Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SEA.TO ·

Geotechnical Drilling Begins Along Tunnel Route for Seabridge Gold’s KSM Project

Exploration Programs

News Release

Trading Symbols:

TSX: SEA

F

OR

I

MMEDIATE

R

ELEASE

NYSE: SA

July

9

, 2020

Geotechnical Drilling Begins Along Tunnel Route

for

Seabridge Gold’s

KSM Project

Toronto, Canada

... Seabridge Gold (TS

X:SEA) (NYSE:SA)

announced today

that geotechnical drilling has begun along the

proposed route of the

Mitchell Treaty Tunnels (“MTT”), a key infrastructure component of its 100%

-

owned KSM gold

-

copper project in north western British Columbia, Canada.

The p

ermit for the drill program w

as

o

btained from the BC

government on June 30, 2020.

The MTT is designed to connect the mine and mill, enabling the efficient transfer of ore to the mill from the mine

site

and

the

supply of electricity and

transport

ation

of

f

uel and other consumables in the

opposite direction to the mine. The location

of the mill and tailings management facility at some distance from the mines reflects the need for

a

site

with suitable

geotechnical characteristics where

responsible

tailings

ma

nagement

can

occur

. Tunnels are

m

ore cost effective and less

environmentally impactful than overland transport for the

approved

multi

-

decade mine life.

This year’s drilling will consist of about 4,000 meters in 10 holes to obtain information on the condi

tion of the rocks through

which

t

he tunnels will be driven. This data will help in the selection of the best excavation technology for tunnel

construction. Instrumentation will also be installed for ongoing data collection that will further assist tunnel d

esign.

Later this

summer

Seabrid

g

e plans to

undertak

e

a geophysics and short borehole drill program to determine foundation properties for

construction of one of the MTT''s key portals.

This summer’s

program

will be conducted on Seabridge

’s mineral tenures

and Crown land

subject to mine

r

al claims

included in the Treaty Creek Project held by a

joint venture

among Tudor Gold Corp.

(“Tudor”)

, American Creek Resources

Ltd. and Teuton Resources Corp

.

The

Crown land

on which Seabridge will be conducting its drilling is also the land subject

to

the

Licen

c

e

of Occupation for the

MTT

route granted

to Seabridge

by the provincial government on

September 27, 2014

.

The Licence of

Occupation

grants Seabridge rights to occupy the land of the MTT route for the purpose

of

constructing the

MTT.

Once Seabri

d

ge

has

evaluated

the drill core for geotechnical character

ist

i

cs

, core from the

Treaty Creek Project

will be

provided to Tudor. Seabridge will not assay the

Treaty Creek Project

core prior to delivering it to Tudor.

Seabridge Chairman and CEO Rudi Fronk

noted that the size of this year’s drill program has been scaled back from original

plans due to the impact of

the

COVID

-

19

pandemic

. “Our permit allows us to drill 40

holes,

but we have limited this

summer’s program to

only one drill rig and 10 holes to

r

educe the load on our camp facilities and protect our employees and

contractors. We will be following a very detailed protocol to minimize risks to our workers and

local Indigenous groups

.”

Seabridge holds a 100% inter

est in several North American gold p

r

ojects. The Company's principal assets are the KSM and

Iskut Projects located near Stewart, British Columbia, Canada and the Courageous Lake gold project located in Canada's

Northwest Territories. For a full breakdown o

f Seabridge's mineral reserves and m

i

neral resources by category please visit

the Company's website at

http://www.seabridgegold.net/resources.php

.

None of the Toronto Stock Exchange, New York Stock Exchange, or their Regulation Serv

i

ces Providers accepts

responsibility for the adequacy or accuracy of this release.

ON BEHALF OF THE BOARD

"Rudi Fronk"

Chairman & C.E.O.

For further

information please contact:

Rudi P. Fronk, Chairman and C.E.O.

Tel: (416) 367

-

9292

Fax:

(

416) 367

-

2711

Email:

[email protected]