Santacruz Silver Reports Second Quarter 2018 Financial Results

Financials

TSX.V: SCZ

FSE: 1SZ

August 30, 2018

Santacruz Silver Reports Second Quarter 2018 Financial Results

Vancouver, B.C. – Santacruz Silver Mining Ltd. (TSX.V:SCZ) (the “Company” or “Santacruz”) reports on

the operating and financial results from the Veta Grande Project in Zacatecas, Mexico and the Rosario Project

in San Luis Potosi, Mexico for the second quarter of 2018. The full version of the financial statements and

accompanying management’s discussion and analysis can be viewed on the Company’s website at

www.santacruzsilver.com or on SEDAR at www.sedar.com. All amounts are in thousands of US dollars

unless otherwise indicated.

"During the second quarter we saw the beginning of the turnaround in our mining operations. " stated Carlos

Silva, Chief Operating Officer of Santacruz. “Although the positive changes to our production volumes and

operating costs were modest we firmly belie ve that we are now on the path to improved operating results at

both Veta Grande and Rosario.” Mr. Silva continued, “With the mill expansion at Veta Grande completed and a

better delineated mine plan on its way, our focus now is to improve underground stop e production at both

mines. Anticipated improvements include an increase to the grade of mineralized material being fed to both

mills as well as higher metal recoveries which are expected to result in increased production and a lower unit

cost of production.”

Selected operating and financial information for the three-month periods ended June 30, 2018, March 31,

2018 and June 30, 2017 is presented below:

2018 Q2 2018 Q1 2017 Q2

Financial

Revenue – Mining Operations 1,466 753 2,641

Revenue – Mining Services 3,569 2,413 -

Gross Profit (Loss) (4) 1,287 (117) (1,827)

Debt Forgiveness 2,590 - -

Impairment - - (5,284)

Net Income (Loss) 3,297 (806) (8,485)

Net Income (Loss) Per Share – Basic ($/share) 0.02 0.00 (0.05)

Adjusted EBITDA (4) 1,048 (209) (1,390)

Operating

Material Processed (tonnes milled) 52,025 48,068 57,685

Silver Equivalent Produced (ounces) (1) 174,175 154,175 270,659

Silver Equivalent Sold (payable ounces) (2) 116,314 59,648 219,226

Production Cost per Tonne (3) ($/t) 66.12 52.97 59.15

Cash Cost per Silver Equivalent ($/oz.) (3) 32.54 45.94 21.24

All-in Sustaining Cost per Silver Equivalent ($/oz.) (3) 35.48 55.84 24.62

Average Realized Silver Price per Ounce ($/oz.) (2) (5) 16.55 16.78 17.17

(1) Silver equivalent ounces produ ced in 201 8 have been calculated using prices of US$1 7.00/oz., US$1, 295/oz., US$ 1.00/lb. and

US$1.35/lb. for silver, gold, lead and zinc respectively applied to the metal content of the lead and zinc concentrates produced by the

Company. Silver equivalent ounces produced in 2017 have been calculated using prices of US$16.00/oz., US$1,150/oz., US$1.00/lb.

and US$1.15/lb. for silver, gold, lead and zinc respectively applied to the metal content of the lead and zinc concentrates p roduced

by the Company.

(2) Silver equivalent sold ounces have been calculated using the realized silver prices stated in the table above, applied to the paya ble

metal content of the lead and zinc concentrates sold by the Company.

(3) The Company reports non -IFRS measures which include Produc tion Cost per Tonne, Cash Cost per Silver Equivalent, All -in

Sustaining Cost per Silver Equivalent and Average Realized Silver Price per Ounce. These measures are widely used in the min ing

industry as a benchmark for performance, but do not have a standar dized meaning and may differ from methods used by other

companies with similar descriptions.

(4) The Company reports additional non -IFRS measures which include Gross Profit (Loss) and Adjusted EBITDA. These additional

financial disclosure measures are intended to provide additional information.

(5) Average realized silver price per ounce is prior to all treatment, smelting and refining charges.

Financial Results

The Company realized an average silver price of $16. 55 per ounce during Q 2 2018 which is lar gely

unchanged from Q1 2018 and a 3% decrease as compared to Q2 2017.

The Company recorded net income of $3,297 in Q2 2018 compared to a net loss of $ 806 in Q1 2018 and net

loss of $ 8,485 in Q 2 2017. The Q 2 2017 net loss was significantly impacted by an impairment charge of

$5,284 related to the sale of the Gavilanes Property . The Q2 2018 net income was positively impacted by a

one-time adjustment of $2,590 relating to the forgiveness of certain trade debt by Carrizal.

Revenues in Q2 2018 of $5,035 include mining operations of $ 1,466 (Q2 2017 - $2,641; Q1 2018 - $753) and

mining services of $ 3,569 (Q2 2017 - $nil; Q 1 2018 - $2,413). Mining operations r evenues in Q 2 2018

decreased as a result of management’s decision to focus on mine development at both the Veta Grande and

Rosario Projects leading to lower grade mineralized material being sent for processing.

The Company recorded a gross profit of $1,287 during Q2 2018 (Q2 2017 – loss of $1,827; Q1 2018 – loss of

$117). The gross profit recorded in Q2 2018 and gross loss reported in Q1 2018 reflect the combined results

of the Company’s mining operations and mining services activities. During these periods the mining

operations resulted in gross losses of $2, 165 and $2,129 for Q2 2018 and Q1 2018 respectively while mining

services resulted in gross profit of $3,452 and $2,012 for the same periods.

Operational Results and Costs

Cash cost per ounce in Q2 2018 was $32.54 per payable ounce of silver sold, an increase of 53% from $21.24

per ounce in Q 2 2017 and a decrease of 29% from $ 45.94 per ounce in Q1 2018. Cash cost per ounce was

higher in Q2 2018 as compared to Q2 2017 primarily due to lower head grades in the quarter arising from

management’s decision to focus on mine development at both the Veta Gra nde and Rosario Projects leading

to lower grade mineralized material being sent for processing . Conversely cash cost per ounce was lower in

Q2 2018 as compared to Q1 2018 due to higher grade mineralized material being mined and processed in Q2

2018. Cash costs at both projects are expected to decrease in Q3 2018 as higher -grade material will be

available for mining on a consistent basis at that time and production throughput is also expected to increase.

All-in Sustaining Cost per ounce in Q2 2018 was $35.48 per payable ounce of silver sold , an increase of 44%

from $24.62 per ounce in Q 2 2017 and a decrease of 8% from $38.53 per ounce per ounce in Q1 2018. The

changes occurred for the same reasons as those relating to the cash cost per ounce changes referenced

above.

About Santacruz Silver Mining Ltd.

Santacruz is a Mexican focused silver company with two pr oducing silver projects ( Veta Grande Project and

Rosario Project) and two exploration properties (Minillas Property and Zacatecas Properties). The Company is

managed by a technical team of professionals with proven track records in developing, operating and

discovering silver mines in Mexico. Our corporate objective is to become a mid -tier silver producer.

‘signed’

Arturo Préstamo Elizondo,

President and CEO

For further information please contact:

Arturo Prestamo

Santacruz Silver Mining Ltd.

Email: [email protected]

Telephone: (011) (52) 81 8378 5707

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward looking information

Certain statements contained in this news release constitute "forward -looking information" as such term is

used in applicable Canadian securities laws. Forward -looking information is based on plans, expectations and

estimates of management at the date the information is provided and is subject to certain factors and

assumptions. In making the forward -looking statements included in this news release, the Company has

applied several material assumptions, that the Company's financial condition and development plans do not

change as a result of unforeseen eve nts, that third party mineralized material to be milled by the Company will

have properties consistent with management's expectations, that the Company will receive all required

regulatory approvals, and that future metal prices and the demand and market o utlook for metals will remain

stable or improve. Forward -looking information is subject to a variety of risks and uncertainties and other

factors that could cause plans, estimates and actual results to vary materially from those projected in such

forward-looking information. Factors that could cause the forward -looking information in this news release to

change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove

not to be valid or reliable, which cou ld result in lower revenue, higher cost, or lower production levels; delays

and/or cessation in planned work; changes in the Company's financial condition and development plans;

delays in regulatory approval; risks associated with the interpretation of dat a (including in respect of the third

party mineralized material) regarding the geology, grade and continuity of mineral deposits; the possibility that

results will not be consistent with the Company's expectations, as well as the other risks and uncertaint ies

applicable to mineral exploration and development activities and to the Company as set forth in the Company's

continuous disclosure filings filed under the Company's profile at www.sedar.com. There can be no assura nce

that any forward -looking information will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, the reader should not place any undue

reliance on forward -looking inform ation or statements. The Company undertakes no obligation to update

forward-looking information or statements, other than as required by applicable law.

Rosario Project

The decisions to commence production at the Rosario Mine , Cinco Estrellas Property and Membrillo Prospect

were not based on a feasibility study of mineral reserves demonstrating economic and technical viability, but

rather on a more preliminary estimate of inferred mineral resources. Accordingly, there is increased

uncertainty and economic a nd technical risks of failure associated with this production decision. Production

and economic variables may vary considerably, due to the absence of a complete and detailed site analysis

according to and in accordance with NI 43-101.

Veta Grande Project

The decision to commence production at Veta Grande Project was not based on a feasibility study on mineral

reserves demonstrating economic and technical viability. Accordingly, there is increased uncertainty and

economic and technical risks of failure ass ociated with this production decision. Production and economic

variables may vary considerably due to the absence of a complete and detailed site analysis according to and

in accordance with NI 43-101.