Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SF.V ·

Trigon Announces High Grade Copper Results from Drilling at Silver Hill, Morocco.

Drill Results

TRIGON ANNOUNCES HIGH GRADE COPPER RESULTS FROM

DRILLING AT SILVER HILL, MOROCCO.

TORONTO, May 20, 2021 – Trigon Metals Inc. (TSX-V: TM) (“Trigon” or the

“Company”) announces assay results from holes S16 through S21. The holes complete

the westernmost fences drilled to test the geometry and extent of the mineralization at

the Silver Hill project (“Silver Hill” or the “Project”) in Morocco. The results comprise the

second and third of four fences drilled at the Project.

Each of the holes demonstrated strong copper and silver mineralization. The most

significant of the results was hole S20 showing 31 metres of 0.74% copper and 23 g/t

silver with higher grade intervals. The hole is drilled at the western extent of the drilling

of this campaign and suggests that mineralization remains strong.

Highlights

• Hole S16: 10 metres @ 0.98% copper and 20 g/t silver

• Hole S17: 3 metre @ 1.41% copper

• Hole S20: 31 metre @ 0.74% copper and 23 g/t silver including:

o 8 metre @ 1.35% copper and;

o 6 metre @ 1.23% copper and 75 g/t silver

See Figure 1 below for detailed assay results from holes S16 -- S21

Jed Richardson, President and CEO of Trigon Metals, said, “Silver Hill continues to

meet our highest expectations. The strength of these intercepts are particularly striking

since they come at the western extent of our drilling. This firmly shows that the deposit

remains open in all directions.”

Diagram 1: Two-Dimensional Cross Section of Fence 2 Drilling and Location Map

Diagram 2: Two-Dimensional Cross Section of Fence 3 Drilling and Location Map

Drill core was analyzed by AfriLab, an independent SGS accredited laboratory in

Marrakech. Trigon has completed the drilling of an additional fence, the results of which

will be reported in the coming weeks. The Company is pleased with its progress, as

geologists are attaining a more comprehensive understanding of the nature and size of

the mineralization at the Project.

Figure 1: Continuous Sample Data from Fence 2 and Fence 3

Drill N° From To Ref Cu (%) Ag (g/t)

S16

24 25 121013 0.25 4

25 26 121014 1.7 4

26 27 121015 2.16 8

27 28 121016 0.69 4

28 29 121017 0.51 12

29 30 121018 0.51 32

30 31 121019 0.24 16

31 32 121020 0.37 16

32 33 121021 0.71 52

33 34 121023 1.22 24

34 35 121024 1.67 32

35 36 121025 0.35 12

36 37 121026 0.43 1

37 38 121027 0.19 1

38 39 121028 0.04 1

S17

39 40 121029 0.48 1

40 41 121030 3.52 1

41 42 121031 0.24 1

S18

57 58 121032 0.01 1

58 59 121034 0.01 1

59 60 121035 0.01 1

S19

7 8 121036 0.03 1

8 9 121037 0.22 1

9 10 121038 0.6 1

10 11 121039 0.5 1

11 12 121040 0.03 4

S20

7 8 121041 0.31 4

8 9 121042 0.3 4

9 10 121043 0.16 1

10 11 121045 0.21 1

11 12 121046 0.35 1

12 13 121047 0.82 1

13 14 121048 0.8 4

14 15 121049 0.51 4

15 16 121050 2.83 17

16 17 121051 2.84 34

17 18 121052 0.86 9

18 19 121053 1.35 4

19 20 121054 0.79 1

20 21 121056 0.44 1

21 22 121057 0.25 1

22 23 121058 0.46 1

23 24 121059 0.58 30

24 25 121060 0.22 1

25 26 121061 0.09 4

26 27 121062 0.05 4

27 28 121063 0.51 34

28 29 121064 0.25 9

29 30 121065 0.65 38

30 31 121067 0.38 13

31 32 121068 0.63 38

32 33 121069 0.51 43

33 34 121070 4.58 242

34 35 121071 0.66 77

35 36 121072 0.21 4

36 37 121073 0.08 4

37 38 121074 0.18 4

38 39 121075 0.14 9

39 40 121076 0.04 4

40 41 121078 0.11 4

41 42 121079 0.05 4

42 43 121080 1.31 68

43 44 121081 0.2 9

44 45 121082 0.01 4

7 8 121041 0.31 4

8 9 121042 0.3 4

9 10 121043 0.16 1

10 11 121045 0.21 1

11 12 121046 0.35 1

12 13 121047 0.82 1

13 14 121048 0.8 4

14 15 121049 0.51 4

15 16 121050 2.83 17

16 17 121051 2.84 34

17 18 121052 0.86 9

18 19 121053 1.35 4

19 20 121054 0.79 1

20 21 121056 0.44 1

21 22 121057 0.25 1

22 23 121058 0.46 1

23 24 121059 0.58 30

24 25 121060 0.22 1

25 26 121061 0.09 4

26 27 121062 0.05 4

27 28 121063 0.51 34

28 29 121064 0.25 9

29 30 121065 0.65 38

30 31 121067 0.38 13

31 32 121068 0.63 38

32 33 121069 0.51 43

33 34 121070 4.58 242

34 35 121071 0.66 77

35 36 121072 0.21 4

36 37 121073 0.08 4

37 38 121074 0.18 4

38 39 121075 0.14 9

39 40 121076 0.04 4

40 41 121078 0.11 4

41 42 121079 0.05 4

42 43 121080 1.31 68

43 44 121081 0.2 9

44 45 121082 0.01 4

S21

45 46 121083 0.01 4

46 47 121084 0.01 4

47 48 121085 0.01 4

Qualified Person

The technical information presented in this press release has been reviewed and

approved for disclosure by Fanie Müller, P.Eng, VP Operations of Trigon, who is a

Qualified Person as defined by NI 43-101.

Trigon Metals Inc.

Trigon is a publicly traded Canadian exploration and development company with its core

business focused on copper and silver holdings in mine -friendly African jurisdictions.

Currently the company has operations in Morocco and Namibia. The Company recently

finalized the acquisition of th e Silver Hill project, a highly prospective copper and silver

exploration project in Morocco. Namibia is one of the world’s most prospective copper

regions, where Trigon has substantial assets in place. The Company hold s an 80%

interest in five mining lice nces in the Otavi Mountainlands, an area of Namibia widely

recognized for its high -grade copper deposits, where the Company is focused on

exploration and re-development of the previously producing Kombat mine.

Cautionary Notes

This news release may contain forward-looking statements. These statements include

statements regarding the Silver Hill Project, current and future exploration programs, the

mineralization at the Project, the Company’s strategies and the Company’s abilities to

execute such strategies, the Company’s expectations for the Silver Hill and Kombat

Projects, the Company’s future plans and objectives. These statements are based on

current expectations and assumptions that are subject to risks and uncertainties. Actual

results could differ materially because of factors discussed in the management discussion

and analysis section of our interim and most recent annual financial statements or other

reports and filings with the TSX Venture Exchange and applicable Canadian securities

regulations. We do not assume any obligation to update any forward-looking statements,

except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term

is defined in the policies of the TSX Venture Exchange) accepts responsibility for

the adequacy or accuracy of this release.

For further information, contact:

Jed Richardson

+1 647-276-6001

[email protected]

Website: www.trigonmetals.com