Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SGO.V ·

Sonoro GOLD Announces 10,000-METER Drilling Program at Cerro Caliche

Exploration Programs

SONORO GOLD ANNOUNCES 10,000-METER DRILLING PROGRAM AT CERRO CALICHE

VANCOUVER, Canada, October 25, 2021 – Sonoro Gold Corp. (TSXV: SGO | OTCQB: SMOFF | FRA: 23SP)

(“Sonoro” or the “Company”) is pleased to announce the intention to resume drilling at the Company’s

Cerro Caliche gold project in Sonora State, Mexico. The 10,000-meter reverse circulation drilling campaign

will proceed alongside the proposed development of a heap leach mining operation (HLMO) with a

projected capacity of up to 15,000 tonnes per day.

The six-month drilling program will focus on expanding the project’s oxide gold mineralization included in

the updated Resource Estimate announced September 15, 2021, as well as potential higher-grade targets

recently identified by a surface sampling program announced on August 30, 2021, and July 20, 2021.

The map below shows the proposed drill holes for the upcoming program:

The reader is cautioned that drill locations may change as drilling and sampling results may impact drilling

sequence, location and priority.

The Company plans 705 meters of infill and expansion drilling at El Colorado (A) where previous drilling

by the Company returned higher-grade results including drill-hole SCR-044 which intercepted 12.19

meters averaging 11.2 grams of gold per tonne (“g/t Au”) including 6.1 meters averaging 21.58 g/t Au. A

further 1,230 meters of drilling is planned along the El Colorado/La Ventana Corridor (B) where assay

results from surface sampling announced on July 20, 2021, confirmed linear structural corridors of

anomalous gold, silver, and base metal mineralization with a 600-meter extension to the southeast from

El Colorado to La Ventana. Additional sampling results announced on August 30, 2021, identified three

oxide gold mineralized “windows” within the El Colorado/La Ventana Corridor with assay results from 39

samples averaging 0.63 g/t Au and results from 51 samples averaging 0.76 g/t Au. Another seven samples

returned grades between 4.4 g/t Au and 9.9 g/t Au.

To the east of El Colorado at the Buena Suerte mineralized zone, the Company plans 1,215 meters of infill

and extension drilling at the north and south ends of Buena Suerte (C). An additional 1,800-meters of

drilling is targeted along the Buena Suerte/San Quintín Corridor (D) to the south of Buena Suerte. Surface

sampling confirmed a 750-meter southern extension of the Buena Suerte/San Quintin Corridor where two

windows of oxide gold mineralization were identified also suggesting the potential for higher-grade and

near surface mineralization. Previously announced assay results from 61 samples averaged 0.65 g/t Au

and another 11 samples returned grades between 2.5 and 14.5 g/t Au.

Another 1,110-meters of expansion drilling is planned at El Rincón (E) to connect with the northwest

extension of the Veta de Oro gold mineralized zone located over 500 meters to the southeast along the

same structure. An additional 1,290-meters of drilling is planned at Cuervos (F), located at the

southernmost extension of the Japoneses mineralized zones to expand the Cuervos zone toward the

northwest and to the south and southwest. Drilling is planned to extend the Cabeza Blanca (G) vein zone

to the north as well as at the Abejas/Chinos Altos Corridor (H) where the Company plans to investigate

the horse tailed bifurcation of the Abejas (I) vein zone with four vein splays to the southwest into Chinos

Altos where reported drill hole SCR-069 intercepted 7.632 meters averaging 0.947 g/t Au.

Drilling will also focus on extending mineralization at two zones excluded from the updated resource

estimate due to lack of required drilling density. The first is the Guadalupe zone (J), located parallel to the

west side of Cabeza Blanca where reported results included drill hole SCR-030 which intercepted 22.86

metres averaging 0.725 g/t Au and drill hole SCR-061 which intercepted 15.2 meters averaging 0.599 g/t

Au. The Company plans 300 meters of infill drilling to investigate the potential for the Guadalupe zone to

coalesce with the Cabeza Blanca open pit.

The second excluded zone is La Española (K), located in the southeast region of the concession. Reported

results from La Española included drill hole SCR-068 which intercepted 9.14 m of 1.25 g/t Au and surface

sampling which identified the area as being within the recently defined La Magdalena/La Española

Corridor. The Company plans to drill approximately 1,800 meters at La Española and another 190-meters

at La Magdalena (L).

Mel Herdrick, Sonoro’s VP of Exploration noted, “We will initiate this program armed with important new

data that will allow us to potentially add to our resource and target areas where sampling indicates the

potential for higher-grade mineralization. Previous drilling intercepted gold mineralization in most holes,

demonstrating a very good success rate, which I expect will continue based on the sampling and drill

results.”

Sonoro’s President and CEO, Kenneth MacLeod, commented, “This program has been under development

since we paused drilling in May 2021. It is strategically designed to expand the project’s mineralized zones

and target potentially higher-grade, near surface mineralization. We maintain our strategy to expedite

the commencement of operations to generate cashflow that will contribute to further drilling to increase

the project’s potential.”

Sonoro’s Chairman, John Darch, added, “The drilling campaign will focus on potentially increasing the

size and grade of the gold resource while we continue with the proposed development of the

HLMO. Confirmation of extensive, higher-grade mineralization could potentially improve the overall

economics of the project.”

The table below includes the number of high priority drill holes and meters allocated to each zone, with

the targeted 10,000 meters to be selected from the list. The locations, sequencing and configuration of

the holes may be modified as assay resul ts are received. Drill hole lengths are designed for an average

length of 100 - 110 meters within a range of 70 to 140 meters per hole.

Mineralized Zones Map Holes Meters

El Colorado Zone A 9 705

El Colorado/La Ventana Corridor B 13 1,230

Buena Suerte Zone C 12 1,215

Buena Suerte/San Quintín Corridor D 23 1,800

El Rincón Zone E 14 1,110

Cuervos Zone F 13 1,290

Cabeza Blanca Zone G 5 390

Abejas/Chinos Altos Corridor H 16 1,490

Abejas Zone I 8 590

Guadalupe Zone J 3 300

La Española Zone K 13 1,030

La Magdalena Zone L 3 190

Total 132 11,340

Geologic Description

Cerro Caliche is located 45 kilometers east southeast of Magdalena de Kino in the Cucurpe-Sonora Mega-

district of Sonora, Mexico. Multiple historic small underground gambusino gold mines were developed in

the concession including Cabeza Blanca, Los Cuervos, Japoneses, Las Abejas, Boluditos, El Colorado, Veta

de Oro and Espanola. Mineralization types of the Cucurpe-Sonora Mega-district include variants of

epithermal low sulfidation veins and related mineralized dikes and associated volcanic domes. Local

altered and mineralized felsic dikes cut the mineralized meta-sedimentary rock units and may be

associated with mineralization both in the dikes and meta-sedimentary rocks.

Qualified Person Statement

Stephen Kenwood, P.Geo., a Director of Sonoro, is a Qualified Person within the context of National

Instrument 43-101 (NI 43-101) and has read and approved this news release. Readers are cautioned that

the presence of mineralization on historic mines adjacent to or on Cerro Caliche is not necessarily

indicative of economic gold mineralization in the concessions held by the Company.

About Sonoro Gold Corp.

Sonoro Gold Corp. is a publicly listed exploration and development company holding the near

development stage Cerro Caliche project and the exploration stage San Marcial properties in Sonora State,

Mexico. The Company has highly experienced operational and management teams with proven track

records for the discovery and development of natural resource deposits.

On behalf of the Board of Sonoro Gold Corp.

Per: “Kenneth MacLeod”

Kenneth MacLeod

President & CEO

For further information, please contact:

Sonoro Gold Corp. - Tel: (604) 632-1764

Email: [email protected]

Forward-Looking Statement Cautions:

This press release may contain "forward-looking information" as defined in applicable Canadian securities

legislation. All statements other than statements of historical fact, included in this release, including,

without limitation, statements regarding the Cerro Caliche project, and future plans and objectives of the

Company, constitute forward looking information that involve various risks and uncertainties. Although

the Company believes that such statements are reasonable based on current circumstances, it can give no

assurance that such expectations will prove to be correct. Forward-looking statements are statements that

are not historical facts; they are generally, but not always, identified by the words "expects", "plans",

"anticipates", "believes", "intends", "estimates", "projects", "aims", "potential", "goal", "objective",

"prospective" and similar expressions, or that events or conditions "will", "would", "may", "can”, "could"

or "should" occur, or are those statements, which, by their nature, refer to future events. The Company

cautions that forward-looking statements are based on the beliefs, estimates and opinions of the

Company's management on the date the statements are made and they involve a number of risks and

uncertainties, including the possibility of unfavorable exploration and test results, the lack of sufficient

future financing to carry out exploration and development plans and unanticipated changes in the legal,

regulatory and permitting requirements for the Company’s exploration programs. There can be no

assurance that such statements will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, readers should not place undue

reliance on forward-looking statements. The Company disclaims any intention or obligation to update or

revise any forward-looking statements, whether as a result of new information, future events or otherwise,

except as required by law or the policies of the TSX Venture Exchange. Readers are encouraged to review

the Company’s complete public disclosure record on SEDAR at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this

release.