Sitka Gold Corp. Closes $5.0 Million Private Placement
NEWS RELEASE
November 7, 2024
NR 24-26
www.sitkagoldcorp.com
Sitka Gold Corp. Closes $5.0 Million Private Placement
NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES
VANCOUVER, CANADA – November 7, 2024: Sitka Gold Corp. (“Sitka” or the “Company”)
(TSXV:SIG) (FSE:1RF) (OTCQB:SITKF) is pleased to announce that the Company has closed a
non-brokered private placement for aggregate gross proceeds of $4,999,020 (the “Offering”) through
the issuance of 9,802,000 flow-through common shares in the capital of the Company (the “FT
Shares”) sold at a price of $0.51 per FT Share.
“This financing enables us to move forward with a healthy treasury of over $15 million and expand our
drilling efforts across the extensive gold system identified at our road accessible, district-scale RC
Gold Project, where two gold deposits have been discovered to date and several promising targets
await further drill advancement”, commented Cor Coe, CEO and Director of Sitka.
Each FT Share was issued as a “flow-through share” within the meaning of subsection 66(15) of the
Income Tax Act (Canada).
The Company intends to use the net proceeds of the Offering on exploration and development
programs on the Company's flagship RC Gold Project in the Yukon Territory, which expenditures will
qualify as “Canadian Exploration Expenses” as such term is defined in paragraph (f) of the definition
of “Canadian exploration expense” in subsection 66.1(6) of the Tax Act and “flow through mining
expenditures” as defined in subsection 127(9) of the Tax Act, which will be incurred on or before
December 31, 2025 and renounced with an effective date no later than December 31, 2024, to the
purchasers of the FT Shares.
The Offering remains subject to final acceptance from the TSX Venture Exchange. All securities
issued pursuant to the Offering are subject to a hold period expiring on March 8, 2025.
About the flagship RC Gold Project
The RC Gold Project consists of a 431 square kilometre contiguous district-scale land package
located in the heart of Yukon's Tombstone Gold Belt. The project is located approximately 100
kilometres east of Dawson City, which has a 5,000 foot paved runway, and is accessed via a
secondary gravel road from the Klondike Highway which is usable year-round and is an approximate
2 hour drive from Dawson City. It is the largest consolidated land package strategically positioned
mid-way between the Eagle Gold Mine and the past producing Brewery Creek Gold Mine.
On January 19, 2023 Sitka Gold announced an Initial Mineral Resource Estimate prepared in
accordance with National Instrument 43-101 (“NI 43-101”) guidelines for the RC Gold Property of
1,340,000 ounces of gold(1). The road accessible, pit constrained Mineral Resource is classified as
inferred and is contained in two zones: The Blackjack and Eiger deposits with 900,000 ounces of
gold grading 0.83 g/t and 440,000 ounces of gold grading 0.68 g/t respectively. Both of these
deposits are at/near surface, are potentially open pit minable and amenable to heap leaching, with
initial bottle roll tests indicating that the gold is not refractory and has high gold recoveries of up to
94% with minimal NaCN consumption (see News Release July 13, 2022). The Mineral Resource
estimate is presented in the following table at a base case cut-off grade of 0.25 g/t Au:
RC Gold Inferred Mineral Resource Estimate
Blackjack Zone
COG g/t Au
0.20
0.25
0.30
0.35
0.40
Tonnes
000's
35,798
33,743
31,282
29,065
26,975
Au g/t
0.80
0.83
0.88
0.92
0.96
Eiger Zone
0z Au
000's
921
900
885
860
833
Tonnes
000's
32,523
27,362
22,253
17,817
14,506
Au g/t
0.45
0.50
0.55
0.60
0.66
Combined
0z Au
000's
471
440
393
344
308
Tonnes
000's
68,321
61,105
53,535
46,882
41,481
Au g/t
0.63
0.68
0.74
0.80
0.86
0z Au
000's
1,391
1,340
1,279
1,203
1,140
Notes
1. Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of January 19,
2023. Mineral Resources are classified using the 2014 CIM Definition Standards.
2. The cut-off grade of 0.25 g/t Au is believed to provide a reasonable margin over operating and sustaining costs for open-pit
mining and processing
3. Mineral resources are constrained by an optimised pit shell using the following assumptions: US$1800/oz Au price; a 45°
pit slope; assumed metallurgical recovery of 85%; mining costs of US$2.00 per tonne; processing costs of US$8.00 per
tonne; G&A of US$1.50/t.
4. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
5. Totals may not sum due to rounding.
To date, 76 diamond drill holes have been drilled on the property by the Company for a total of
approximately 28,535 metres including 20 drill holes totalling 9,263 metres completed in 2024
focused on exploration and expanding the initial resource. The drilling in 2024, so far, produced
results of up to 678.1 m of 1.04 g/t gold from 4.4 m including 409.5 m of 1.36 g/t gold from 273.0 m,
93.0 m of 2.57 g/t gold from 589.5 m and 5.5 m of 17.59 g/t gold from 589.5 m in hole
DDRCCC-24-068 (see news release dated October 21, 2024). Assay results for a total of eight drill
holes at Blackjack, Rhosgobel (5 kms south of the Blackjack deposit) and Pukelman (2 kms SE of the
Blackjack deposit) targeting known intrusion related gold mineralization are pending.
(1)
Simpson, R. January 19, 2023. Clear Creek Property, RC Gold Project, NI 43-101 Technical Report, Dawson Mining District, Yukon Territory
About Sitka Gold Corp.
Sitka Gold Corp. is a well-funded mineral exploration company headquartered in Canada with over
$15 million in its treasury and no debt. The Company is managed by a team of experienced industry
professionals and is focused on exploring for economically viable mineral deposits with its primary
emphasis on gold, silver and copper mineral properties of merit. Sitka is currently advancing its 100%
owned, 431 square kilometre flagship RC Gold Project located within the Tombstone Gold Belt in the
Yukon Territory. The Company is also advancing its Alpha Gold Project in Nevada and currently has
drill permits for its Burro Creek Gold and Silver Project in Arizona and the Coppermine River Project
in Nunavut.
The Company recently announced an NI 43-101 compliant initial inferred Mineral Resource
Estimate of 1,340,000 ounces of gold(1) beginning at surface and grading 0.68 g/t at its RC Gold
Project in Yukon (see news release dated January 19, 2023).
(1)
Simpson, R. January 19, 2023. Clear Creek Property, RC Gold Project, NI 43-101 Technical Report, Dawson Mining District, Yukon Territory
*For more detailed information on the underlying properties please visit our website at www.sitkagoldcorp.com
The scientific and technical content of this news release has been reviewed and approved by Cor
Coe, P.Geo., Director and CEO of the Company, and a Qualified Person (QP) as defined by National
Instrument 43-101.
ON BEHALF OF THE BOARD OF DIRECTORS OF
SITKA GOLD CORP.
“Donald Penner”
President and Director
For more information contact:
Donald Penner
or
Cor Coe
President & Director
CEO & Director
778-212-1950
604-817-4753
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of
this release.
Cautionary and Forward-Looking Statements
This release includes certain statements and information that may constitute forward-looking
information within the meaning of applicable Canadian securities laws. Forward-looking statements
relate to future events or future performance and reflect the expectations or beliefs of management of
the Company regarding future events. Generally, forward-looking statements and information can be
identified by the use of forward-looking terminology such as “intends” or “anticipates”, or variations of
such words and phrases or statements that certain actions, events or results “may”, “could”, “should”,
“would” or “occur”. This information and these statements, referred to herein as "forward‐looking
statements", are not historical facts, are made as of the date of this news release and include without
limitation, statements regarding discussions of future plans, estimates and forecasts and statements
as to management's expectations and intentions with respect to, among other things, the
development potential of the Company’s mineral exploration projects, the use of the proceeds raised
under the Offering and the timeline on which the proceeds will be used.
In making the forward-looking statements in this news release, the Company has applied several
material assumptions, including without limitation, about: general business and economic conditions;
the nature and location of the Company’s mineral exploration projects and the timing of the ability to
commence and complete the planned exploration programs; the anticipated terms of the consents,
permits and authorizations necessary to carry out the planned exploration programs and the
Company’s ability to comply with such terms on a cost‐effective basis; the Company’s ability to
secure the necessary consulting, drilling and related services and supplies on favorable terms; the
timing of the receipt of regulatory and governmental approvals, permits and authorizations necessary
to implement and carry on the Company’s planned exploration programs; and the Company using the
proceeds of the Offering as currently anticipated and on the timeline expected.
These forward‐looking statements involve numerous risks and uncertainties and actual results might
differ materially from results suggested in any forward-looking statements. These risks and
uncertainties include, among other things, market uncertainty, the uncertainty of the results of the
Company’s anticipated work programs, risks related to the timing and cost of planned exploration
programs of the Company, and the timing of the receipt of the results therefrom; risks related to the
timing of decisions regarding the strategy and costs of exploration programs with respect to, and the
issuance of the necessary permits and authorizations required for, the Company’s exploration
programs; and that the Company will not use the proceeds of the Offering as currently anticipated.
Although management of the Company has attempted to identify important factors that could cause
actual results to differ materially from those contained in forward-looking statements or
forward-looking information, there may be other factors that cause results not to be as anticipated,
estimated or intended. There can be no assurance that such statements will prove to be accurate, as
actual results and future events could differ materially from those anticipated in such statements.
Accordingly, readers should not place undue reliance on forward-looking statements and
forward-looking information. Readers are cautioned that reliance on such information may not be
appropriate for other purposes. The Company does not undertake to update any forward-looking
statement, forward-looking information or financial outlook that are incorporated by reference herein,
except in accordance with applicable securities laws. We seek safe harbor.