Trigon Metals Reports First Quarter Operating and Financial Results

Financials

Page 1 of 7

Trigon Metals Reports First Quarter Operating and

Financial Results

Toronto, Ontario – Trigon Metals Inc. (TSX-V: TM, OTCQB: PNTZF) (“Trigon” or the “Company”) is pleased

to announce its operating and financial results for the three months ended June 30, 2024. Shareholders

and interested parties are invited to join a conference call hosted by Trigon management, tomorrow,

Thursday, August 22, 2024, at 11:00 a.m. Eastern time to discuss the results. Dial-in details for the call can

be found near the end of this press release. All amounts are expressed in U.S. dollars, unless otherwise

stated.

Highlights

• The Kombat mine achieved first full quarter production with underground contribution in Q1 for

fiscal year end in 2025, marking a major inflection point for the Company

• First quarter copper production was 2,302,726 pounds at C1 cash costs(1) of $3.23 per pound of

copper produced.

• Silver production during the quarter was 33,399 ounces

• Positive Adjusted EBITDA (1) contribution of $1.8 million

• Net loss attributable to the shareholders of the Company of $2.1 million, or $0.05 per share on a

basic and diluted basis compared to a net loss of $2.95 million, or $0.02 per share in the three

months ended June 30, 2023 on a basic and diluted basis.

• Following excellent operating performance at the Kombat mine during the quarter, the

Company is reaffirming all other 2025 fiscal year-end production, and C1 cash cost guidance

ranges

Jed Richardson, CEO and Executive Chairman of Trigon, commented , “Grade is king at Kombat, our first

full quarter of contribution from our high grade underground is demonstrating the profitability at the

mine. Achieving solid copper and silver production driven by favourable grade reconciliations have

continued into the second quarter. This trend has allowed us to maintain our full-year copper and silver

production guidance, which we expect will translate to achieving the lower end of our fiscal year 2025

cash cost guidance.”

Page 2 of 7

Mining & Milling Operations

At the Kombat mine, the first quarter was marked by several record -breaking underground mining days.

Underground ore tonnes mined for the quarter totalled 57,070 tonnes at an average grade of 2.05%, and

open pit production of 29,715 tonnes at an average grade of 1.23%. A total of 70,483 tonnes were milled

during the quarter at a 1.67% average grade resulting in the production of 1,045 tonnes of copper.

The Company announced Commercial Production from the underground mine on April 30, 2024, and is

pleased to report that the underground mine has continued to perform and exceed the mining targets

defined in its feasibility study (the “Feasibility Study”). The Feasibility Study was prepared by SRK

Consulting South Africa (Pty) Ltd (“SRK”) in accordance with Canadian Securities Administrators’ National

Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”).

Image 1: Kombat Open Pit

Page 3 of 7

Image 2: Kombat Underground

Image 3: Inside the Mill at Kombat Mine

Page 4 of 7

Table 1: Operating and Financial Highlights (Reported in USD)

Three Months Ended Three Months Ended

June 30, 2024 March 31, 2024

MINING

OP Ore Mined (tonnes) 29,715 85,365

OP Copper Grade % 1.23% 0.98%

OP Silver Grade (g/t) 9.98 6.88

UG Ore Mined (tonnes) 57,070 12,160

UG Copper Grade 2.05% 2.36%

UG Silver Grade (g/t) 11.44 6.48

Total Ore Mined (tonnes) 86,785 97,525

MILLING

Ore Processed (tonnes) 70,483 69,354

Copper recovery (%) 88.3% 80.5%

Copper Concentrate Production (tonnes) 3,876 2,385

Concentrate Grade (Cu %) 27.1% 23.9%

Concentrate Grade (Ag g/t) 271 23.9%

Copper Product Produced (tonnes) 1,045 570

Copper Product Produced (lbs) 2,302,726 1,255,752

Silver Product Produced (oz) 33,399 14,653

SALES

Copper Concentrate Sold (dry metric tonnes) 4,596 2,095

Copper Concentrate Sold (lbs) 10,132,434 4,618,679

Copper Product Sold (tonnes) 968 424

Copper Product Sold (lbs) 2,134,072 934,759

Realized copper price (per lb) $ 4.18 $4.12

C1 cash cost/lb (100% payability) (1) $ 3.23 3.35

FINANCIAL HIGHLIGHTS

($ in 000's, except per share amounts)

Revenues $10,032 $3,853

Gross Profit $1,941 $ (153)

EBITDA $654 $16,260

Adjusted EBITDA $1,800 $168

Cash flow from operations $70 $(740)

Net (loss) income $(2,215) $13,440

Page 5 of 7

Three Months Ended Three Months Ended

June 30, 2024 March 31, 2024

Net (loss) income attributable to shareholders of

the Company $(2,108) $13,908

Per share (basic) $(0.05) $(0.07)

Per share (diluted) $(0.05) $(0.07)

Cash, cash equivalents and short-term

investments $1,173 $1,417

OP = Open Pit

UG = Underground

(1)EBITDA, net income (loss) attributable to owners of the Company, income (loss) per share attributable to owners of the

Company, net (cash), working capital, C1 cash cost, copper production are non-IFRS measures. These measures do not have a

standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers.

Please refer to the Company’s discussion of Non-IFRS measures in its Management Discussion and Analysis for the three months

ended June 30, 2024.

Exploration Update

Trigon is allocating $2.5 million to $3.5 million to exploration programs for mineral reserve and resource

replacement and on other exploration prospects in and around Kombat’s existing infrastructure and

landholdings in the Kombat valley.

On April 18, 2024, the Company released the highlights of its exploration campaign at Schlangental, a key

prospect within the wider Kombat property, situated approximately 15km east of the active mining licence

ML73B. This announcement followed the Company finalizing its comprehensive exploration plan for the

expansive Kombat property, spanning nearly 35 km from Gross Otavi in the west and Schlangental to the

east.

Drilling at Schlangental represents the first campaign testing mineralization outside of the main Kombat

mining license on the Copper King Extension exploration prospect. Surface mineralization attracted Trigon

geologists to the Schlangental area where rep orts of historic drilling indicated that mineralization

continued at depth, but no drill core or detailed logs were available. Of the planned 36 holes totalling

4000m, only two holes have been drilled to date, with both holes intercepting mineralization at modest

depths.

Subsequent Events

To support the commencement of production and associated working capital needs at the Kombat mine,

the Company entered into an agreement with IXM whereby IXM agreed to advance USD$2.5 million in

two tranches of USD$1.25 million each, with tranche one immediately drawn down and the second

tranche being available for drawdown between August 19, 2024 and August 30, 2024. The advance will

be repaid in principal portions of USD$208,334 per month commencing in October 2024 through

September 2025 repayable in deliveries of copper concentrate. Interest will be charged at the 30 -day

secured overnight financing rate average plus 2.5% and paid in cash.

Page 6 of 7

2025 Production and Cost Guidance

Following record operating performance at the Kombat mine during the quarter, the Company is

reaffirming its 2025 copper production guidance of 12,125,000 to 13,448,000 pounds of copper. The

Company expects mined and processed copper grades to remain in line with guidance for 2025.

The Company's updated cost guidance for 2024 assumes a foreign exchange rate of 18.40 NAD per USD

and a silver price of $25 per ounce.

Table 2: Financial Year 2025 Guidance

FY 2025 Guidance

Description Unit Floor Ceiling

Underground Mining Tonnes 250,000 280,000

Ore Grade % 1.95% 2.30%

Processing Tonnes 260,000 312,000

Copper Produced Tonnes 5,500 6,100

Copper Produced lbs 12,125,000 13,448,000

Cash Cost $/lbs 3.15 2.80

Conference Call Details

The Company will hold a conference call to discuss these results on Thursday, August 22, 2024 at 11:00

a.m. EST (8:00 a.m. PST). Please pre-register at the link provided below.

Date: Thursday, August 22, 2024

Time: 11:00 a.m. EST/8:00 a.m. PST

Dial in: Canada/USA: 1-800-990-4333

Toronto: 1-289 514-5000

New York: 1-646-769-9600

please dial in 5-10 minutes prior and ask to join the call

Pre-Register:

Registration link: https://emportal.ink/3ApVh5v

Replay: Canada/USA toll-free: 1-888-660-6264

Replay Passcode: 75661#

Page 7 of 7

Qualified Person

The technical information presented in this press release has been reviewed and approved for disclosure

by Fanie Müller, P.Eng, VP Operations of Trigon, who is a Qualified Person as defined by NI 43-101.

Trigon Metals Inc.

Trigon is a publicly-traded Canadian exploration and development company with its core business focused

on copper and silver holdings in mine-friendly African jurisdictions. Currently, the company has operations

in Namibia and Morocco. In Namibia, the Company holds an 80% inte rest in five mining licences in the

Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the

Company is focused on exploration and re-development of the previously producing Kombat Mine.

Cautionary Notes

This news release may contain forward-looking statements. These statements include statements

regarding the Company’s mining operations, the timing and results of mining activities, the Company’s

strategies and the Company’s abilities to execute such strategies, the Company’s expectations for the

Kombat mine, the economic viability of the Kombat mine, the Company’s ability to expand or replace

mineral resources and reserves, the projected costs and production at the Kombat mine, the agreement

with IXM and the Company’s ability to repay IXM, the prices of copper and silver and the Company’s future

plans and objectives. These statements are based on current expectations and assumptions that are

subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the

management discussion and analysis section of our interim and most recent annual financial statements

or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations.

We do not assume any obligation to update any forward-looking statements, except as required by

applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information, contact Investor Relations:

+1 647 276 6002

[email protected]

Website: www.trigonmetals.com