Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SKE.TO ·

Skeena Announces Discovery of New 23 Zone at Eskay Creek: 2.33 g/t AuEq over 59.91 metres and 1.08 g/t AuEq over 90.00 metres

Drill Results

Skeena Announces Discovery of New 23 Zone at Eskay Creek:

2.33 g/t AuEq over 59.91 metres and 1.08 g/t AuEq over 90.00 metres

Vancouver, BC (January 19, 2022) Skeena Resources Limited (TSX: SKE, NYSE: SKE) (“Skeena”

or the “Company”) is pleased to announce the discovery of a significant zone of near surface, footwall

style mineralization, the 23 Zone . This new zone is outside the limits of the Company’s current pit-

constrained mineral resources at the Eskay Creek gold-silver project (“Eskay Creek” or the “Project”)

located in the Golden Triangle of British Columbia. Analytical results from the recently completed drill

holes are detailed in this release. Reference images are presented at the end o f this release as well

as on the Company’s website.

New 23 Zone Discovery Highlights:

• 0.99 g/t Au, 6.5 g/t Ag (1.08 g/t AuEq) over 90.00 m (SK-21-945)

• 1.30 g/t Au, 31.4 g/t Ag (1.72 g/t AuEq) over 43.39 m (SK-21-946)

• 2.14 g/t Au, 14.6 g/t Ag (2.33 g/t AuEq) over 59.91 m (SK-21-947)

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths and zone geometries cannot be

definitively determined at this time. Grade-capping of individual assays has not been applied to the Au and Ag assays informing

the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and

are taken at 100%. Samples below detection limit were nulled to a value of zero.

New 23 Zone Discovered Outside Current Resources

Situated beyond the extents of the currently defined pit -constrained resources at Eskay Creek, the

Company has discovered a new zone of near surface Au-Ag mineralization beginning only 15 m

vertically below surface. This new 23 Zone was revealed by Q4 2021 drilling as part of the ongoing

regional exploration program.

Positioned 200 m east of the high -grade 21A Zone, the area was historically drilled from surface by

previous operators on widely spaced drill centers. Selective drill hole sampling during this era meant

that the discovery of the larger and more robust mineralized widths observed as a result of the 2021

drilling program, were missed historically. This lack of non-continuous historical sampling is evidenced

by 2021 drill hole SK-21-947 which intersected 2.14 g/t Au, 14.6 g/t Ag (2.33 g/t AuEq) over 59.91

m only metres away from historical 1990 drill hole CA90 -511 which due to non-continuous sampling

only reported 1.97 g/t AuEq and 0.84 g/t AuEq over 2.00 and 8.00 m, respectively.

Mineralization in the 23 Zone is almost exclusively hosted within dacitic volcanic rocks and to a lesser

degree, the overlying Lower Mudstone unit. As such, the Au-Ag tenor is consistent with that observed

in footwall mineralization elsewhere on the property (21A, 21B, 21C, 22 Zones). Concentrations of the

epithermal suite of elements (As, Hg, Sb) are negligible , as is the case with this style of footwall

mineralization across Eskay Creek.

Drilling to date indicates a shallow , westerly dipping geometry and the 23 Zone remains open for

expansion in all directions. Proximity to surface, in addition to the grades and widths of this evolving

zone are a perfect complement to the existing mine plan and potential throughput expansion.

NR: 22-01 | January 19, 2022

22 Zone and Eastern Limb Targets

Drilling along the southeastern strike extension of the 22 Zone was performed on 50 m spacings. Most

notably, 2021 drill hole SK-21-927 intersected 3.39 g/t Au, 4.8 g/t Ag (3.45 g/t AuEq) over 21.55 m

in the Even Lower Mudstone (ELM) approximately 200 metres southeast of the 22 Zone. This broader

interval included a visible gold bearing subinterval grading 59.10 g/t Au, 61.5 g/t Ag (59.92 g/t AuEq)

over 0.65 m and 19.55 g/t Au, 7.4 g/t Ag (19.65 g/t AuEq) over 0.95 m.

Gold in soil anomalies supported by geological considerations were targeted by nine drill holes on the

eastern limb of the property. Despite intersecting highly altered host rocks, no significant grades were

returned in these specific locations.

Current Status - Exploration

The regional exploration drilling program was designed to pragmatically test near surface targets

across the property with the goal of delineating additional near surface resources to supplement the

existing mine plan. To date, 72 drill holes totaling 12,890 m have been completed representing ~37%

of the budgeted 35,000 m drill program. The outstanding meterage will be drilled once the Albino

Waste Facility drill program has been completed in Q2 2022.

About Skeena

Skeena Resources Limited is a Canadian mining exploration and development company focused on

revitalizing the past-producing Eskay Creek gold-silver mine located in Tahltan Territory in the Golden

Triangle of northwest British C olumbia, Canada. The Company released a Prefeasibility Study for

Eskay Creek in July 2021 which highlights an open -pit average grade of 4.57 g/t AuEq, an after -tax

NPV5% of C$1.4B, 56% IRR, and a 1.4 -year payback at US$1,550/oz Au. Skeena is currently

completing both infill and exploration drilling to advance Eskay Creek to full Feasibility Study in Q1

2022.

On behalf of the Board of Directors of Skeena Resources Limited,

Walter Coles Jr.

President & CEO

Contact Information

Investor Inquiries: [email protected]

Office Phone: +1 604 684 8725

Company Website: www.skeenaresources.com

Qualified Persons

Exploration activities at the Eskay Creek Project are administered on site by the Company’s

Exploration Managers, Raegan Markel, P.Geo., John Tyler and Director of Exploration, Adrian Newton

P.Geo. In accordance with National Instrument 43 -101 Standards of Disclosure for Mineral Projects,

Paul Geddes, P.Geo. Vice President Exploration and Resource Development, is the Qualified Person

for the Company and has prepared, validated and approved the technical and scientific content of this

news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting,

documenting, and reporting the exploration activities on its projects.

Quality Assurance – Quality Control

Once received from the drill and processed, all drill core samples are s awn in half, labelled and

bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are

applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC)

samples at regular intervals in the sample stream, including blanks and reference materials with all

sample shipments to monitor laboratory performance. The QAQC program was designed and

approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s

Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British

Columbia for preparation and analysis. The ALS facility is accr edited to the ISO/IEC 17025 standard

for gold assays and all analytical methods include quality control materials at set frequencies with

established data acceptance criteria. The entire sample is crushed and 1 kg is pulverized. Analysis for

gold is by 50 g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and

upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 50 g

fire assay fusion with gravimetric finish. Analysis for silver is by 50 g fire assay fusion with gravimetric

finish with a lower limit of 5ppm and upper limit of 10,000 ppm. Samples with silver assays greater

than 10,000 ppm are re -analyzed using a gravimetric silver concentrate method. A selected number

of samples are a lso analyzed using a 48 multi -element geochemical package by a 4 -acid digestion,

followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP -AES) and Inductively

Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regi a digest with

Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP -AES) finish. Samples with sulfur

reporting greater than 10% from the multi -element analysis are re -analyzed for total sulfur by Leco

furnace and infrared spectroscopy.

Cautionary note regarding forward-looking statements

Certain statements and information contained or incorporated by reference in this press release constitute “forward-looking information”

and “forward -looking statements” within the meaning of applicable Canadian and United States securities legislation (collectively,

“forward-looking statements”). These statements relate to future events or our future performance. The use of words such as

“anticipates”, “believes”, “proposes”, “contemplates”, “generates”, “targets”, “is projected”, “is planned”, “considers”, “estimates”,

“expects”, “is expected”, “potential” and similar expressions, or statements that certain actions, events or results “may”, “ might”, “will”,

“could”, or “would” be taken, achieved, or occu r, may identify forward -looking statements. All statements other than statements of

historical fact are forward -looking statements. Specific forward -looking statements contained herein include, but are not limited to,

statements regarding the results of th e PFS, completion of a feasibility study, processing capacity of the mine, anticipated mine life,

probable reserves, estimated project capital and operating costs, sustaining costs, results of test work and studies, planned

environmental assessments, the f uture price of metals, metal concentrate, and future exploration and development. Such forward -

looking statements are based on material factors and/or assumptions which include, but are not limited to, the estimation of mineral

resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of

future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory app rovals,

environmental risks, title disputes and the assumptions set forth herein and in the Company’s Management’s Discussion and Analysis

(“MD&A”) for the year ended December 31, 2020, and the Company’s Annual Information Form (“AIF”) dated March 25, 2021. Such

forward-looking statements represent the Company’s management expectations, estimates and projections regarding future events or

circumstances on the date the statements are made, and are necessarily based on several estimates and assumptions that, while

considered reasonable by the Company as of the date hereof, are not guarantees of future performance. Actual events and results may

differ materially from those described herein, and are subject to significant operational, business, economic, and regulatory risks and

uncertainties. The risks and uncertainties that may affect the forward -looking statements in this press release include, among others:

the inherent risks involved in exploration and development of mineral properties, including permitting and other government a pprovals;

changes in economic conditions, including changes in the price of gold and other key variables; changes in mine plans and other factors,

including accidents, equipment breakdown, bad weather and other project execution delays, many of which are be yond the control of

the Company; environmental risks and unanticipated reclamation expenses; and other risk factors identified in the Company’s 2 020

MD&A and AIF, and in the Company’s other periodic filings with securities and regulatory authorities in Can ada and the United States

that are available on SEDAR at www.sedar.com or on EDGAR at www.sec.gov.

Readers should not place undue reliance on such forward -looking statements. The Company does not undertake any obligations to

update and/or revise any forward-looking statements except as required by applicable securities laws.

Cautionary note to U.S. Investors concerning estimates of mineral reserves and mineral resources

Skeena’s mineral reserves and mineral resources included or incorporated by reference herein have been estimated in accordance with

National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43 -101”) as required by Canadian securities regulatory

authorities, which differ from the requirements of U.S. securities laws. The terms “mineral reserve”, “proven mineral reserve”, “probable

mineral reserve”, “mineral resource”, “measured mineral resource”, “indicated mineral resource” and “i nferred mineral resource” are

Canadian mining terms as defined in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”)

“CIM Definition Standards – For Mineral Resources and Mineral Reserves” adopted by the CIM Council (as amended, the “CIM Definition

Standards”). The U.S. Securities and Exchange Commission (the “SEC”) has mineral property disclosure rules in Regulation S -K

Subpart 1300 applicable to issuers with a class of securities registered under the Securities Exchange Act of 1934 (the “Exchange Act”),

which rules were updated effective February 25, 2019 (the “SEC Mineral Property Rules”) with compliance required for the firs t fiscal

year beginning on or after January 1, 2021. Skeena is not required to provide disclosure on its mineral properties under the SEC Mineral

Property Rules or their predecessor rules under SEC Industry Guide 7 because it is a “foreign private issuer” under the Excha nge Act

and entitled to file reports with the SEC under MJDS.

The SEC Mineral Property Rules include terms describing mineral reserves and mineral resources that are substantially similar, but not

always identical, to the corresponding terms under the CIM Definition Standards. The SEC Mineral Property Rules allow estimat es of

“measured”, “indicated” and “inferred” mineral resources. The SEC Mineral Property Rules’ definitions of “proven mineral rese rve” and

“probable mineral reserve” are substantially similar to the corresponding CIM Definition Standards. Investors are cautio ned that, while

these terms are substantially similar to definitions in the CIM Definition Standards, differences exist between the definitio ns under the

SEC Mineral Property Rules and the corresponding definitions in the CIM Definition Standards. Accordingly, there is no assurance any

mineral reserves or mineral resources that Skeena may report as “proven mineral reserves”, “probable mineral reserves”, “meas ured

mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43 -101 would be the same had Skeena

prepared the mineral reserve or mineral resource estimates under the standards adopted under the SEC Mineral Property Rules.

In addition, investors are cautioned not to assume that any part or all of Skeena’s mineral resources constitute or will be converted into

reserves. These terms have a great amount of uncertainty as to their economic and legal feasibility. Accordingly, investors are cautioned

not to assume that any “measured”, “indicated”, or “inferred” mineral resources that Skeena reports are or will be economically or legally

mineable. Further, “inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertain ty as to

their economic and legal feasibility. It cannot be assumed that all or any part of an “inferred mineral resource” will ever be upgraded to

a higher category. Under Canadian securities laws, estimates of “inferred mineral resources” may not form the basis of feasib ility or

prefeasibility studies, except in rare cases where permitted under NI 43-101.

For these reasons, the mineral reserve and mineral resource estimates and related information presented herein may not be comparable

to similar information made public by U.S. companies subject to the reporting and disc losure requirements under the U.S. federal

securities laws and the rules and regulations thereunder.

Table 1: Eskay Creek Project 2021 Exploratory Drilling Campaign Length-Weighted Drill Hole

Composites:

Hole-ID From (m) To (m) Sample Length (m) Au (g/t) Ag (g/t) AuEq (g/t) Area

SK-21-894 85.00 85.50 0.50 0.40 14.0 0.59 22

SK-21-894 96.15 100.31 4.16 0.47 18.8 0.72 22

SK-21-895 20.75 22.71 1.96 0.17 25.4 0.51 22

SK-21-895 115.40 115.98 0.58 1.81 19.3 2.07 22

SK-21-895 133.50 134.64 1.14 0.83 5.2 0.90 22

SK-21-895 160.56 163.40 2.84 0.37 21.8 0.67 22

SK-21-895 223.52 224.37 0.85 0.57 3.2 0.61 22

SK-21-895 236.50 239.00 2.50 1.97 2.9 2.01 22

SK-21-895 284.20 287.00 2.80 3.06 7.9 3.17 22

SK-21-896 22.63 23.20 0.57 1.96 37.4 2.46 22

SK-21-896 46.14 49.00 2.86 0.56 7.5 0.66 22

SK-21-896 65.00 68.46 3.46 6.73 22.5 7.03 22

INCLUDING 66.50 67.50 1.00 21.50 43.1 22.07 22

SK-21-896 79.00 80.00 1.00 0.63 18.8 0.88 22

SK-21-896 141.38 158.00 16.62 0.72 6.0 0.80 22

SK-21-896 186.50 187.50 1.00 1.01 6.8 1.10 22

SK-21-896 212.25 213.50 1.25 0.63 2.2 0.66 22

SK-21-897 19.50 20.98 1.48 0.63 16.2 0.85 22

Hole-ID From (m) To (m) Sample Length (m) Au (g/t) Ag (g/t) AuEq (g/t) Area

SK-21-897 35.50 46.40 10.90 1.04 24.4 1.37 22

SK-21-897 97.18 98.08 0.90 0.42 69.5 1.35 22

SK-21-898 35.00 36.09 1.09 0.60 67.9 1.51 22

SK-21-898 120.05 121.00 0.95 0.23 31.2 0.65 22

SK-21-911 PENDING 22

SK-21-912 ABANDONED 22

SK-21-913 81.83 82.50 0.67 0.56 24.3 0.88 22

SK-21-913 93.50 101.00 7.50 0.34 5.4 0.41 22

SK-21-914 134.91 138.29 3.38 0.96 1.8 0.99 22

SK-21-922 PENDING 22

SK-21-923 PENDING 22

SK-21-924 PENDING 22

SK-21-925 33.00 35.45 2.45 0.97 1.5 1.00 22

SK-21-925 85.79 86.82 1.03 0.55 3.5 0.60 22

SK-21-925 94.17 95.59 1.42 0.94 22.8 1.24 22

SK-21-925 137.50 138.50 1.00 0.95 2.1 0.98 22

SK-21-926 32.50 37.00 4.50 1.24 2.5 1.27 22

SK-21-926 92.20 96.20 4.00 0.48 19.1 0.73 22

SK-21-926 150.50 153.50 3.00 2.68 0.6 2.68 22

SK-21-927 13.95 35.50 21.55 3.39 4.8 3.45 22

INCLUDING 14.90 15.55 0.65 59.10 61.5 59.92 22

AND 15.55 16.50 0.95 19.55 7.4 19.65 22

SK-21-927 83.50 85.00 1.50 0.69 2.0 0.72 22

SK-21-927 94.00 97.00 3.00 0.88 4.9 0.94 22

SK-21-927 144.00 145.05 1.05 1.56 1.1 1.57 22

SK-21-928 14.50 36.00 21.50 0.58 1.5 0.59 22

SK-21-928 178.00 179.00 1.00 1.02 2.4 1.05 22

SK-21-929 20.80 23.50 2.70 0.64 1.7 0.66 22

SK-21-929 59.75 66.00 6.25 0.52 4.2 0.57 22

SK-21-929 111.00 117.00 6.00 0.67 3.6 0.72 22

SK-21-929 139.00 140.50 1.50 0.52 0.5 0.52 22

SK-21-929 194.50 196.00 1.50 0.79 0.5 0.79 22

SK-21-930 105.00 110.87 5.87 1.35 10.5 1.50 22

SK-21-930 120.50 125.00 4.50 0.56 0.5 0.56 22

SK-21-930 132.50 134.00 1.50 0.58 0.5 0.58 22

SK-21-931 PENDING

SK-21-932 NSA EASTERN LIMB

SK-21-933 203.50 204.00 0.50 0.65 3.3 0.69 EASTERN LIMB

SK-21-933 216.00 216.50 0.50 0.49 15.9 0.70 EASTERN LIMB

SK-21-934 NSA EASTERN LIMB

SK-21-935 NSA EASTERN LIMB

SK-21-936 NSA EASTERN LIMB

SK-21-937 PENDING

SK-21-938 NSA EASTERN LIMB

SK-21-939 31.45 38.65 7.20 0.26 10.1 0.39 EASTERN LIMB

SK-21-940 61.60 65.30 3.70 0.26 6.4 0.35 EASTERN LIMB

SK-21-940 112.00 112.50 0.50 0.37 21.0 0.65 EASTERN LIMB

SK-21-941 16.50 18.00 1.50 1.66 0.8 1.67 23

SK-21-941 52.00 64.92 12.92 0.69 8.9 0.81 23

SK-21-942 48.00 49.00 1.00 0.60 4.5 0.66 23

SK-21-942 100.62 105.00 4.38 0.54 4.4 0.59 23

SK-21-942 119.00 141.50 22.50 0.55 0.6 0.55 23

SK-21-942 167.63 168.50 0.87 0.57 0.6 0.58 23

SK-21-943 8.00 9.50 1.50 0.56 9.1 0.68 23

SK-21-943 67.50 78.00 10.50 0.36 0.9 0.37 23

Hole-ID From (m) To (m) Sample Length (m) Au (g/t) Ag (g/t) AuEq (g/t) Area

SK-21-944 42.00 54.57 12.57 0.46 16.8 0.69 23

SK-21-944 114.23 123.50 9.27 1.05 4.8 1.11 23

SK-21-944 132.50 152.50 20.00 0.64 7.1 0.73 23

SK-21-944 188.00 190.05 2.05 0.51 22.4 0.81 23

SK-21-945 22.00 112.00 90.00 0.99 6.5 1.08 23

INCLUDING 22.00 23.15 1.15 17.95 23.1 18.26 23

SK-21-945 119.50 136.00 16.50 0.61 1.5 0.63 23

SK-21-946 29.00 72.39 43.39 1.30 31.4 1.72 23

SK-21-946 80.00 101.50 21.50 0.59 2.2 0.62 23

SK-21-946 112.00 118.00 6.00 0.62 1.6 0.64 23

SK-21-947 44.58 104.49 59.91 2.14 14.6 2.33 23

INCLUDING 56.00 57.00 1.00 21.90 57.1 22.66 23

AND 57.00 58.00 1.00 19.30 50.5 19.97 23

SK-21-947 123.43 124.00 0.57 0.50 19.5 0.76 23

SK-21-947 172.50 173.50 1.00 0.56 13.8 0.74 23

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths and zone geometries cannot be definitively

determined at this time . Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length -

weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%.

Samples below detection limit were nulled to a value of zero. NSA – No Significant Assays.

Table 2: Mine Grid Drill Hole Locations and Orientations:

Hole-ID Easting (m) Northing (m) Elevation (m) Length (m) Azimuth (°) Dip (°)

SK-21-894 9623.1 8649.8 1080.2 289.5 50.0 -53.0

SK-21-895 9622.9 8649.6 1080.2 296.2 65.0 -62.0

SK-21-896 9750.3 8659.0 1032.1 233.2 250.6 -72.2

SK-21-897 9749.8 8660.0 1032.0 151.8 282.0 -50.0

SK-21-898 9751.5 8656.3 1032.1 132.7 183.0 -50.0

SK-21-913 9715.2 8585.2 1040.7 103.5 265.0 -50.0

SK-21-914 9715.8 8585.4 1040.7 151.2 232.0 -50.0

SK-21-925 9812.4 8614.3 986.2 199.3 281.1 -50.1

SK-21-926 9812.0 8612.9 986.2 202.0 246.0 -50.0

SK-21-927 9811.7 8567.8 983.0 150.0 253.8 -50.1

SK-21-928 9812.3 8569.0 983.1 200.0 276.8 -74.1

SK-21-929 9790.1 8468.1 988.9 229.0 25.0 -50.0

SK-21-930 9790.9 8465.4 988.9 152.0 82.1 -50.1

SK-21-932 11049.5 9322.5 836.6 190.0 127.3 -68.2

SK-21-933 11049.1 9323.8 836.6 219.0 106.8 -49.6

SK-21-934 11048.5 9325.5 836.6 219.0 67.0 -50.1

SK-21-935 10623.0 9678.2 934.1 225.0 117.2 -50.5

SK-21-936 10622.8 9679.1 934.0 209.1 77.2 -50.6

SK-21-938 10542.4 9447.3 1005.6 102.0 191.7 -50.3

SK-21-939 10543.9 9447.6 1005.6 162.0 127.4 -50.5

SK-21-940 10544.3 9449.6 1005.6 231.0 77.2 -50.0

SK-21-941 10161.5 10104.3 977.0 94.6 91.8 -84.9

SK-21-942 10159.7 10105.1 977.0 204.0 292.0 -70.0

SK-21-943 10161.8 10104.1 977.0 205.2 92.0 -60.2

SK-21-944 10158.3 10105.6 977.0 196.0 292.1 -49.9

SK-21-945 10069.1 10066.6 959.0 170.5 137.2 -50.1

SK-21-946 10069.7 10069.3 959.0 160.0 92.5 -60.0

SK-21-947 10066.2 10071.8 959.0 190.5 326.5 -80.1