Drill Results

SONORO GOLD REPORTS HIGHER-GRADE INTERCEPTS AND EXPANDS GOLD

MINERALIZATION AT CERRO CALICHE GOLD PROJECT

VANCOUVER, Canada, May 25, 2022 – Sonoro Gold Corp. (TSXV: SGO | OTCQB: SMOFF | FRA: 23SP)

(“Sonoro” or the “Company”) pleased to report assay results from an additional 10 drill holes completed

at its Cerro Caliche gold project in Sonora, Mexico. Results reflect drilling conducted at El Colorado and

Buena Suerte gold mineralized zones where intercepts include 1.52 meters averaging 9.57 grams of gold

per tonne (“g/t Au”), 28.95 meters averaging 1.021 g/t Au and 10.67 meters averaging 1.183 g/t Au. As

with drilling results announced on May 17, 2022, current intercepts are also situated outside of the pit

shells used to calculate the mineral resource estimate as part of an updated Preliminary Economic

Assessment (“PEA”) announced May 9, 2022, for a proposed heap leach mining operation.

Highlights are as follows:

• SCR-313 intercepted 21.34m averaging 0.557 g/t Au, including 3.04m averaging 1.523 g/t Au

• SCR-314 intercepted 3.05m averaging 1.185 g/t Au, including 1.52m averaging 2.19 g/t Au;

and 7.62m averaging 0.72 g/t Au, including 1.53m averaging 1.635.

• SCR-315 intercepted 10.67m averaging 1.183 g/t Au, including 1.52m averaging 3.27 g/t Au;

and 4.57m averaging 1.087 g/t Au, including 1.53m averaging 2.28 g/t Au.

• SCR-318 intercepted 1.52m averaging 9.57 g/t Au and 28.95m averaging 1.021 g/t Au;

including 1.53m averaging 2.07 g/t Au, including 3.05m averaging 2.706 g/t Au

The map below illustrates the location of the drill holes.

Figure 1: New Drill Holes at El Colorado and Buena Suerte

Results from seven additional drill holes completed at the Abejas gold mineralized zone are still pending

and will be announced next month, concluding the Phase IV drilling program at Cerro Caliche. Geological

data from this latest drilling campaign will be included in a further updated resource estimate scheduled

to be announced in the summer of 2022. The updated technical report will also assess the potential

economic impact of the new drilling data on the proposed heap leach mining operation.

Mel Herdrick, Sonoro's Vice President of Exploration, noted that “I continue to be encouraged by the

results of the Phase IV drilling campaign which has returned multiple higher-grade intercepts and

demonstrated resource growth potential near surface and at depth. These latest assay intercepts also

indicate continued expansion of El Colorado and Buena Suerte mineralized gold zones outside of the pit

shells used to calculate the resource estimate for the initial PEA. The potential expansion will be confirmed

in an updated resource estimate expected to be completed over the next few months.”

Kenneth MacLeod, Sonoro’s President and CEO stated, “With the updated mineral resource estimation

potentially demonstrating an increase in multiple gold mineralized zones at Cerro Caliche, we are now

reviewing the additional work involved to incorporate the new data into an updated technical report on

the proposed mining operation. This has been a successful drilling campaign and I look forward to sharing

the final drilling results with our shareholders.”

John Darch, Sonoro’s Chairman, added, “I am very pleased with the latest results as they indicate a

potential increase in both the size and grade of the of the project’s oxide gold mineralization. As announced

when drilling resumed in November 2021, the objective of this drilling program was to expand the resource

and potentially improve the economics and mine life of the proposed heap leach operation. We are

becoming more optimistic that we may meet this objective.”

El Colorado Gold Mineralized Zone

Five drill holes were completed at El Colorado extending mineralization approximately 30-meters along

the northwestern side of the estimated resource pit shell. Shallow gold mineralization was cut in all five

drill holes with drill holes SCR-313, SCR-314 and SCR-315 returning multiple higher-grade intercepts.

Drill hole SCR-315 tested for a possible extension of the mineralization contained within the northernmost

extent of the pit shell and beginning at 7.62 meters, it intercepted 10.67 meters averaging 1.183 g/t Au,

including 1.52 meters averaging 3.27 g/t Au and 4.57 meters averaging 1.087 g/t Au, including 1.53 meters

averaging 2.28 g/t Au.

Approximately 50 meters northwest of the previously reported drill hole SCR-307, which intercepted 9.14

meters of 9.577 g/t Au, drill hole SCR-313 tested the outside perimeter of the pit shell, intercepting 21.34

meters of 0.557 g/t Au, including 3.04 meters of 1.523 g/t Au.

Figure 2: Drill Holes at El Colorado and Buena Suerte

Buena Suerte Vein System

Located approximately 300 meters east of El Colorado, five drill holes extended the Buena Suerte vein

system to the southwest with drill holes SCR-318, SCR-319 and SCR-320 located immediately outside the

resource pit shell boundary.

Drill hole SCR-318 cut strong gold mineralization intercepting 1.52 meters averaging 9.57 g/t Au and 28.95

meters averaging 1.021 g/t Au, including 1.53 meters averaging 2.07 g/t Au, as well as 3.05 meters

averaging 2.706 g/t Au. Drill hole SCR-320 intercepted 4.57 meters averaging 0.851 g/t Au, including 1.53

meters averaging 2.11 g/t Au.

Drill holes SCR-316 and SCR-317 are located further south with assay results of only short uneconomic

intervals, possibly due to an unmapped fault having shifted vein extensions to other positions.

The following table provides the assay results for the complete list of reported drill holes:

Cerro Caliche Project, Holes Composites with Cut-off 0.15 g/t Au

Hole Target

From To Interval Au Ag AuEq

meters g/t g/t g/t

SCR-311 El Colorado 19.81 22.86 3.05 0.423 2.70 0.435

and 35.05 39.62 4.57 0.626 1.00 0.630

Cerro Caliche Project, Holes Composites with Cut-off 0.15 g/t Au

Hole Target

From To Interval Au Ag AuEq

meters g/t g/t g/t

SCR-312 El Colorado 10.67 16.76 6.09 0.209 3.20 0.224

SCR-313 El Colorado

30.48 51.82 21.34 0.557 6.10 0.585

including 36.58 39.62 3.04 1.523 15.60 1.594

and 85.34 96.01 10.67 0.257 1.60 0.265

SCR-314 El Colorado

3.05 6.10 3.05 1.185 1.80 1.193

including 3.05 4.57 1.52 2.190 2.70 2.202

and 68.58 70.10 1.52 1.075 5.70 1.101

and 79.25 86.87 7.62 0.720 2.60 0.732

including 80.77 82.30 1.53 1.635 1.70 1.643

SCR-315 El Colorado

7.62 18.29 10.67 1.183 2.50 1.241

including 15.24 16.76 1.52 3.270 33.90 3.426

and 28.96 33.53 4.57 1.087 2.10 1.097

including 32.00 33.52 1.53 2.280 4.70 2.302

and 48.77 53.34 4.57 0.503 0.70 0.506

and 88.39 91.44 3.05 0.230 0.50 0.232

and 97.54 128.02 30.48 0.437 1.50 0.444

including 108.20 111.25 3.05 1.138 1.90 1.146

including 121.92 123.44 1.52 1.080 2.80 1.093

SCR-316 San Quintin 9.14 13.72 4.58 0.262 0.30 0.264

and 25.91 28.96 3.05 0.256 0.90 0.260

SCR-317 Buena Suerte 53.34 56.39 3.05 0.296 1.90 0.304

SCR-318 Buena Suerte

15.24 18.29 3.05 0.934 5.30 0.958

including 15.24 16.76 1.52 1.445 8.40 1.484

and 30.48 32.00 1.52 9.570 1.20 9.576

and 51.82 80.77 28.95 1.021 1.20 1.027

including 62.48 64.01 1.53 2.070 2.20 2.080

including 70.10 73.15 3.05 2.706 2.40 2.717

SCR-319 Buena Suerte 16.76 35.05 18.29 0.333 7.50 0.367

SCR-320 Buena Suerte

13.72 21.34 7.62 0.339 5.60 0.365

and 33.53 38.10 4.57 0.851 4.80 0.873

including 35.05 36.58 1.53 2.110 8.00 2.147

and 50.29 54.86 4.57 0.240 1.70 0.248

and 57.91 60.96 3.05 0.181 0.20 0.182

Drill collar locations, azimuths and dips for the drill holes included are provided in the table below

Drill Collar Locations (NAD 1927 UTM Zone 12N)

Drill Hole Zone Easting Northing Elevation Depth (m) Dip Azimuth

SCR-311 El Colorado 536,130 3,364,461 1,260 112.78 -66 192

SCR-312 El Colorado 536,088 3,364,474 1,273 82.30 -45 270

SCR-313 El Colorado 536,102 3,364,587 1,322 100.58 -45 235

SCR-314 El Colorado 536,140 3,364,621 1,327 121.92 -45 230

SCR-315 El Colorado 536,165 3,364,651 1,321 131.06 -45 217

SCR-316 San Quintín 536,625 3,364,517 1,286 100.58 -45 275

Drill Collar Locations (NAD 1927 UTM Zone 12N)

Drill Hole Zone Easting Northing Elevation Depth (m) Dip Azimuth

SCR-317 Buena Suerte 536,632 3,364,579 1,241 100.58 -45 270

SCR-318 Buena Suerte 536,579 3,364,703 1,280 83.82 -45 235

SCR-319 Buena Suerte 536,538 3,364,701 1,286 82.30 -45 235

SCR-320 Buena Suerte 536,495 3,364,817 1,359 121.92 -45 235

Quality Assurance/Quality Control ( “QA/QC”) Measures and Analytical Procedures

Drill samples are collected with an airstream cyclone and passed into a splitter that divides each sample

into quarters. The quartered samples are then bagged and sealed with identification. The sample group

has blanks, standards and duplicates inserted into the sample stream.

ALS-Chemex collects the samples and transports them directly to the preparation laboratory in

Hermosillo, Sonora. At the laboratory, part of each sample is reduced through crushing, splitting and

pulverization from which 200 grams is sent to the ALS-Chemex assay laboratory in Vancouver. Thirty

grams undergoes fire assay for gold with the resulting concentrated button of material produced is

dissolved in acids and the gold is determined by atomic absorption. Another quantity of the sample is

dissolved in four acids for an ICP multi-element analysis.

No QA/QC issues were noted with the results received from the laboratory.

Geologic Description

Cerro Caliche is located 45 kilometers east southeast of Magdalena de Kino in the Cucurpe-Sonora Mega-

district of Sonora, Mexico. Multiple historic underground mines were developed in the concession

including Cabeza Blanca, Los Cuervos, Japoneses, Las Abejas, Boluditos, El Colorado, Veta de Oro and

Espanola. Mineralization types of the Cucurpe-Sonora Mega-district include variants of epithermal low

sulfidation veins and related mineralized dikes and associated volcanic domes. Local altered and

mineralized felsic dikes cut the mineralized meta-sedimentary rock units and may be associated with

mineralization both in the dikes and meta-sedimentary rocks.

Qualified P erson Statement

Stephen Kenwood, P.Geo., a Director of Sonoro, is a Qualified Person within the context of National

Instrument 43-101 (NI 43-101) and has read and approved this news release. Readers are cautioned that

the presence of mineralization in historic mines adjacent to, or on, Cerro Caliche is not necessarily

indicative of economic gold mineralization residing in the concessions held by the Company.

About Sonoro Gold Corp.

Sonoro Gold Corp. is a publicly listed exploration and development company with two exploration-stage

precious metal properties in Sonora State, Mexico. The Company has highly experienced operational and

management teams with proven track records for the discovery and development of natural resource

deposits.

On behalf of the Board of Sonoro Gold Corp.

Per: “Kenneth MacLeod”

Kenneth MacLeod

President & CEO

For further information, please contact:

Sonoro Gold Corp. - Tel: (604) 632-1764

Email: [email protected]

This press release may contain "forward-looking information" as defined in applicable Canadian securities legislation.

All statements other than statements of historical fact, included in this release, including, without limitation,

statements regarding the Cerro Caliche project, and future plans and objectives of the Company, constitute forward

looking information that involve various risks and uncertainties. Although the Company believes that such statements

are reasonable based on current circumstances, it can give no assurance that such expectations will prove to be

correct. Forward-looking statements are statements that are not historical facts; they are generally, but not always,

identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "aims",

"potential", "goal", "objective", "prospective" and similar expressions, or that events or conditions "will", "would",

"may", "can”, "could" or "should" occur, or are those statements, which, by their nature, refer to future events. The

Company cautions that forward-looking statements are based on the beliefs, estimates and opinions of the

Company's management on the date the statements are made and they involve a number of risks and uncertainties,

including the possibility of unfavorable exploration and test results, the lack of sufficient future financing to carry out

exploration and development plans and unanticipated changes in the legal, regulatory and permitting requirements

for the Company’s exploration programs. There can be no assurance that such statements will prove to be accurate,

as actual results and future events could differ materially from those anticipated in such statements. Accordingly,

readers should not place u ndue reliance on forward-looking statements. The Company disclaims any intention or

obligation to update or revise any forward-looking statements, whether as a result of new information, future events

or otherwise, except as required by law or the policies of the TSX Venture Exchange. R eaders are encouraged to

review the Company’s complete public disclosure record on SEDAR at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.