Resource Estimates

Seabridge Gold Increases Gold and Copper Resources at

Iron Cap

Indicated resources increase by 0.46 million ounces of gold and 177 million

pounds of copper; inferred resources increase by 7.45 million ounces of

gold and 4.0 billion pounds of copper

Toronto, Canada--(Newsfile Corp. - March 12, 2019) - Seabridge Gold Inc. (TSX: SEA) (NYSE: SA) announced today that an

updated independent mineral resource estimate for the Iron Cap deposit has substantially increased its size while also

confirming higher grade zones within the overall resource. Iron Cap is one of four large gold/copper porphyry deposits within

Seabridge's 100%-owned KSM Project located in northwestern British Columbia. The updated resource estimate, dated as of

March 7, 2019, incorporates all previous drilling plus 20,341 meters of diamond core drilling completed in 18 holes during the

2018 program.

A comparison of the previous Iron Cap resource estimate and the updated one is as follows:

Iron Cap Undiluted Block-Cave Constrained Mineral Resources at C$16 NSR Cutoff

Date of Estimate

Resource

Category

Tonnes

(millions)

Average Grades

Contained Metal

Gold

(gpt)

Copper

(%)

Silver

(gpt)

Moly

(ppm)

Gold

(000

ounces)

Copper

(million

pounds)

Silver

(000

ounces)

Moly

(million

pounds)

February 2018

Indicated

370

0.43

0.23

4.2

48

5,112

1,874

49,931

39

Inferred

1,297

0.48

0.30

2.9

34

20,023

8,579

120,970

34

March 2019

Indicated

423

0.41

0.22

4.6

41

5,576

2,051

62,559

38

Inferred

1,899

0.45

0.30

2.6

30

27,474

12,556

158,741

126

Note: Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. Drill hole spacing in

the 2018 program was designed to meet two objectives: expand the known size of the Iron Cap deposit while also meeting

the requirements of an inferred resource estimate. Based on the relatively consistent nature of the deposit along with geologic

evidence amassed over the last 14 years of exploration work at the Project and the current drill hole spacing at Iron Cap, the

Company believes it is reasonable to expect that the majority of Inferred Mineral Resources could be upgraded to Indicated

Mineral Resources with further drilling.

Seabridge Chairman and CEO Rudi Fronk noted that the new resource estimate has achieved the targeted size and grade

which are likely to warrant moving the Iron Cap deposit ahead of the Kerr and Sulphurets deposits in the project's mine plan.

"Our exploration success at Iron Cap over the past two years gives us greater flexibility to optimize project economics. Iron Cap

is closer to infrastructure than Kerr and Sulphurets and its development could be faster and less costly. Within the 1.9 billion

tonnes of inferred resource, there exist significantly higher grade underground cave opportunities with substantial tonnage. Iron

Cap clearly has the size and grade to justify early inclusion in the mining sequence. From our point of view, this is mission

accomplished."

Fronk also noted that "These resource additions once again have met our annual corporate objective of increasing gold

ownership on a per share basis. We added 0.46 million ounces of indicated gold resources and 7.5 million ounces of inferred

gold resources from our 2018 program. In 2018, our shares outstanding increased by approximately 3.6 million shares resulting

from new financings to fund our programs plus other share issuances. Enhancing shareholder ownership of gold resources

remains a governing principle for our Company and 2018 marks another successful year in achieving this self-imposed

discipline."

Gold, copper, silver and molybdenum grades in the resource were estimated by Resource Modeling Inc. ("RMI") using ordinary

kriging methods. Independently designed gold, copper, silver, and molybdenum grade envelopes along with lithologic

wireframes provided the key constraints in the grade estimation plan. The grade envelopes were designed using drill hole

grades and an updated structural and lithologic model that have been developed for the Iron Cap deposit. A multi-pass ordinary

kriging estimation plan was developed using steeply oriented search ellipses to select eligible composites for block grade

estimation based on updated variography studies.

The grade models were validated visually and by comparisons with nearest neighbor grade models. The drill hole database that

was used for the estimate of the Iron Cap mineral resources consisted of data collected almost exclusively by Seabridge from

99 drill holes totaling about 67,000 meters of core drilling completed between 2005 and 2018. The entire 2018 electronic drill

hole assay database was compared against certified lab assay results by RMI with no errors discovered. RMI also reviewed the

quality assurance/quality control protocols and results associated with the Seabridge drilling. Based on the performance of the

standard reference materials and secondary laboratory check assay results, RMI believes that the Seabridge drill samples are

reproducible and suitable for estimating mineral resources.

Block net smelter return values ("NSR" values) were calculated by Moose Mountain Technical Services using metal recovery

projection formulae developed by Tetra Tech from metallurgical test work. This NSR value, stated in terms of Canadian dollars,

reflects metal prices, a US$/C$ currency exchange rate of 0.83, and offsite transportation, smelting, and refining charges. The

metal recovery estimates were updated using previous and additional test work completed in 2018.

Iron Cap was treated as a potential block cave (bulk underground) mining target. The lateral and vertical continuity of the zone

provides a geometric configuration that is likely to be amenable to this mining method. Seabridge has retained Golder

Associates, a leading industry expert in underground mining, to undertake bulk underground mining studies for KSM. Golder

used the block model prepared by RMI to establish three separate draw point elevations at an NSR shutoff value of C$16, and

the conceptual cave footprints at these three elevations were extruded upward by 495 meters and then clipped against one

another. Resources within the extruded shapes were tabulated for each of the three hypothetical draw point elevations using an

NSR cut-off value of C$16, consistent with the previous updated resource estimate in our February 13, 2018 News Release.

Evaluation of the economic potential of Iron Cap for the purposes of resource estimation was based on metal prices of US$3.00

per pound of copper, US$1300 per ounce of gold, US$20 per ounce of silver, US$9.70 per pound of molybdenum and a

US$/C$ exchange rate of 0.83 together with estimated metal recoveries from metallurgical test work. These metal prices are

generally in line with, or lower than, the metal prices used by major mining companies for their current resource disclosure for

similar types of projects.

The 2018 drill program at Iron Cap confirmed that the deposit continues down dip and to the northwest. The 2018 drilling results

allowed for the expansion of the mineralized system along the hangingwall of the previous interpretation.

Within the conceptual

cave footprints extruded up 495 meters and clipped against one another, there exist large, higher grade zones. The following

table compares the undiluted tonnes and grades of the updated Iron Cap resource at higher NSR cut offs:

NSR Cutoff (C$)

Resource

Category

Tonnes

(millions)

Average Grades

Contained Metal

Gold

(gpt)

Copper

(%)

Silver

(gpt)

Moly

(ppm)

Gold

(000

ounces)

Copper

(million

pounds)

Silver

(000

ounces)

Moly

(million

pounds)

16

Indicated

423

0.41

0.22

4.6

41

5,576

2,051

62,559

38

Inferred

1,899

0.45

0.30

2.6

30

27,474

12,556

158,741

126

20

Indicated

361

0.44

0.24

4.7

41

5,107

1,910

54,550

33

Inferred

1,675

0.48

0.31

2.6

30

25,849

11,444

140,016

111

24

Indicated

274

0.50

0.25

5.1

39

4,405

1,510

44,927

24

Inferred

1,373

0.53

0.34

2.7

30

23,396

10,289

119,186

91

28

Indicated

195

0.56

0.27

5.3

34

3,511

1,160

33,228

15

Inferred

1,070

0.59

0.36

2.7

29

20,297

8,490

92,883

68

32

Indicated

132

0.64

0.28

5.5

29

2,716

815

23,341

8

Inferred

808

0.67

0.39

2.8

28

17,405

6,945

72,738

50

36

Indicated

87

0.72

0.29

5.6

23

2,014

556

15,664

4

Inferred

594

0.75

0.43

2.9

28

14,323

5,629

55,383

37

The rows highlighted in bold in the table above represent the updated undiluted mineral resource tonnes, grade, and contained

metal at a C$16 cut-off. The tonnes, grade, and contained metal for the other NSR cut-offs are shown to provide a relative sense

of the distribution of materials within the extruded shapes. It may be possible to develop higher grade lower tonnage caves given

the trends shown in the table.

Resource estimates included herein were prepared by RMI under the direction of Michael Lechner, who is independent of

Seabridge and a Qualified Person as defined by National Instrument 43-101. Mr. Lechner has reviewed and approved this news

release.

Exploration activities by Seabridge at the KSM Project are conducted under the supervision of William E. Threlkeld, Registered

Professional Geologist, Senior Vice President of the Company and a Qualified Person as defined by National Instrument 43-

101. Mr. Threlkeld has reviewed and approved this news release. An ongoing and rigorous quality control/quality assurance

protocol is employed in all Seabridge drilling campaigns. This program includes blank and reference standards; in addition, all

copper assays exceeding 0.25% Cu are re-analyzed using ore grade analytical techniques. Random cross-check analyses are

conducted at a second external laboratory on at least 10% of the drill samples. Samples are assayed at ISO and ASTM certified

laboratories in Vancouver, B.C., using fire assay atomic adsorption methods for gold and ICP methods for other elements.

Seabridge Gold holds a 100% interest in several North American gold resource projects. The Company's principal assets are

the KSM and Iskut properties located near Stewart, British Columbia, Canada and the Courageous Lake gold project located in

Canada's Northwest Territories. For a breakdown of Seabridge's mineral reserves and resources by project and category

please visit the Company's website at

http://www.seabridgegold.net/resources.php

.

Neither the Toronto Stock Exchange, New York Stock Exchange, nor their Regulation Services Providers accepts

responsibility for the adequacy or accuracy of this release.

All reserve and resource estimates reported by the Corporation were calculated in accordance with the Canadian

National Instrument 43-101 and the Canadian Institute of Mining and Metallurgy Classification system. These

standards differ significantly from the requirements of the U.S. Securities and Exchange Commission. An inferred

mineral resource is that part of a mineral resource for which quantity and grade are estimated on the basis of limited

geologic evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade

continuity. Mineral resources which are not mineral reserves do not have demonstrated economic viability.

This document contains "forward-looking information" within the meaning of Canadian securities legislation and

"forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of

1995. This information and these statements, referred to herein as "forward-looking statements" are made as of the

date of this document. Forward-looking statements relate to future events or future performance and reflect current

estimates, predictions, expectations or beliefs regarding future events and include, but are not limited to, statements

with respect to: (i) the estimated amount and grade of mineral resources at KSM's Iron Cap deposit ; (ii) the new

resource estimate having achieved the targeted size and grade which make it likely to warrant moving the Iron Cap

deposit ahead of the Kerr and Sulphurets deposits in the project's mine plan; (iii) the Seabridge drill samples being

reproducible and suitable for estimating mineral resources; (iv) lateral and vertical continuity of the mineralized zone

providing a geometric configuration that is likely to be amenable to block cave mining methods; and (v) the

possibility of developing higher grade lower tonnage caves at Iron Cap. Any statements that express or involve

discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or

performance (often, but not always, using words or phrases such as "expects", "anticipates", "plans", "projects",

"estimates", "envisages", "assumes", "intends", "strategy", "goals", "objectives" or variations thereof or stating

that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or

the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-

looking statements.

All forward-looking statements are based on Seabridge's or its consultants' current beliefs as well as various

assumptions made by them and information currently available to them. The principle assumptions are listed above,

but others include: (i) the presence of and continuity of metals at the Project between drill holes, including at

modeled grades; (ii) that costs of mining the Iron Cap deposit will be comparable to mining the Kerr deposit; (iii) the

capacities of various machinery and equipment; (iv) the availability of personnel, machinery and equipment at

estimated prices; (v) exchange rates; (vi) metals sales prices; (vii) block net smelter return values; (viii) conceptual

cave footprints, draw points and heights; (ix) appropriate discount rates; (x) tax rates and royalty rates applicable to

the proposed mining operation; (xi) financing structure and costs; (xii) anticipated mining losses and dilution; (xiii)

metallurgical performance; (xiv) reasonable contingency requirements; (xv) success in realizing proposed

operations; (xvi) receipt of regulatory approvals on acceptable terms; and (xvii) the negotiation of satisfactory terms

with impacted Treaty and First Nations groups. Although management considers these assumptions to be

reasonable based on information currently available to it, they may prove to be incorrect. Many forward-looking

statements are made assuming the correctness of other forward looking statements, such as statements of net

present value and internal rates of return, which are based on most of the other forward-looking statements and

assumptions herein. The cost information is also prepared using current values, but the time for incurring the costs

will be in the future and it is assumed costs will remain stable over the relevant period.

By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific,

and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or

that assumptions do not reflect future experience. We caution readers not to place undue reliance on these forward-

looking statements as a number of important factors could cause the actual outcomes to differ materially from the

beliefs, plans, objectives, expectations, anticipations, estimates assumptions and intentions expressed in such

forward-looking statements. These risk factors may be generally stated as the risk that the assumptions and

estimates expressed above do not occur, but specifically include, without limitation: risks relating to variations in

the mineral content within the material identified as mineral reserves or mineral resources from that predicted;

variations in rates of recovery and extraction; developments in world metals markets; risks relating to fluctuations in

the Canadian dollar relative to the US dollar; increases in the estimated capital and operating costs or unanticipated

costs; difficulties attracting the necessary work force; increases in financing costs or adverse changes to the terms

of available financing, if any; tax rates or royalties being greater than assumed; changes in development or mining

plans due to changes in logistical, technical or other factors; changes in project parameters as plans continue to be

refined; risks relating to receipt of regulatory approvals or settlement of an agreement with impacted First Nations

groups; the effects of competition in the markets in which Seabridge operates; operational and infrastructure risks

and the additional risks described in Seabridge's Annual Information Form filed with SEDAR in Canada (available at

www.sedar.com

) for the year ended December 31, 2017 and in the Corporation's Annual Report Form 40-F filed with

the U.S. Securities and Exchange Commission on EDGAR (available at

www.sec.gov/edgar.shtml

). Seabridge cautions

that the foregoing list of factors that may affect future results is not exhaustive.

When relying on our forward-looking statements to make decisions with respect to Seabridge, investors and others

should carefully consider the foregoing factors and other uncertainties and potential events. Seabridge does not

undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by

Seabridge or on our behalf, except as required by law.

ON BEHALF OF THE BOARD

"Rudi Fronk"

Chairman and C.E.O.

For further information, please contact:

Rudi P. Fronk, Chairman and C.E.O.

Tel: (416) 367-9292

•

Fax: (416) 367-2711

Email:

[email protected]

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/43341