.90 162.0 6.06 39 349 820

SK-21-904 7.01 8.53 1.52 3.78 150.0 5.78 33 290 646

SK-21-904 8.53 10.06 1.53 2.96 150.0 4.96 26 236 682

SK-21-904 10.06 11.58 1.52 3.51 160.0 5.64 28 230 821

SK-21-904 11.58 13.11 1.53 5.68 172.0 7.97 29 297 824

SK-21-904 13.11 14.63 1.52 6.33 247.0 9.62 56 370 3,700

SK-21-904 14.63 16.15 1.52 0.46 18.4 0.71 6 40 789

COMPOSITE 2.44 16.15 13.71 3.48 136.3 5.30 30 272 1,016

SK-21-905 3.35 6.40 3.05 4.93 87.0 6.09 18 199 293

SK-21-905 6.40 7.92 1.52 1.75 38.9 2.27 10 95 182

COMPOSITE 3.35 7.92 4.57 3.87 71.0 4.82 15 164 256

SK-21-906 5.49 8.53 3.04 3.50 122.0 5.13 48 485 859

SK-21-906 8.53 10.06 1.53 2.70 104.0 4.09 40 507 544

SK-21-906 10.06 11.58 1.52 3.93 138.0 5.77 54 383 857

SK-21-906 11.58 13.11 1.53 3.26 119.0 4.85 38 461 683

SK-21-906 13.11 14.63 1.52 3.91 132.0 5.67 49 784 766

SK-21-906 14.63 16.15 1.52 3.39 99.0 4.71 37 672 422

SK-21-906 16.15 17.68 1.53 5.27 154.0 7.32 73 1115 753

SK-21-906 17.68 19.20 1.52 1.39 56.0 2.14 20 170 310

COMPOSITE 5.49 19.20 13.71 3.43 116.2 4.98 45 563 673

SK-21-907 3.05 6.10 3.05 2.57 101.0 3.92 28 239 986

SK-21-907 6.10 7.62 1.52 0.83 36.9 1.32 11 30 183

COMPOSITE 3.05 7.62 4.57 1.99 79.7 3.06 22 169 719

SK-21-908 2.74 4.27 1.53 2.77 97.0 4.06 44 241 636

SK-21-908 4.27 5.79 1.52 4.50 157.0 6.59 72 355 771

SK-21-908 5.79 7.32 1.53 4.08 223.0 7.05 53 418 840

SK-21-908 7.32 8.84 1.52 4.39 207.0 7.15 38 571 947

SK-21-908 8.84 10.36 1.52 3.53 199.0 6.18 61 465 900

SK-21-908 10.36 11.89 1.53 2.66 112.0 4.15 61 533 604

SK-21-908 11.89 13.41 1.52 3.66 160.0 5.79 46 654 787

SK-21-908 13.41 14.94 1.53 4.35 239.0 7.54 63 301 972

SK-21-908 14.94 16.46 1.52 3.74 124.0 5.39 41 314 554

SK-21-908 16.46 17.98 1.52 3.36 157.0 5.45 56 352 667

SK-21-908 17.98 19.51 1.53 0.30 40.8 0.84 4 44 101

COMPOSITE 2.74 19.51 16.77 3.39 155.9 5.47 49 386 707

SK-21-909 3.05 6.10 3.05 2.84 197.0 5.47 24 370 578

SK-21-909 6.10 7.62 1.52 4.08 238.0 7.25 108 534 1,355

Hole-ID From (m) To (m) Sample Length (m) Au (g/t) Ag (g/t) AuEq (g/t) Hg (ppm) As (ppm) Sb (ppm)

SK-21-909 7.62 9.14 1.52 5.16 188.0 7.67 62 549 2,200

SK-21-909 9.14 10.67 1.53 3.92 177.0 6.28 44 613 1,430

SK-21-909 10.67 12.19 1.52 4.21 166.0 6.42 41 623 1,090

SK-21-909 12.19 13.72 1.53 2.52 109.0 3.97 34 596 1,455

SK-21-909 13.72 15.24 1.52 3.46 111.0 4.94 31 489 639

SK-21-909 15.24 16.76 1.52 4.91 128.0 6.62 84 636 1,025

SK-21-909 16.76 18.29 1.53 4.05 84.1 5.17 35 660 581

SK-21-909 18.29 19.81 1.52 3.37 64.0 4.22 23 405 317

COMPOSITE 3.05 19.81 16.76 3.76 150.8 5.77 46 531 1,023

SK-21-910 2.44 3.96 1.52 2.07 61.0 2.88 12 393 250

SK-21-910 3.96 5.49 1.53 4.81 191.0 7.36 43 725 909

SK-21-910 5.49 7.01 1.52 2.43 194.0 5.02 35 736 741

SK-21-910 7.01 8.53 1.52 0.45 53.5 1.16 7 81 194

COMPOSITE 2.44 8.53 6.09 2.44 125.0 4.11 24 484 524

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths equate to 100% of reported sample lengths.

Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq composites.

Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples below detection

limit were nulled to a value of zero.

Table 2: Mine Grid Drill Hole Locations and Orientations:

Hole-ID Easting (m) Northing (m) Elevation (m) Length (m) Azimuth (°) Dip (°)

SK-21-899 6,649.0 9,675.9 1,052.2 23.2 - - 90.0

SK-21-900 6,736.6 9,661.9 1,048.1 11.9 - - 90.0

SK-21-901 6,695.7 9,641.1 1,048.5 19.5 - - 90.0

SK-21-902 6,726.8 9,604.3 1,049.3 13.7 - - 90.0

SK-21-903 6,734.3 9,496.9 1,048.0 20.1 - - 90.0

SK-21-904 6,732.5 9,441.9 1,048.0 19.2 - - 90.0

SK-21-905 6,774.5 9,457.0 1,048.1 11.6 - - 90.0

SK-21-906 6,684.0 9,359.4 1,051.1 22.9 - - 90.0

SK-21-907 6,773.4 9,404.7 1,049.9 11.3 - - 90.0

SK-21-908 6,728.2 9,379.4 1,049.9 22.6 - - 90.0

SK-21-909 6,725.5 9,330.1 1,051.5 24.4 - - 90.0

SK-21-910 6,769.6 9,349.3 1,050.1 11.6 - - 90.0