Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SGML.V ·

Sigma Lithium Provides Drilling Program Update Confirming High Grade and Low Impurity Lithium Resource Results to Date Consistent with Significant Resource Expansion Potential

Exploration Programs

Sigma Lithium Provides Drilling Program Update Confirming High Grade and

Low Impurity Lithium Resource

Results to Date Consistent with Significant Resource Expansion Potential

VANCOUVER, British Columbia, Sept. 13, 2018 -- SIGMA Lithium Corporation ("Sigma " or the "Corporation") (TSX-V:

SGMA) is pleased to provide updated assay results on the Company’s ~30,000m diamond drilling campaign of lithium

deposits at its Grota do Cirilo Property. The project’s existing lithium mineral resources is expected to significantly increase,

as previously identified in Sigma’s existing National Instrument 43-101 (“NI 43-101”) independent technical report filed earlier in

2018.

“Our August drilling results confirm the high quality and low impurities of this substantial lithium resource,” said Calvyn

Gardner, CEO of Sigma. “Importantly we have received strong indicators from exploration holes in three of our top lithium

deposits, which supports our expectation the total resource volume has the potential to be significantly increased. We are

preparing to ship samples to potential offtake partners and look forward to providing further updates as we continue to advance

the project towards production and validate additional mineral resources.”

Drill Results for August 2018 on Grota do Cirilo Lithium Property

In late May 2018, Sigma commenced a ~30,000m diamond (HQ core) drilling campaign to extend and develop the existing

Grota do Cirilo spodumene lithium mineral resource. Once completed, this drilling campaign will be the basis for a revised

mineral resource estimate, to be prepared by SGS Canada Geostat (“SGS”), which is expected to be finalized by the end of

2018.

The drilling program is divided into two work streams:

• A 6,000m drilling program for the definitive feasibility study of the Xuxa deposit, Sigma’s foothold mine. The drilling

consists of 27 holes focusing on: (i) increasing the size of the mineral resource, (ii) producing metallurgical samples at

depth and (ii) conducting geotechnical studies;

• A 25,000m definition drilling campaign for the additional four lithium deposits in the property (Barreiro, Lavra do Meio,

Murial and Nezem do Chicao) contemplating drilling 96 holes at Barreiro, 19 at Lavra da Meio, 30 holes at Murial and 4

holes at Nezem do Chicao

The drilling assays received for the month of August 2018 from the definition drilling campaign for three of the lithium deposits

(Xuxa, Barreiro and Murial) are described below:

1. Xuxa

• The Xuxa drilling campaign contemplates 27 holes (6186m), all of which all have been completed, with an average depth

of 229m. Sigma has received 30% of the assay results to date and the current results indicate the potential to increase

the level of confidence of mineral resources between 0m and 200m vertical from the surface.

• All the assays received demonstrate the continuity of the mineralization down to 200m and in some cases even down

to 285m. The expansion of the mineralized zone down to 200m at Xuxa will allow us to further upgrade the mineral

resource, adding additional volume. The geological 3D model is currently being updated, while the remaining assays are

pending.

• Highlights from the Xuxa assays are: 

◦ 22.5m at 1.86% Li2O  from 152.1m to 174.6m interval (drill hole DH-Xuxa - 72) 

◦ 15.9m at 1.81% Li2O from 162.1m to 178.0m (drill hole DH-Xuxa -74) 

◦ 12.2m at 1.78% Li2O from 170.2 m to 182.4m (drill hole DH-Xuxa -75)

2. Barreiro

• The Barreiro drilling campaign contemplates 96 holes (16000m), of which 84 holes have been drilled to date, for a total

of 12,752m. Average thickness of the deposit is around 35m, the average drill hole depth is around 151m and deepest

hole drilled to-date is 369m.

• The deeper holes are the results of the pegmatite being over 140m thick in these areas.

• Sigma has received 50% of the assay results with an average grade of 1.4% Li2O in the pegmatite indicating that

Barreiro could potentially become a significant deposit, on a similar scale to the Xuxa deposit.

Highlights from the Barreiro assays are:

◦ 38.0m at 1.79% Li2O from 117.0m to 155.9m (drill hole DH-Bar-40)

◦ 31.2m at 1.76% Li2O from 187.9m to 219.1m (drill hole DH -Bar-43)

◦ 33.1m at 1.68% Li2O from 46.9m to 80.0m (drill hole DH-Bar-47)

◦ 33.9m at 1.78% Li2O from 98.1m to 132.0m (drill hole DH-Bar 42)

3. Murial

• The Murial drilling campaign contemplates 30 holes (4500m), of which 20 holes have been drilled to date, for a total of

3025m. Average thickness of the deposit is around 20m, the average drill hole depth is around 151m and deepest hole

drilled to-date is 251m.

• Sigma has received 25% of the assay results to-date.

Highlights from the Murial assays are:

◦ 23.6m at 1.31% Li2O from 64.2m to 87.7m (drill hole DH-Mur-2)

◦ 37.6m at 1.2% Li2O from 84.5m to 122.1m (drill hole DH -Mur-5)

The following table sets out the latest assay results received for the month of August 2018:

Pegmatite DH_ID From To Int1 Geo Li2O % Average

Barreiro DH-BAR-40 117.0 155.9 38.8 PG_Li 1.8%

Barreiro DH-BAR-40 157.6 163.3 5.7 PG_Li 1.0%

Barreiro DH-BAR-40 167.7 170.3 2.6 PG_Li 0.3%

Barreiro DH-BAR-41 54.2 84.5 30.4 PG_Li 1.6%

Barreiro DH-BAR-41 91.5 92.7 1.2 PG_Ab_Q 1.0%

Barreiro DH-BAR-41 95.7 97.2 1.6 PG_Ab_Q 0.2%

Barreiro DH-BAR-43 165.1 167.3 2.2 PG_Ab_Q 0.1%

Barreiro DH-BAR-43 183.0 186.9 3.9 PG_Li 1.6%

Barreiro DH-BAR-43 187.9 219.1 31.2 PG_Li 1.8%

Barreiro DH-BAR-47 46.9 80.0 33.1 PG_Li 1.7%

Barreiro DH-BAR-48 86.1 119.1 33.0 PG_Li 1.6%

Barreiro DH-BAR-51 20.0 37.5 17.5 PG_Li 1.2%

Barreiro DH-BAR-42 98.1 132.0 33.9 PG_Li 1.8%

Xuxa DH-XUX-72 152.1 174.6 22.5 PG_Li 1.9%

Xuxa DH-XUX-73 86.0 91.9 5.9 PG_Li 1.7%

Xuxa DH-XUX-73 94.2 104.1 9.8 PG_Li 1.6%

Xuxa DH-XUX-74 162.1 178.0 15.9 PG_Li 1.8%

Xuxa DH-XUX-75 170.2 182.4 12.2 PG_Li 1.8%

Xuxa DH-XUX-75 185.2 186.6 1.3 PG_Li 1.0%

Murial DH-MURIAL-02 64.2 87.7 23.6 PG_Li 1.3%

Murial DH-MURIAL-03 154.3 156.3 2.0 PG_Ab_Q 0.0%

Murial DH-MURIAL-03 165.0 169.9 4.1 PG_Ab_Q 0.0%

Murial DH-MURIAL-05 153.3 162.8 9.6 PG_Ab_Q 0.4%

Murial DH-MURIAL-06 84.5 122.1 37.6 PG_Li 1.2%

(1) The intervals reported in this table represent drill intercepts and insufficient data is available at this time to state the true

thickness of the mineralized intervals

Quality Control

QA/QC program involving blank samples (4% of the sampling stream), standard samples (4% of the sampling stream) and field

duplicates (6% of the sampling stream) has been established during sampling. A further 6% of the mineralized samples will

also be sent to the ALS Laboratory in Vancouver, British Columbia for pulp duplicates once the campaign is over. All assays

are analyzed at SGS’s Belo Horizonte laboratory using a multi-elements peroxide fusion ICP-AES on half-core 1 kg sample

selected by geologist.

ABOUT SIGMA

Sigma Lithium Corporation is developing a world class lithium hard rock deposit with high grade and exceptional mineralogy at

its Grota do Cirilo property in Minas Gerais Brazil. Sigma commissioned its Phase I production plant and has commenced the

production of battery-grade spodumene concentrate from its high-quality deposits. Sigma’s corporate mission is to execute its

strategy while embracing environmental, social, and governance principles. The Corporation is on track to become an ultra-

high quality spodumene concentrate supplier to the lithium battery industry worldwide.

Sigma shareholders include some of the largest ESG (environmental, sustainability, governance) focused institutional investors

in the world. Sigma plans to commence construction of a commercial-scale lithium concentration plant in 2019, becoming a

fully-operational sustainable lithium producer in 2020.

Sigma, through its subsidiaries, has 28 mineral rights in four properties spread over 188 km2 and 18,887 hectares - with over

200 lithium bearing pegmatites and 11 former historical lithium mines. The Grota do Cirilo property, Sigma’s primary focus,

includes 10 mining concessions (mining production authorizations).

Sigma has a NI 43-101 technical report on the Grota do Cirilo property prepared by SGS, which includes estimated measured

and indicated resources of approximately 12,900,000 tonnes for its main deposit (8,502,000t measured and 4,385,000t

indicated), with a high average grade of 1.56% (for approximately 500,000t of LCE). The technical report also includes

estimated inferred resources of 608,348t and further notes the potential for significant resource expansion.

Qualified Person

The resources estimates in this news release are included in (and the estimated LCE is derived from the resource estimates

included in) the technical report titled “Technical Report Northern and Southern Complexes Project, Araçuai and Itinga, Brazil,

Sigma Lithium Resources Inc.” which has an effective date of January 29, 2018 and was prepared by Marc-Antoine Laporte,

P.Geo, M.Sc. of SGS. Mr. Laporte is a qualified person as defined by NI 43-101 and is independent of Sigma.  The report is

available at www.sedar.com. Mr. Laporte has also reviewed and approved the scientific and technical information in this news

release.

For additional  information please contact:

Sigma Lithium Resources Corporation / www.sigmalithiumresources.com

Company Contact:

Ana Cabral

Vice – Chairman

Director of Business Development and Investor Relations

+55 11 2985-0089

[email protected]

Investor Relations Contact:

KCSA Strategic Communications

Valter Pinto / Scott Eckstein

(212) 896-1254

[email protected]

FORWARD-LOOKING STATEMENTS

This news release contains forward-looking statements relating to the objectives of the Corporation, the potential for increased

resources, concentration plant construction, achieving sustainable production and other statements that are not historical

facts. Readers are cautioned not to place undue reliance on forward-looking statements, as there can be no assurance that

the plans, intentions or expectations upon which they are based will occur. By their nature, forward-looking statements involve

numerous assumptions, known and unknown risks and uncertainties, both general and specific, that contribute to the

possibility that the predictions, forecasts, projections and other forward-looking statements will not occur, which may cause

actual performance and results in future periods to differ materially from any estimates or projections of future performance or

results expressed or implied by such forward-looking statements. These assumptions, risks and uncertainties include, among

other things: the state of the economy in general and capital markets in particular, and investor interest in the business and

future prospects of Sigma.

The forward-looking statements contained in this news release are made as of the date of this news release. Except as

required by law, Sigma disclaims any intention and assumes no obligation to update or revise any forward-looking statements,

whether as a result of new information, future events or otherwise, except as required by applicable securities law. Additionally,

Sigma undertakes no obligation to comment on the expectations of, or statements made, by third parties in respect of the

matters discussed above.

The key risks and uncertainties that could cause actual results or the material factors and assumptions applied in preparing

forward-looking information to differ materially from predictions, forecasts, projections, expectations or conclusions are

discussed in the “Risk Factors” section of Sigma’s Filing Statement dated April 25, 2018.  We caution that the foregoing list

is not exhaustive of all possible factors.

For more information on the risks, uncertainties and assumptions that could cause our actual results to differ from current

expectations, please refer to our public filings available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.