Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SIG.V ·

Sitka Completes Phase II, Summer Diamond Drilling Program at its RC Gold Project, Yukon

Exploration Programs

NEWS RELEASE

August 17, 2022

NR 22-25

www.sitkagoldcorp.com

Sitka Completes Phase II, Summer Diamond Drilling Program at

its RC Gold Project, Yukon

VANCOUVER,

CANADA

–

August

17,

2022:

Sitka

Gold

Corp.

(“Sitka”

or

the

“Company”)

(CSE:SIG)

(FSE:1RF)

(OTCQB:SITKF)

is

pleased

to

announce

that

it

has

completed

the

Phase

II

summer

diamond

drilling

program

at

its

district-scale,

road

accessible

RC

Gold

Project

(“RC

Gold”

or

the “Project”) located in the Yukon’s prolific Tombstone Gold Belt (TGB).

Summer

drilling

at

RC

Gold

was

completed

ahead

of

schedule

utilizing

three

drill

rigs.

The

Company

has

now

completed

a

total

of

20

diamond

drill

holes

for

approximately

6,500

metres

(m)

during

two

phases

of

drilling

(winter

and

summer)

in

2022

to

date.

Drilling

was

primarily

focused

on

stepping

out

laterally

and

vertically

from

the

Blackjack

zone

discovery

hole

(Hole

21)

that

was

announced

last

December

(see

news

release

dated

December

13,

2021).

Mineralization

was

intersected

in

all

drill

holes

with

visible

gold

also

identified

in

the

majority

of

the

drill

holes.

Phase

II

drilling

also

included

the

first

ever

diamond

drill

hole

completed

at

the

Bos

Stock,

a

Tombstone-age

intrusion

related

gold

deposit

target

located

approximately

24

kilometres

southeast

of

the

Blackjack

zone

within

the

376

square

kilometre,

contiguous

RC

Gold

Property

(see

Figure

2).

The

Phase

II

summer

drilling

consisted of 16 diamond drill holes totalling approximately 5,250 m (see Figure 1).

“With

the

addition

of

a

third

drill

this

summer,

Sitka

has

completed

this

portion

of

the

diamond

drilling

program

ahead

of

schedule”,

stated

Cor

Coe,

P.Geo.,

CEO

and

Director

of

Sitka

.

“The

focus

of

this

second

phase

of

drilling

was

to

expand

and

better

understand

the

mineralization

at

the

Blackjack

Zone

while

also

potentially

providing

the

necessary

spatial

density

to

generate

an

initial

resource

estimate.

Drilling

continued

to

encounter

significant

intersections

of

mineralization

at

the

Blackjack

zone

in

numerous

step

out

holes

that

included

several

instances

of

visible

gold

(see

news

release

dated

July

20,

2022

and

this

press

release)

hosted

in

both

intrusive

and

metasedimentary

host

rocks.

Assay

results

from

our

summer

drill

program

are

expected

to

greatly

expand

our

understanding

of

the

controls

of

mineralization

at

the

Blackjack

zone.

Our

systematic

approach

to

exploration

at

RC

Gold

continues

to

deliver

excellent

results

and

we

are

eagerly

awaiting

the

assays

from

this

phase

of

drilling.”

The

Phase

I

winter

drilling

program

successfully

tested

the

potential

for

expanding

the

high

grades

encountered

in

the

2021

Blackjack

Zone

discovery

hole

(Hole

21)

which

intersected

220.1

m

of

1.17

g/t

gold

including

50.5

m

of

2.08

g/t

gold

.

All

four

holes

in

the

Phase

I

winter

drilling

program

encountered

similar

high

grades

(see

Table

1)

to

the

discovery

hole

and

formed

the

basis

for

Sitka

to

design the Phase II summer drill program.

Table 1 -

Previously released Blackjack Zone Drill

Results

Hole ID

Azimuth (

O

)

Dip (

O

)

Length (m)

From (m)

To (m)

Interval (m)

Au (g/t)

Hole 21

320

-45

367.5

6.0

226.1

220.1

1.17

including

120.0

170.5

50.5

2.08

Hole 22

320

-45

364.6

46.0

319.0

273.0

0.52

including

253.0

315.0

62.0

1.21

Hole 23

320

-61.5

285.0

4.2

210.0

205.8

1.01

including

46.0

137.0

91.0

1.61

Hole 24

277

-47

204

4.5

112.0

107.5

1.44

including

16.0

82.0

66.0

2.11

Hole 25

320

-46

389.2

19.0

368

349.0

0.71

including

25.0

246.0

221.0

1.01

The

second

phase

of

drilling

was

designed

to

further

expand

the

Blackjack

Zone

and

provide

Sitka

geologists

with

a

solid

database

of

drilling

data

to

understand

controls

on

mineralization

observed

in

both

intrusive

and

metasedimentary

host

rocks

while

also

potentially

providing

the

necessary

spatial

density

to

generate

an

initial

resource

estimate.

Assay

results

from

Phase

II

drilling

along

with

structural

information

obtained

from

oriented

drilling,

data

from

detailed

core

logging,

reprocessed

Lidar

data

and

interpretation

of

an

airborne

magnetic

geophysical

survey

will

form

the

basis

for

planning of a Phase III drilling program.

Figure 1: Phase II drilling within the Blackjack zone extensional corridor

Samples

from

all

16

holes

of

the

second

phase

of

drilling,

which

began

June

1

st

,

have

been

sent

to

ALS

Global

Laboratories

preparation

facility

in

Whitehorse,

Yukon

(see

Table

2).

The

Company

has

now

completed

a

total

of

approximately

13,000

metres

of

drilling

with

38

holes

positioned

within

the

identified

2

km

extensional

corridor

encompassing

the

Blackjack,

Saddle

and

Eiger

zones

(see

news

release dated May 17, 2022).

Figure 2 - Location of drilling at the Blackjack zone and the Bos Stock intrusion on the RC

Gold

Property

Table 2 - Phase II drill hole location, azimuth, dip (assays pending).

Drillhole ID

Total

Depth (m)

UTM Z8

Easting

UTM Z8

Northing

Elevation

(masl)

Azimuth

(

O

)

Dip (

O

)

DDRCCC-22-026

374

396877

7085305

1495

140

-45

DDRCCC-22-027

209

396594

7085472

1605

320

-55

DDRCCC-22-028

254

396668

7085405

1552

320

-50

DDRCCC-22-029

308

396951

7085357

1544

320

-50

DDRCCC-22-030

398

396822

7085505

1624

320

-50

DDRCCC-22-031

359

396998

7085304

1548

320

-50

DDRCCC-22-032

386

397046

7085397

1591

320

-54

DDRCCC-22-033

344

396763

7085316

1485

320

-50

DDRCCC-22-034

174.15

396972

7085662

1727

322

-55

DDRCCC-22-035

244

397101

7085740

1768

180

-50

DDRCCC-22-036

410

396728

7085517

1618

320

-65

DDRCCC-22-037

305

396597

7085533

1645

125

-50

DDRCCC-22-038

545

396965

7085290

1530

315

-50

DDRCCC-22-039

480

396888

7085453

1583

320

-54

DDRCCC-22-040

209

396763

7085446

1568

320

-55

MQ-22-001

251

415518

7073417

1473

180

-45

The

final

holes

completed

during

the

second

phase

of

drilling

continued

to

intersect

sheeted

quartz

sulphide

veins

and

veinlets

in

megacrystic

granite

and

quartz

feldspar

porphyry

dykes

and

sills

and

in

proximal

intruded

metasedimentary

rocks.

Additional

visible

gold

was

identified

in

all

of

the

final

drill

holes

including

the

deepest

observation

of

visible

gold

at

a

depth

of

417.25m

in

Hole

DDRCCC-22-39.

Figure 3: Visible gold at 417.25 m depth in Drill Hole DDRCCC-22-39

Figure

4:

Drill

core

from

Hole

DDRCC-22-039

showing

location

of

visible

gold

within

quartz

monzonite intrusive.

Figure 5: Visible gold at 113.54m in Hole DDRCC-22-038

Figure

6:

Drill

core

from

Hole

DDRCC-22-038

showing

location

of

visible

gold

within

altered

metasediments.

Figure 7: Visible gold at 58.1 m in Hole DDRCCC-22-40

Figure

8:

Drill

core

from

DDRCCC-22-40

showing

location

of

visible

gold

within

a

fine

grained

feldspar porphyry dyke.