Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SGO.V ·

Sonoro GOLD Reports High Grade Intercepts at Cerro Caliche Including 10.67 Meters of 9.02 Grams of GOLD PER Tonne

Drill Results

SONORO GOLD REPORTS HIGH GRADE INTERCEPTS AT CERRO CALICHE

INCLUDING 10.67 METERS OF 9.02 GRAMS OF GOLD PER TONNE

VANCOUVER, Canada, April 21, 2022 – Sonoro Gold Corp. (TSXV: SGO | OTCQB: SMOFF | FRA: 23SP)

( “Sonoro” or the “Company”) is pleased to report assay results from an additional 15 drill holes completed

as part of a drilling campaign currently underway at its Cerro Caliche gold project in Sonora, Mexico. As

previously announced, the objective of the program is to increase the estimated size and grade of the

project’s oxide gold mineralization as well as to potentially extend the estimated life of the proposed heap

leach mining operation as outlined in the Preliminary Economic Assessment (PEA) filed in October 2021.

These latest results include drilling conducted at El Colorado and Guadalupe gold mineralized zones in the

southwest of the concession’s mineralized zones where multiple high-grade gold intercepts were

previously reported within larger intervals of higher-grade gold mineralization, as well as at El Bellotoso

gold mineralized zone in the northeast region.

Highlights are as follows:

• SCR-289 intercepted 7.62m averaging 0.562 g/t Au; including 1.52m averaging 1.385 g/t Au

• SCR-292 intercepted 3.04m averaging 1.765 g/t Au; including 1.52m averaging 3.370 g/t Au

• SCR-293 intercepted 12.19m averaging 0.874 g/t Au; including 1.52m averaging 3.62 g/t Au;

and 6.10m averaging 0.922 g/t Au; including 1.53m averaging 2.22 g/t Au;

and 7.62m averaging 2.262 g/t Au; including 1.53m averaging 10.25 g/t Au

• SCR-295 intercepted 1.52m averaging 1.455 g/t Au; and 1.53m averaging 6.00 g/t Au

• SCR-296 intercepted 7.62m averaging 0.673 g/t Au; including 1.53m averaging 1.835 g/t Au;

and 6.10m averaging 0.422 g/t Au; including 1.52m averaging 1.00 g/t Au

• SCR-298 intercepted 3.05m averaging 0.884 g/t Au; including 1.53m averaging 1.455 g/t Au

• SCR-299 intercepted 10.67m averaging 9.018 g/t Au; including 6.10m averaging 15.558 g/t Au

• SCR-301 intercepted 10.67m averaging 0.497 g/t Au; including 1.52m averaging 1.795 g/t Au

Mel Herdrick, Sonoro’s VP Exploration noted, “With the discovery of multiple prospective high-grade ore-

shoots identified by drilling at El Colorado, we are developing an understanding of the permissible extent

and trend of these potential ore-shoots that may have up to seven additional repetitions in the footwall of

the Guadalupe vein zone extending up to 700 meters to the northwest of El Colorado. These high-grade

ore-shoots may add significantly to the existing resource. The process of defining these zones also allows

us to refine our understanding of the structural geology and, consequently, identify additional areas for

possible material resource expansion and a recalculation of the existing resource.”

Kenneth MacLeod, Sonoro’s CEO and President commented, “We continue to be very pleased with the

results from our Phase IV drilling program which is expected to be completed by early May with the

remaining results expected at the end of May. While we move forward with the development of the

proposed mining operations, we will now begin assessing the potential economic impact of the new

geological data on the project.”

John Darch, Sonoro's Chairman commented, "We are very encouraged with the latest drilling results. The

extension of several gold mineralized zones as well as the multiple deeper higher-grade intercepts suggests

the drilling program may meet its objective of increasing the size and grade of the resource and therefore

potentially extend the life of our proposed mining operation as well as improve the overall economics of

the project. This is a very exciting time for Sonoro and its shareholders.”

The map below illustrates the location of the drill holes.

Figure 1: New Drill Holes

El Colorado Zone

On March 1, 2022, the Company announced that drill hole SCR-286 had intercepted high-grade gold

mineralization at the deepest level of El Colorado’s epithermal system drilled to date. Eight drill holes

were recently completed at El Colorado to expand mineralization near this intercept, including drill hole

SCR-289 which intercepted 7.62 meters averaging 0.562 g/t Au, including 1.52 meters averaging 1.385 g/t

Au. Drill hole SCR-290 was drilled at a 60-degree inclination following strike and is located below SCR-286

where it intercepted 3.05 meters averaging 0.378 g/t Au. In close proximity, SCR-292 intercepted 3.04

meters averaging 1.765 g/t Au, including 1.52 meters averaging 3.370 g/t Au.

Vertical drill hole SCR-298 intercepted 3.05 meters averaging 0.884 g/t Au, including 1.53 meters

averaging 1.455 g/t Au and drill hole SCR-299 intercepted 4.58 meters averaging 0.497 g/t Au and 10.67

meters averaging 9.01 g/t Au, including 6.10 meters averaging 15.558 g/t Au located at depth of 64.01

meters and approximately 50 meters northwest of SCR-286.

Vertical drill hole SCR-300 intercepted 3.04 meters averaging 0.407 g/t Au, near the projected intercept

area where gold is anomalous with high values of lead and zinc. A lost interval at 117 meters showed high

manganese oxide content with no sample and high-water flow suggesting a post mineral fault which may

displace the mineralization.

Two drill holes were also completed outside of the resource pit shell used to calculate the zone’s gold

resource in the updated Mineral Resource Estimate. Drill hole SCR-291 is approximately 100 meters

southeast of the proposed pit shell where it intercepted 3.05 meters averaging 0.530 g/t Au, including

1.53 meters averaging 1.670 g/t Au. Drill hole SCR-293 is approximately 30 meters east of the pit shell

where it intercepted 12.19 meters from surface averaging 0.874 g/t Au, including 1.52 meters averaging

3.62 g/t Au. At a depth of 184.4 meters, the same drill hole intercepted 7.62 meters averaging 2.262 g/t

Au, including 1.53 meters averaging 10.25 g/t Au.

Figure 2: Interpretive Cross Section at El Colorado

Guadalupe Zone

At the Guadalupe zone, four drill holes were collared on the western side of the proposed resource pit

cone for calculating the zone’s gold resource as outlined in the updated Mineral Resource Estimate. Drill

hole SCR-294 intercepted 3.05 meters averaging 0.525 g/t Au at a depth of 121.92 meters and drill hole

SCR-295 intercepted 1.52 meters averaging 1.455 g/t Au at a depth of 112.78 meters and intercepted

another 1.53 meters averaging 6.00 g/t Au at a depth of 164.59 meters.

Intervals in drill holes SCR-296 and SCR-297 show extensions of the gold mineralization along the

southeastern trend and drill hole SCR-294 contained short intervals representing stockwork type

mineralization but the average grades reported are below the PEA resource cutoff for inclusion.

El Bellotoso Zone

In the northeast region of the property, drilling at El Bellotoso intercepted gold mineralization, extending

the zone 200 meters along strike. Four drill holes were completed with drill hole SCR-301 returning the

best results. SCR-301 was collared at the southeastern side of the proposed El Rincón pit cone and

intercepted 10.67 meters averaging 0.497 g/t Au from near surface, including 1.52 meters averaging 1.795

g/t Au.

The following table provides the assay results for the complete list of reported drill holes:

Cerro Caliche Project, Holes Composites with Cut-off 0.15 g/t Au

Hole Target

From To Interval Au Ag AuEq

Meters g/t g/t g/t

SCR-289 El Colorado 3.05 10.67 7.62 0.562 0.80 0.566

including 7.62 9.14 1.52 1.385 0.80 1.389

SCR-290 El Colorado 79.25 82.30 3.05 0.378 1.40 0.385

SCR-291 El Colorado 27.43 30.48 3.05 0.530 0.70 0.533

and 42.67 44.20 1.53 1.670 11.40 1.722

SCR-292 El Colorado 36.58 39.62 3.04 1.765 1.40 1.771

including 38.10 39.62 1.52 3.370 1.40 3.376

SCR-293 El Colorado

0.00 12.19 12.19 0.874 2.00 0.883

including 10.67 12.19 1.52 3.620 2.20 3.630

and 65.53 67.06 1.53 1.845 0.80 1.849

and 134.11 140.21 6.10 0.922 1.50 0.929

including 134.11 135.64 1.53 2.220 1.60 2.227

and 184.40 192.02 7.62 2.262 3.70 2.279

including 187.45 188.98 1.53 10.250 14.10 10.315

SCR-294 Guadalupe 89.92 96.01 6.09 0.336 6.30 0.365

and 121.92 124.97 3.05 0.525 0.30 0.526

SCR-295 Guadalupe

1.52 15.24 13.72 0.380 1.10 0.385

and 102.11 114.30 12.19 0.380 3.00 0.394

including 112.78 114.30 1.52 1.455 1.50 1.462

and 164.59 166.12 1.53 6.000 2.60 6.012

SCR-296 Guadalupe

0.00 7.62 7.62 0.673 2.90 0.686

including 4.57 6.10 1.53 1.835 6.20 1.863

and 19.81 25.91 6.10 0.422 0.60 0.425

including 21.34 22.86 1.52 1.000 0.70 1.003

and 32.00 36.58 4.58 0.309 1.40 0.316

and 92.96 100.58 7.62 0.276 2.00 0.285

SCR-297 Guadalupe 0.00 4.57 4.57 0.424 3.20 0.439

and 79.25 83.82 4.57 0.166 1.40 0.172

SCR-298 El Colorado

12.19 18.29 6.10 0.462 2.20 0.472

and 24.38 27.43 3.05 0.884 2.70 0.896

including 24.38 25.91 1.53 1.455 4.70 1.477

and 56.39 59.44 3.05 0.226 0.70 0.230

Cerro Caliche Project, Holes Composites with Cut-off 0.15 g/t Au

Hole Target

From To Interval Au Ag AuEq

Meters g/t g/t g/t

SCR-299 El Colorado

9.14 13.72 4.58 0.497 0.50 0.499

and 57.91 68.58 10.67 9.018 5.20 9.042

including 57.91 64.01 6.10 15.558 8.70 15.598

SCR-300 El Colorado 13.72 16.76 3.04 0.407 2.70 0.419

and 19.81 22.86 3.05 0.229 0.30 0.231

SCR-301 El Bellotoso

10.67 21.34 10.67 0.497 0.80 0.501

including 10.67 12.19 1.52 1.795 1.00 1.800

and 24.38 28.96 4.58 0.170 1.60 0.178

and 35.05 53.34 18.29 0.199 0.50 0.201

and 71.63 74.68 3.05 0.175 1.70 0.183

and 79.25 85.34 6.09 0.409 2.40 0.420

and 106.68 111.25 4.57 0.401 0.30 0.402

SCR-302 El Bellotoso 16.76 22.86 6.10 0.259 14.00 0.323

and 39.62 54.86 15.24 0.361 16.00 0.434

SCR-303 El Bellotoso 25.91 32.00 6.09 0.241 7.90 0.278

Drill collar locations, azimuths and dips for the drill holes included are provided in the table below.

Drill Collar Locations (NAD 1927 UTM Zone 12N)

Drill Hole Zone Easting Northing Elevation Depth (m) Dip Azimuth

SCR-289 El Colorado 536,228 3,364,440 1,196 121.92 -60 219

SCR-290 El Colorado 536,273 3,364,478 1,194 134.11 -60 222

SCR-291 El Colorado 536,281 3,364,436 1,189 121.92 -80 228

SCR-292 El Colorado 536,257 3,364,419 1,179 112.78 -70 228

SCR-293 El Colorado 536,224 3,364,596 1,263 234.7 -48 195

SCR-294 Guadalupe 535,998 3,365,088 1,415 172.21 -45 260

SCR-295 Guadalupe 536,044 3,365,047 1,384 173.74 -45 260

SCR-296 Guadalupe 536,059 3,364,994 1,361 152.4 -45 260

SCR-297 Guadalupe 536,049 3,364,936 1,345 140.21 -45 260

SCR-298 El Colorado 536,202 3,364,428 1,216 128.02 -90 0

SCR-299 El Colorado 536,229 3,364,440 1,195 106.68 -90 0

SCR-300 El Colorado 536,224 3,364,406 1,193 134.11 -90 0

SCR-301 El Bellotoso 536,406 3,366,439 1,411 121.92 -55 45

SCR-302 El Bellotoso 536,508 3,366,388 1,402 91.44 -55 45

SCR-303 El Bellotoso 536,601 3,366,325 1,378 73.15 -45 55

Quality Assurance/Quality Control (“QA/QC”) Measures and Analytical Procedures

Drill samples are collected with an airstream cyclone and passed into a splitter that divides each sample

into quarters. The quartered samples are then bagged and sealed with identification. The sample group

has blanks, standards and duplicates inserted into the sample stream.

ALS-Chemex collects the samples and transports them directly to the preparation laboratory in

Hermosillo, Sonora. At the laboratory, part of each sample is reduced through crushing, splitting and

pulverization from which 200 grams is sent to the ALS-Chemex assay laboratory in Vancouver. Thirty

grams undergoes fire assay for gold with the resulting concentrated button of material produced is

dissolved in acids and the gold is determined by atomic absorption. Another quantity of the sample is

dissolved in four acids for an ICP multi-element analysis.

No QA/QC issues were noted with the results received from the laboratory.

Geologic Description

Cerro Caliche is located 45 kilometers east southeast of Magdalena de Kino in the Cucurpe-Sonora Mega-

district of Sonora, Mexico. Multiple historic underground mines were developed in the concession

including Cabeza Blanca, Los Cuervos, Japoneses, Las Abejas, Boluditos, El Colorado, Veta de Oro and

Espanola. Mineralization types of the Cucurpe-Sonora Mega-district include variants of epithermal low

sulfidation veins and related mineralized dikes and associated volcanic domes. Local altered and

mineralized felsic dikes cut the mineralized meta-sedimentary rock units and may be associated with

mineralization both in the dikes and meta-sedimentary rocks.

Qualified Person Statement

Stephen Kenwood, P.Geo., a Director of Sonoro, is a Qualified Person within the context of National

Instrument 43-101 (NI 43-101) and has read and approved this news release. Readers are cautioned that

the presence of mineralization on historic mines adjacent to or on Cerro Caliche is not necessarily

indicative of economic gold mineralization in the concessions held by the Company.

About Sonoro Gold Corp.

Sonoro Gold Corp. is a publicly listed exploration and development company with a portfolio of

exploration-stage precious metal properties in Sonora State, Mexico. The Company has highly

experienced operational and management teams with proven track records for the discovery and

development of natural resource deposits.

On behalf of the Board of Sonoro Gold Corp.

Per: “Kenneth MacLeod”

Kenneth MacLeod

President & CEO

For further information, please contact:

Sonoro Gold Corp. - Tel: (604) 632-1764

Email: [email protected]

This press release may contain "forward-looking information" as defined in applicable Canadian securities legislation.

All statements other than statements of historical fact, included in this release, including, without limitation,

statements regarding the Cerro Caliche project, and future plans and objectives of the Company, constitute forward

looking information that involve various risks and uncertainties. Although the Company believes that such statements

are reasonable based on current circumstances, it can give no assurance that such expectations will prove to be

correct. Forward-looking statements are statements that are not historical facts; they are generally, but not always,

identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "aims",

"potential", "goal", "objective", "prospective" and similar expressions, or that events or conditions "will", "would",

"may", "can”, "could" or "should" occur, or are those statements, which, by their nature, refer to future events. The

Company cautions that forward-looking statements are based on the beliefs, estimates and opinions of the

Company's management on the date the statements are made and they involve a number of risks and uncertainties,

including the possibility of unfavorable exploration and test results, the lack of sufficient future financing to carry out

exploration and development plans and unanticipated changes in the legal, regulatory and permitting requirements

for the Company’s exploration programs. There can be no assurance that such statements will prove to be accurate,

as actual results and future events could differ materially from those anticipated in such statements. Accordingly,

readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or

obligation to update or revise any forward-looking statements, whether as a result of new information, future events

or otherwise, except as required by law or the policies of the TSX Venture Exchange. Readers are encouraged to

review the Company’s complete public disclosure record on SEDAR at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.