Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SIG.V ·

Sitka Gold Mobilizes Crew and Equipment for Drill Program at the Burro Creek Gold Property, Arizona

Exploration Programs

Sitka Gold Corp.

1500 - 409 Granville Street

Vancouver, BC, V6C 1T2

NEWS RELEASE

CSE: SIG

November 12th, 2019

NR 19-11

www.sitkagoldcorp.com

Sitka Gold Mobilizes Crew and Equipment for Drill Program at

the Burro Creek Gold Property, Arizona

VANCOUVER, CANADA – November 12 th, 2019: Sitka Gold Corp. (“Sitka” or the “Company” )

(CSE: SIG; FSE: 1RF) is pleased to announce that it has begun mobilizing crew and equipment in

preparation for the upcoming diamond drilling program at its Burro Creek Gold Property ( “Burro

Creek” or the “Property”), which contains the Burro Creek Gold Deposit (the “Burro Deposit”), locate d

in Mohave County, Arizona (see Sitka’s news release dated September 21, 2018) . The drill program

will focus on upgrading and expanding the Burro Deposit alon g the recently interpreted extension of

the Burro Creek Gold vein (the “Burro Vein”) over a strike length of approximately 1.3 kilometres (see

Figure 1 map for details) and will consist of up to 3 ,500 metres of drilling and 50 drill holes. No

previous drilling has been conducted over this area. Sitka has secured DrillRite LLC, an experienced

and highly regarded exploration drill contractor based in Elko, Nevada, to carry out its drilling program

at Burro Creek.

CEO and Director of Sitka Gold, Cor Coe , P.Geo. commented, “The mobilization of crew and

equipment to the Burro Creek Gold Property is an exciting milestone for Sitka. The historical gold and

silver resource combined with the newly i dentified 1.3 kilometre long Burro Vein strike length

interpretation provides Sitka with an opportunity to upgrade and significantly expand upon the Burro

Deposit. Previous diamond drilling results on the Property include bonanza grade intercepts, such as

4.78 metres of 7.99 g/t gold and 192.72 g/t silver, including 1.04 metres of 31.80 g/t gold and 759.00

g/t silver1, and we look forward to seeing the results that this drill program will produce”.

Figure 1: 2013 MMI Soil Sampling Results

Burro Creek Gold Property Highlights

The Burro Deposit contains a Historical Mineral Resource Estimate (the “Burro Deposit”) as

summarized below:

INDICATED RESOURCE:

AuEq (g/t)* Gold Silver Gold Equivalent

Cut-Off Tonnes Grade (g/t) Ounces Grade (g/t) Ounces Grade (g/t) Ounces

0.5 g/t 2,331,871 1.01 75,567 36.77 2,756,778 1.63 122,491

INFERRED RESOURCE:

AuEq (g/t)* Gold Silver Gold Equivalent

Cut-Off Tonnes Grade (g/t) Ounces Grade (g/t) Ounces Grade (g/t) Ounces

0.5 g/t 2,247,069 0.60 43,243 30.95 2,236,113 1.13 81,304

*AuEq metal prices: US$846.00/oz gold, US$14.40/oz silver (3-year average as at January 31, 2011)

The Burro Creek Property is located 1.6 km off of State Highway 93 in Mohave County, Arizona,

approximately 265 km southeast of Las Vegas, N evada and 200 km north of Phoenix, Arizona. The

750 acre property is accessible via dirt road and consists of four patented mineral claims (situated on

private land) and 35 surrounding lode mineral claims. The Property is situated in an active mining belt

that includes Freeport McMoran Copper & Gold Inc.’s neighbouring Bagdad Mine ( www.fcx.com).

Northwest Arizona also hosts other gold & silver development properties such as Northern V ertex

Mining Corp.’s Moss Mine (www.northernvertex.com).

The Property covers a low-sulphidation epithermal vein system (the “Burro Vein”) that hosts gold and

silver Indicated and Inferred Historical Mineral Resource estimates. The Burro Vein has been traced

for over 1.7 km with reported widths of up to 45 meters and remains open for expansion along strike

near surface and at depth. Results from a Mobile Metal Ion (MMI) soil survey conducted in 2013 by

the previous operators on the Property returned an anomalous gold and silver trace across the

basalt cover that is interpreted to be the buried portion of the Burro Vein, creating an additional strike

length of approximately 1.3 km (See Figure 1 below). This anomaly provides immediate drill targets

to t est the continuity of the Burro Vein , potentially expand the known Historical Mineral Resource

Estimate and bring the historic resource back up to current reporting standards. Parallel high-tension

power lines lie wi thin 1.6 km of the Burro D eposit and wat er rights on the P roperty have been

secured, providing the project with excellent infrastructure for future development.

The Burro Deposit

The Burro Deposit hosts a Historical Mineral Resource Estimate as defined by the National Instrument

43-101 Standards for Disclosure for Mineral Projec ts and is not considered by the Company to be a

Current Mineral Resource, as Sitka Qualified Persons have not completed sufficient work to classify it

as a Current Mineral Resource. The Indicated and Inferred Resources r eferenced above are taken

from a technical report filed on SEDAR titled “ TECHNICAL REPORT on the BURRO CREEK

PROJECT, Sections 10, 11, 14, 15, Township 14N, Range 12W , Kaiser Spring 7.5 minute

Quadrangle Latitude 34 °32.5’N Longitude 113 °29.5’W, Greenwood M ining District, Arizona ” for

Northern Freegold Resources Ltd. by Jean Pautler, P.Geo., Allan Armitage, Ph. D., P. Geol. and Joe

Campbell, P. Geo., January 31, 2011.

The Historical Mineral Resource Estimate of the Burro Deposit is based on 87 reverse circulation (RC)

and diamond drill holes and 9 sampled a dits totalling 6,672 m and 2 ,682 assays. Mineralization was

constrained within a 3-dimensional geological solid using Gemcom software. Practices consistent with

CIM Best Practices Guidelines, (2005) were a pplied to the generation of the Historical Mineral

Resource Estimate and the parameters of the modeling a re fully described in the NI 43-101 report

referenced above.

The Company considers the NI 43-101 report to be relevant and reliable given that no addi tional work

of significance has been completed since the issuance of the Historical Mineral Resource Estimate.

1Northern Freegold Resources Ltd. news release dated May 20, 2008

This news release has been reviewed and approved by Donald Penner, P. Geo., President of Sitka

Gold Corp., a “Qualified Person” under National Instrument 43 -101 Standard for Disclosure for

Mineral Projects.

About Sitka Gold Corp.

Sitka Gold Corp. is a mineral exploration company headquartered in Canada and managed by a team

of experienced mining industry professionals. The Company is focused on exploring for economically

viable mineral deposits with its primary emphasis on gold , silver and copper mineral properties of

merit. Sitka currently has an option to acquire a 100% interes t in the RC Gold property in the Yukon,

an option to acquire a 100% interest in the Burro Creek Gold property in Arizona and owns a 100%

interest in its Coppermine River project in Nunavut and the Alpha Gold property in Nevada. Directors

and Management own over 25% of the outstanding shares of Sitka Gold, a solid indication of their

alignment with shareholders’ interests.

ON BEHALF OF THE BOARD OF DIRECTORS OF

SITKA GOLD CORP.

“Donald Penner”

President and Director

For more information contact:

Donald Penner

President & Director

778-212-1950

[email protected]

or

Cor Coe

CEO & Director

604-817-4753

[email protected]

or

Peter MacLean

Director

604-781-8513

[email protected]

Cautionary and Forward-Looking Statements

This news re lease contains forward ‐looking statements and forward ‐looking information within the

meaning of applicable securities laws. These statements relate to future events or future performance.

All statements other than statements of historical fact may be forward ‐looking statements or

information. Forward ‐looking statements and information are often, but not always, identified by the

use of words such as “appear”, “seek”, “anticipate”, “plan”, “continue”, “estimate”, “approximate”,

“expect”, “may”, “will”, “project”, “predict”, “pote ntial”, “targeting”, “intend”, “could”, “might”, “should”,

“believe”, “would” and similar expressions.

Forward-looking statements and information are provided for the purpose of providing information

about the current expectations and plans of management of the Company relating to the future.

Readers are cautioned that reliance on such statements and information may not be appropriate for

other purposes, such as making investment decisions. Since forward ‐looking statements and

information address future events and conditions, by their very nature they involve inherent risks and

uncertainties. Actual results could differ materially from those currently anticipated due to a number of

factors and risks. Thes e include, but are not limited to, the expected timing and terms of the private

placement, use of proceeds, anticipated work program, required approvals in connection with the

work program and the ability to obtain such approvals. Accordingly, readers shou ld not place undue

reliance on the forward ‐looking statements, timelines and information contained in this news release.

Readers are cautioned that the foregoing list of factors is not exhaustive.

The forward ‐looking statements and information contained in this news release are made as of the

date of this news release and no undertaking is given to update publicly or revise any forward ‐looking

statements or information, whether as a result of new information, future events or otherwise, unless

so required by applicable securities laws or the CSE. The forward-looking statements or information

contained in this news release are expressly qualified by this cautionary statement.

Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of the

CSE) accepts responsibi lity for the adequacy or accuracy of this release. No stock exchange,

securities commission or other regulatory authority has approved or disapproved the information

contained herein.