Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SIEN.V ·

Sienna Receives BLM Approval for Drill Permit for up to 5 Initial Locations on the "Elko Lithium Project" in Elko County, Nevada Bordering Surge Battery Metals

Permits & Approvals

Sienna Receives BLM Approval for Drill Permit

for up to 5 Initial Locations on the "Elko

Lithium Project" in Elko County, Nevada

Bordering Surge Battery Metals

Vancouver, British Columbia--(Newsfile Corp. - October 6, 2023) - Sienna Resources Inc. (TSXV: SIE)

(OTC Pink: SNNAF) (FSE: A1XCQ0)

("Sienna" or the "Company") is pleased to announce that it has

received approval from the BLM to drill up to 5 initial locations on its recently acquired "Elko Lithium

Project" in Elko County, Nevada.

This project consists of approximately 1200 contiguous acres directly

bordering Surge Battery Metals' (NILI) "Nevada North Lithium Project" in Elko County, Nevada.

According to the news dated September 12, 2023 from Surge, "The first certified analytical results for

the 2023 summer drilling program at Surge Battery Metals Inc.'s Nevada North lithium project (NNLP)

have returned multiple zones of high values ranging from 1,000 parts per million to 8,070 ppm lithium, the

highest grades for exploration to date on the Nevada North Lithium Project.' Sienna management

cautions that past results or discoveries on properties in proximity to Sienna may not necessarily be

indicative of the presence of mineralization on the company's properties.

Jason Gigliotti, President of Sienna, states, "We are very pleased to have received this permit to drill.

We want to thank the Elko BLM office for their help on this approval to drill on Sienna's initial 5 hole drill

plan. We are excited about this area especially in light of the fantastic lithium results being drilled by our

neighbour, Surge Battery Metals whose shares have risen from a low of $0.065 to a recent high of $1.55

based on their drill results right beside Sienna's property.

This area is shaping up to be one of the most

exciting lithium addresses in North America and we are very pleased to be right in the heart of it.

We

plan to commence drilling as soon as possible.

Not only do we have this new lithium project, but Sienna

is one of the largest landholders in Clayton Valley, Nevada through its other property interests.

Sienna

has more than enough cash on hand for the anticipated current exploration plans and we expect to be

very active on multiple fronts for the remainder of 2023.

Management is extremely optimistic about the

future and looks forward to what will happen with boots on the ground on these projects."

Elko County Map

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/854/183120_96b39ea4340839ff_002full.jpg

Recently, the Bureau of Land Management (BLM) has given Sienna approval for up to 4 additional holes

to be completed on the 100% owned Blue Clay Lithium Project in Clayton Valley, Nevada (See map). On

March 25, 2022, Sienna revealed a new lithium discovery on the Blue Clay Lithium Project. Lithium

values as high as 1230 ppm Li were encountered. The Blue Clay Lithium Project consists of 150

contiguous claims totaling approximately 2,950 acres prospective for lithium right in the heart of the

Clayton Valley in Nevada, which is currently home to the only producing lithium region in North America.

About Sienna Resources Inc.

Sienna has recently acquired the "Elko Lithium Project" in Elko County, Nevada.

This project consists of

approximately 1200 contiguous acres directly bordering Surge Battery Metals' (NILI)

"Nevada North

Lithium Project" in Elko County, Nevada.

Sienna is also one of the larger landholders in Clayton Valley

Nevada. Sienna's Clayton Valley projects include the Blue Clay Lithium Project, the Silver Peak South

Project, and the Clayton Valley Deep Basin Lithium Project. Clayton Valley is home to the only lithium

production in North America, being Albemarle Corp's (NYSE: ALB) Silver Peak deposit.

This project is

also near Tesla Motors Inc.'s Gigafactory in Nevada. On March 18, 2021, Schlumberger New Energy

Venture announced the development of a lithium extraction pilot plant through its new venture, NeoLith

Energy in a strategic partnership with Pure Energy. The deployment of the pilot plant will be in Clayton

Valley, Nevada, USA. The NeoLith Energy sustainable approach uses a differentiated direct lithium

extraction (DLE) process to enable the production of high-purity, battery-grade lithium material while

reducing the production time from over a year to weeks. Results from this pilot plant are expected in

2023 and could have a significant impact on the brine prospects within Clayton Valley Nevada as Sienna

is located in the deepest section of this brine deposit. One other project Sienna has is the 'Marathon

North Platinum-Palladium Property' in Northern Ontario directly bordering Generation Mining Marathon

Deposit.

Qualified Person:

Mr. Frank Bain, PGeo, a qualified person as defined by National Instrument 43-101 has reviewed and

approved the scientific and technical disclosure contained within this news release.

If you would like to be added to Sienna's email list, please email [email protected] for

information or join our twitter account at @SiennaResources.

Contact Information

Tel:

1.604.646.6900

Fax: 1.604.689.1733

www.siennaresources.com

[email protected]

"Jason Gigliotti"

President, Director

Sienna Resources Inc.

Statements in this news release that are not historical facts are forward-looking statements.

Forward-

looking statements are statements that are not historical, and consist primarily of projections -

statements regarding future plans, expectations and developments.

Words such as "expects",

"intends", "plans", "may", "could", "potential", "should", "anticipates", "likely", "believes" and words of

similar import tend to identify forward-looking statements.

Forward-looking statements in this news

release include uncertainty of exploration and development plans regarding the property; commodity

price fluctuations; political or economic instability and regulatory changes; currency fluctuations, the

state of the capital markets; uncertainty in the measurement of mineral reserves and resource

estimates; the Company's ability to attract and retain qualified personnel and management; potential

labour unrest; reclamation and closure requirements for mineral properties and the availability of

capital to fund the Company's projects, as well as other risks and uncertainties identified under the

heading "Risk Factors" in the Company's continuous disclosure documents filed on SEDAR.

You are

cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been

used.

The Company cannot assure you that actual events, performance or results will be consistent

with these forward-looking statements, and management's assumptions may prove to be incorrect.

These forward-looking statements reflect current expectations regarding future events and operating

performance and speak only as of the date hereof and the Company does not assume any obligation

to update forward-looking statements if circumstances or management's beliefs, expectations or

opinions should change other than as required by applicable law. For the reasons set forth above, you

should not place undue reliance on forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

press release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/183120