Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SEA.TO ·

Seabridge Gold Reports Application for Rescission of KSM Licence of Occupation and Mines Act Permit Was Unsuccessful

Corporate Updates

N

EWS

R

ELEASE

Trading Symbols: TSX: SEA

F

OR

I

MMEDIATE

R

ELEASE

NYSE: SA

November

20,

2023

Seabridge Gold

Reports Application for

Rescission

of KSM

Licence of Occupation and Mines Act Permit

Was Unsuccessful

Toronto, Canada

...

Seabridge Gold (TSX:SEA) (NYSE:SA)

(“Seabridge”)

provided an update

today

to

its news

release of July 17, 2023, announcing that

Tudor Gold Corp.

had submitted a request

to the BC Government

to cancel

a

certain license

of occupation (the “Licence”)

and

a

permit held by Seabridge’s wholly-owned

subsidiary, KSM Mining ULC (KSMCo). Tudor’s request

was not successful.

In

its

response

to

Tudor’s

application

to

cancel

the

permit,

the

BC

Ministry

of

Energy,

Mines

and

Low

Carbon

Innovation

confirmed

the

BC

Government’s

authority

to

issue

permits

within

an

area

where

mineral title is held by a third party. In its response to Tudor’s application to cancel the Licence, the BC

Ministry of

Water, Land and Resource Stewardship confirmed there is no basis to cancel the Licence under

the provisions of the

relevant legislation

or the terms of the Licence.

Mines Act permit M-245, held by KSMCo,

authorizes various activities, including activities

on

mineral

claims

held by

Tudor

along the route

of the

proposed

tunnels

connecting the

east and west sides of the KSM

Project

(the

“MTT”).

The

Licence

provides

KSMCo

the

right

to

occupy

the

area

in

which

it

intends

to

construct the MTT

for the purpose of constructing the MTT. Once the MTT are constructed, the Licence

will be converted into a statutory right of way for the entire length of the MTT, including the 12.5 km of the

MTT

that

pass

through

mineral

claims

owned

by

Tudor.

The

rights

conveyed

by

this

Licence

and

the

authorization of the

MTT

portal

construction

activities were initially conveyed and authorized in September

2014.

Commenting on the

BC Government’s responses

to

Tudor’s request, Seabridge’s CEO, Rudi Fronk,

stated,

“We are pleased

that the B.C.

Government

is

taking no action on Tudor’s request. We

understand that in

granting authorizations such as the Licence and the

permit the BC Government

will

consider the impacts

on

third parties such as

Tudor and protect the rights of

third parties,

which it has

done,

but in

confirming

our

Licence

and

the

permit we

believe

it is acting in accordance with the best

interests of the people of

BC.”

Seabridge holds a 100% interest in several North American gold projects. Seabridge's assets include the

KSM

and

Iskut

projects

located

in

Northwest

British

Columbia,

Canada’s

“Golden

Triangle”,

the

Courageous Lake project located in Canada's Northwest Territories, the Snowstorm project in the Getchell

Gold

Belt

of

Northern

Nevada

and

the

3

Aces

project

in

the

Yukon

Territory.

For

a

full

breakdown

of

Seabridge's Mineral Reserves and Mineral Resources by category please visit the Company's website at

http://www.seabridgegold.com

.

Neither the Toronto Stock

Exchange, New York Stock Exchange, nor their Regulation Services Providers accepts

responsibility for the adequacy or accuracy of this release.

ON BEHALF OF THE BOARD

"Rudi Fronk"

Chairman & C.E.O.

For further information please contact:

Rudi P.

Fronk, Chairman and C.E.O.

Tel: (416) 367-9292

•

Fax: (416) 367-2711

Email:

[email protected]

106 Front Street East, Suite 400, Toronto,

ON

M5A 1E1, Canada

416-367-9292 www.seabridgegold.com