Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SIG.V ·

Sitka Drills 119.0 Metres of 1.01 G/T GOLD from Surface, Including 10.7 Metres of 4.10 G/T GOLD and 1.2 Metres of 24.8 G/T GOLD, at the Contact Zone, Confirming Another Near Surface Higher-Grade GOLD Zone at Its Rc GOLD

Drill Results

NEWS RELEASE

November 12, 2025

NR 25-28

www.sitkagoldcorp.com

SITKA DRILLS 119.0 METRES OF 1.01 G/T GOLD FROM

SURFACE, INCLUDING 10.7 METRES OF 4.10 G/T GOLD

AND 1.2 METRES OF 24.8 G/T GOLD, AT THE CONTACT

ZONE, CONFIRMING ANOTHER NEAR SURFACE

HIGHER-GRADE GOLD ZONE AT ITS RC GOLD

PROJECT, YUKON

● Sitka’s initial drilling at Contact returns >100 gram -metre (g/t*m) gold interval from

surface, confirming the presence of significant gold mineralization

● DDRCCC-25-113 intersected 119.0 metres of 1.01 g/t gold from surface , including

10.7 m of 4.1 g/t gold including 1.2 m of 24.8 g/t Au, and 1.2 m of 12.25 g/t Au

● Historical drilling at Contact has returned significant high-grade gold intercepts including

hole CC10-022 which intersected 1.5 m of 147.0 g/t Au located approximately 335 m

east of hole DDRCCC-25-113 (see news release dated August 19, 2025; Figures 2 and

3)

● Mineralization at Contact -Pukelman zone remains open in all directions with drilling to

date confirming a mineralized footprint of approximately 900 m x 650 m (see Figure 2)

● Results for several holes are still pending , including from the adjacent Pukelman

target area where numerous instances of visible gold were observed in the drill core.

VANCOUVER, CANADA – November 12, 2025: Sitka Gold Corp. (“Sitka” or the

“Company”) (TSX-V:SIG) (FSE:1RF) (OTCQB:SITKF) is pleased to announce analytical

results for three diamond drill holes completed at the Contact Zone target located at its 100%

owned, road accessible RC Gold Project ( “RC Gold” or the “Project”) within the Yukon’s

prolific Tombstone Gold Belt. DDRCCC-25-113 returned impressive results with up to 119.0

metres of 1.01 g/t gold returned from surface, including 10.7 m of 4.1 g/t gold and 1.2

metres of 24.8 g/t gold , confirming significant gold mineralization at the Contact Zone.

Assays are currently pending for an additional three drill holes that were completed at Contact

along with three holes that were completed at the adjoining Pukelman target (see Figures 2

and 3). Assays are also pending for an additional 46 diamond drill holes that have been

completed across the Rhosgobel, Blackjack, Saddle, Eiger, Bear Paw and MayQu targets.

Approximately 32,000 metres of diamond drilling has been compl eted across the RC Gold

Project this year.

Table 1: Gold assay highlights for this release (see Table 2 for details)

Hole ID Zone From (m) To (m)* Length (m) Gold (g/t)

DDRCCC-25-113 Contact 15.0 134.0 119.0 1.01

Including 15.0 114.0 99.0 1.19

including

24.3 35.0 10.7 4.10

including 24.3 25.5 1.2 24.80

including 72.8 74.0 1.2 12.25

including 102.1 106.0 3.9 5.51

*Intervals are drilled core length, as insufficient drilling has been completed at this time to determine true widths.

"Initial results from Sitka’s first pass of diamond drilling at the Contact zone are very

encouraging, demonstrating the strong gold values present within this higher -grade gold

zone,” stated Cor Coe, CEO and Director of Sitka. "With an interval of over 100 gram-metres

(g/t*m) from surface in Hole 113, we can add the Contact zone to our growing list of targets

that demonstrate the potential to host additional multi -million ounce gold deposits within the

Clear Creek Intrusive Comp lex. We look forward to rece iving the remaining holes from this

zone, along with the holes that were completed this year at the adjacent Pukelman zone,

where numerous instances of visible gold were observed throughout the drill core, as we

continue to delineate the potential of this exciting target area to add ounces to the growing

gold resources at RC Gold.”

Figure 1: A cross section through the Contact Zone showing the intercepts of 119.0 m of 1.01

g/t Au, including 10.7 m of 4.10 g/t Au and 3.9 m of 5.51 g/t Au in DDRCCC-25-113.

Figure 2: A plan map of the Contact Zone target showing the drilling completed to date in

2025. All holes have intersected reduced intrusion -related gold system (RIRGS) style

mineralization including centimetre -scale, sheeted, quartz veins within a structural corri dor

cutting the metasediments. Multiple occurrences of visible gold have been observed in most

of the diamond drill holes completed to date (yellow stars). Assays are pending for the

remaining holes. Drilling to date has traced gold mineralization across a lateral extent of

approximately 900 m x 650 m and from surface to a depth of 430 m. Mineralization remains

open in all directions.

Figure 3: Plan map showing the broader Contact-Pukelman target area within a large 1.0 km

x 1.5 km gold-in-soil anomaly. Drilling to date has been focused on the core of this target area

and has traced gold mineralization across a lateral extent of approximately 90 0 m x 650 m

and from surface to a depth of 430 m. Mineralization remains open in all directions.

Figure 4: Examples of coarse visible gold (VG) observed in drill core at the Contact Zone.

Drilling at the Contact Zone has intersected VG in all six holes completed this year, including

the largest VG particles observed on the property in drill core to date (scale is the same for

all pictures). Click HERE to see additional images of VG from the Contact Zone.

Figure 5: Example of large particles of visible gold seen within a quartz vein in

metasedimentary rock in the drill core of DDRCCC-25-115 from 39.4 to 39.7 m length drilled

at the Contact zone

Figure 6: An example of drill core from DDRCC C-25-113 showing quartz veins cutting

strongly altered metasediments of the Contact Zone. The displayed section shows a well

mineralized quartz vein containing 12.25 g/t Au over 1.2 m.

CONTACT-PUKELMAN TARGET

In 2025, Sitka completed six diamond drill holes totalling 2,172 metres at Contact and three

diamond drill holes totalling 1,876 metres at Pukelman (see Figure 2). Drilling intersected

broad intervals of strongly altered metasediments cut by several quartz monzonite, and

biotite-feldspar porphyritic dykes, along with abundant, cm scale, sheeted quartz veins.

Visible gold was observed in the sheeted quartz veins and was often associated with

arsenopyrite, bismuthinite, and minor scheelite (see Figures 3 and 4).

Sitka’s 2025 drill program was designed to expand the mineralized footprint of the Contact

zone, test the zone with oriented diamond drill core to better understand controls on the

mineralization and test the linkage between the metasedimentary and intrusi on hosted

mineralization of the Contact and Pukelman zones. The Contact zone was previously drilled

in 2010 and 2011 with 1,660 metres in 12 holes of reverse circulation drilling and 254 metres

in 2 holes of diamond drilling and encountered significant min eralization in quartz veining

within metasedimentary rocks up to 450 metres south of the Pukelman intrusion. Current

drilling to date has traced gold mineralization across a lateral extent of approximately 900

metres x 650 metres and from surface to a depth of approximately 430 metres.

* While visible gold observations are very encouraging and confirm the presence of gold mineralization, they are not intended t o imply potential gold

grades. Gold assays will be published after they are received from the lab for mineralized intervals in whic h visible gold particles were noted.

Table 2: Summary of significant assay results from this release