Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SF.V ·

S I L Ve R HI Ll Dri L LI NG Sho W S We L L M I Ne Ra LI Zed Ha Lo a Ro Un D

Corporate Updates

S I L VE R HI LL DRI L LI NG SHO W S WE L L M I NE RA LI ZED HA LO A RO UN D

H I G H-G RA D E CO RE I N M O RO C CO

TORONTO, August 10, 2020

Trigon Metals Inc. (TSX-V: TM) (“Trigon” or the “Company”) is pleased to report assay results from an

elementary exploratory drilling program at the Company’s Silver Hill copper -silver project (“the

Project”) in Morocco (see table and figures below). The results reported are from exploratory drilling

undertaken by Trigon’s acquisition target Technomine Africa SARL (“Technomine”) , based on the local

company’s knowledge of the area . A formal drill program is now being planned by Trigon, as more

fully described below .

For the purposes of th e latest preliminary drilling , Technomine had use of a small underpowered rig

only capable of drilling shallow holes, of which t hree of the four reached the targeted mineralized

structure , and two of the four ended in mineralization. The recent results demonstrate good

minerali zation over a larger than expected horizon . To advance the project, Trigon will utili ze these

encouraging results to design and implement a full exploration program to required standards.

The latest results are highlighted by:

• S1 - Silver Hill Hole 1: intercepted 13.5 metres grading 71.5 g/t silver and 1.08% at 26.5 to 40

metres down the hole, drill core ended in mineralization. Within the drill intercept was 2.5

metres grading 266.6 g/t silver and 3.87 % copper.

• S3 – Silver Hill Hole 3: intercepted 7.0 metres grading 48.6 g/t silver and 0.75% copper at 25 to

32 metres down the hole, the hole ended at 35.5 metres. Within the drill intercept was 1.5

metres grading 122 g/t silver and 1.59% copper.

• S5 – Silver Hill Hole 5: intercepted 5.0 metres grading 18.9 g/t silver and 1.49 % copper at 29 to

34 metres down the hole, drill core ended in mineralization.

Holes were drilled at a 70o angle and drill intercepts are presumed to represent true width of the

structure. Silver Hill Hole S2 did not reach the mineralized layer. The hole reached a maximum depth of

36 metres.

Jed Richardson, President and CEO of Trigon Metals, said, “We are very pleased by these initial results

from Silver Hill, which demonstrate that the high grade surface samples we initially received were

indicative of the mineralization underneath, and show there are notable grades of silver and copper

in the rock above and below the visibly mineralized layer . Particularly encouraging were certain results

that showed very little visible mineralization but returned very high copper grades at the end of the

hole, suggesting more mineralization may occur beyond the reach of the drill hole . In S1, the upper

portions of the mineralized layer showed elevated grades of copper before silver grades increased as

the hole went deeper. We are encouraged to test S4 and S6 - holes that were visibly similar but were

not initiall y analyzed because time was limited for sample preparation. ”

Table 1 – Silver Hill Drill Results

Hole ID From (m) To (m) Intercept (m) Ag (g/t) Cu (%)

SH S1* 27.5 40.0 13.5 71.5 1.08

Including* 32.0 40.0 8.0 115.8 1.59

including 33.5 36.0 2.5 266.6 3.87

SH S3 25.0 32.0 7.0 48.6 0.75

including 30.0 31.5 1.5 122 1.59

SH S5* 29.0 34.0 5.0 18.9 1.49

*ended in mineralization

As indicated above (see Table 1– Silver Hill Drill Results ), work has begun on site at Silver Hill for Trigon’s

own program to test the extent of this mineralization. Trigon has planned drilling and systematic surface

sampling to test the down dip extension of the mineralization delineated in this drilling, to test t he

relationship between the upper structure (focus of the reported drilling) and the two other structures

identified in early surface sampling (see Figure 1 - Silver Hill Global Map), and connect the upper structure

to what appears to be lateral extension, identified by ancient workings almost 1.5 km to 2 km away.

Figure 1 - Silver Hill Global Map

Figure 2 – Silver Hill Focused Area

Silver Hill Project Overview

The Silver Hill Project is a 16km2 property in the Anti-Atlas region of Morocco. The Project is located at a

regional address well known for base metals occurrences in Morocco. Morocco has a mining history that

stretches over 100 years and is well known for being a mining friendly jurisdiction. Preliminary s urface

exploration shows copper and silver mineralization at high grades distributed over a wide surface area.

Slags from ancient workings indicate historical large-scale mining for silver. As noted in the press release

dated August 4, 2020, closing of the transaction is expected to occur shortly.

Qualified Person

The technical information presented in this press release has been reviewed and approved for disclosure

by Fanie Müller, P.Eng, VP Operations of Trigon, who is a Qualified Person as defined by NI 43-101.

Trigon Metals Inc.

Trigon is a publicly traded Canadian exploration and development company with its core business focused

on copper and silver holdings in mine-friendly African jurisdictions. Currently the company has operations

in Namibia and Morocco. Namibia is one of the world’s most prospective copper regions, where Trigon

has substantial assets in place. The Company continues to hold an 80% interest in five mining licen ces in

the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits where

the Company is focused on exploration and re -development of the previously producing Kombat mine.

The Company is also currently finalising the acquisition of the Silver Hill project, a highly prospective

copper and silver exploration project in Morocco.

For further information, contact:

Jed Richardson

+1 416 566-8134

[email protected]

Website: www.trigonmetals.com

Cautionary Notes

This news release may contain forward-looking statements. These statements include statements

regarding the exploratory drill program at Silver Hill and the results thereof, the future exploration plans

for Silver Hill, the prospectivity of the Project, the Company’s ability to explore and advance the Project,

the impact of COVID-19 on the Company’s operations, the Company’s strategies and the Company’s

abilities to execute such strategies, and the Company’s future plans and objectives. These statements are

based on current expectations and assumptions that are subject to risks and uncertainties. Actual results

could differ materially because of factors discussed in the management discussion and analysis section of

our interim and most recent annual financial statements or other reports and filings with the TSX Venture

Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any

forward-looking statements, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.