Sigma Lithium to Release First Quarter 2024 Results
| 1
SIGMA LITHIUM TO RELEASE FIRST QUARTER 2024 RESULTS
MAY 16, 2024, BEFORE MARKET OPEN
São Paulo, Brazil – (May 15, 2024) – Sigma Lithium Corporation (“Sigma Lithium” or the “Company”) (NASDAQ:
SGML, BVMF: S2GM34, TSXV: SGML) , a leading global lithium producer dedicated to powering the next
generation of electric vehicles with carbon neutral, socially and environmentally sustainable lithium concentrate,
announces it will release its financial results for the first quarter ended March 31, 2024 before market open on
May 16, 2024. The release will be followed by an investor conference call the same day at 12:00 p.m. ET.
To register for the call, please proceed through the following link Register here.
Sigma Lithium’s first quarter 2024 press release, investor presentation and quarterly filings will be available
through the company's investor relations website, ir.sigmalithiumresources.com. A webcast replay will also be
available following the conclusion of the event.
ABOUT SIGMA LITHIUM
Sigma Lithium (NASDAQ: SGML, BVMF: S2GM34, TSXV: SGML) is a leading global lithium producer dedicated to
powering the next generation of electric vehicle batteries with carbon neutral, socially and environmentally
sustainable lithium concentrate.
Sigma Lithium operates at the forefront of environmental and social sustainability in the EV battery materials
supply chain and is currently producing Quintuple Zero Green Lithium concentrate from its Grota do Cirilo
Project in Brazil. Phase 1 of the project entered commercial production in 2Q23 and has an annual capacity of
270,000 tonnes of concentrate (36,700 LCE annually). The Company is currently evaluating a decision to
expand production via a Phase 2 concentrate line and associated mine which would add another 250,000
tonnes of annual Quintuple Zero Green Lithium capacity. The project produces lithium concentrate at its state-
of-the-art Greentech lithium plant that uses 100% renewable energy, 100% recycled water and 100% dry -
stacked tailings.
Please refer to the Company’s National Instrument 43-101 technical report titled "Grota do Cirilo Lithium Project
Araçuaí and Itinga Regions, Minas Gerais, Brazil, Amended and Restated Technical Report" issued June 12, 2023,
which was prepared for Sigma Lithium by Homero Delboni Jr., MAusIMM, Promon Engenharia; Marc -Antoine
Laporte, P.Geo, SGS Canada Inc; Jarrett Quinn, P.Eng., Primero Group Americas; Porfirio Cabaleiro Rodriguez,
(MEng), FAIG, GE21 Consultoria Mineral; and Noel O' Brien, B.E., MBA, F AusIMM (the “Updated Technical
Report”). The Updated Technical Report is filed on SEDAR and is also available on the Company’s website.
For more information about Sigma Lithium, visit https://www.sigmalithiumresources.com/
| 2
FOR ADDITIONAL INFORMATION PLEASE CONTACT
Matthew DeYoe, EVP Corporate Affairs & Strategic Development
+1 (201) 819-0303
Daniel Abdo, Director, Investor Relations
+55 11 2985-0089
Sigma Lithium
Sigma Lithium
@sigmalithium
@SigmaLithium
FORWARD-LOOKING STATEMENTS
This news release includes certain "forward -looking information" under applicable Canadian and U.S. securities legislation,
including but not limited to statements relating to timing and costs related to the general business and operational outlook of
the Company, the environmental footprint of tailings and positive ecosystem impact relating thereto, donation and upcycling of
tailings, timing and quantities relating to tailings and Green Lithium, achievements and projections relating to the Zero Tai lings
strategy, achievement of ramp-up volumes, production estimates and the operational status of the Groto do Cirilo Project, and
other forward -looking information. All statements that address future plans, activities, events, estimates, expectations or
developments that the Company believes, expects or anticipates will or may occur is forward -looking information, including
statements regarding the potential development of mineral resources and mineral reserves which may or may not occur.
Forward-looking information contained herein is based on certain assumptions regarding, among other things: general economic
and political conditions; the stable and supportive legislative, regulatory and community environment in Brazil; demand for lithium,
including that such demand is supported by growth in the electric vehicle market; the Company’s market position and future
financial and operating performance; the Company’s estimates of mineral resources and mineral reserves, includi ng whether
mineral resources will ever be de veloped into mineral reserves; and the Company’s ability to operate its mineral projects
including that the Company will not experience any materials or equipment shortages, any labour or service provider outages or
delays or any technical issues. Although management believes that the assumptions and expectations reflected in the forward-
looking information are reasonable, there can be no assurance that these assumptions and expectations will prove to be correct.
Forward-looking information inhere ntly involves and is subject to risks and uncertainties, including but not limited to that the
market prices for lithium may not remain at current levels; and the market for electric vehicles and other large format batte ries
currently has limited market share and no assurances can be given for the rate at which this market will develop, if at all, which
could affect the success of the Company and its ability to develop lithium operations. There can be no assurance that such
statements will prove to be accurate, as ac tual results and future events could differ materially from those anticipated in such
statements. Accordingly, readers should not place undue reliance on forward -looking information. The Company disclaims any
intention or obligation to update or revise any forward-looking information, whether because of new information, future events
or otherwise, except as required by law. For more information on the risks, uncertainties and assumptions that could cause our
actual results to differ from current expectations, please refer to the current annual information form of the Company and other
public filings available under the Company’s profile at www.sedar.com.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.