Santacruz Silver Reports Q1 2021 Production of 706,978 Silver Equivalent Ounces

Resource Estimates Production Results

TSX.V: SCZ

FSE: 1SZ

May 13, 2021

Santacruz Silver Reports Q1 2021 Production of 706,978 Silver Equivalent Ounces

Vancouver, B.C. – Santacruz Silver Mining Ltd. (TSX.V:SCZ) (the “Company” or “Santacruz”)

reports its operating results from the Zimapan Mine located in Zimapan, Hidalgo, Mexico and the

Rosario Project located in Charcas, San Luis Potosi , Mexico, for the first quarter 2021 (“Q1”). The

Company is not including production from the Veta Grande Project in this report as operations at

Veta Grande were suspended during Q1 2020.

Production Highlights:

• Silver equivalent ounces produced 706,978

• Silver head grades increase 9.4 % at Zimapan Mine as compared to Q1 and Q4 2020

• Increased tonnage throughput from Lomo del Toro zone of the Zimapan Mine from 4,000 during

January and February to 6,000 tonnes for the month of March

• New mining method introduced in late March at Rosario that is expected to significantly reduce

costs by less handling of waste material.

Carlos Silva, Santacruz’s COO stated, “ As we keep advancing our workings deeper into the higher -

grade Lomo del Toro manto and increase the tonnage mined from this zone, we are seeing a

corresponding increase in head grades at our Zimapan Mine. We are progressing well towards our

objective of reaching 15,000 tonnes per month of mill feed from this higher-grade area by the end of

the second quarter ”. Mr Silva continued; “We expect further efficiencies at our Rosario Project

during Q2 as a result of a revised mining plan which results in less waste material being handled.

These very encouraging improvements were unfortunately partially offset by an unstable power

supply from Mexico´s Comision Federal de Electricidad (Mexico´s power supply Company). The

unstable power supply impacted the mill throughput at both mines in February as motors for the ball

mills w ere damaged. The matter was resolved in early March but mill throughput was materially

reduced for eight days”.

COVID-19 Update

The Company continues to take all appropriate measures to prevent COVID -19 among the work

force and local communities and to monitor the effectiveness of these measures in mitigating any

potential impact on business activities. The Company's actions have been successful to date and

the pandemic has not had any material impact on the business.

CONSOLIDATED PRODUCTION RESULTS

2021 Q1 2020 Q4 2020 Q1

Material Processed (tonnes milled) 176,239 191,043 157,400

Silver eqv. ounce production 706,978 943,103 902,765

Silver production (ounces) 325,376 318,764 274,678

Gold production (ounces) 72 71 83

Lead production (tonnes) 945 970 965

Zinc production (tonnes) 2,285 2,838 2,674

Copper production (tonnes) 354 365 438

Average Head Grade (g/t Ag Eqv.) 176 221 241

Development (metres) 2,212 2,891 2,170

ZIMAPAN MINE PRODUCTION RESULTS

2021 Q1 2020 Q4 2020 Q1

Material Processed (tonnes milled) 156,433 171,313 139,903

Silver eqv. ounce production 646,085 858,362 829,514

Silver production (ounces) 294,099 277,154 245,344

Silver head grade (g/t) 85 77 77

Gold head grade (g/t) - - -

Lead head grade (%/t) 0.63 0.63 0.73

Zinc head grade (%/t) 1.99 2.25 2.41

Copper head grade (%/t) 0.31 0.32 0.43

Silver recovery (%) 69.0 65.5 71.2

Gold production (ounces) - - -

Lead production (tonnes) 892 900 913

Zinc production (tonnes) 2,067 2,620 2,443

Copper production (tonnes) 354 365 438

Average Head Grade (g/t Ag Eqv.) 182 228 250

Development (metres) 1,724 2,095 1,418

ROSARIO MINE PRODUCTION RESULTS

2021 Q1 2020 Q4 2020 Q1

Material Processed (tonnes milled) 19,806 19,730 17,497

Silver eqv. ounce production 60,893 84,741 73,251

Silver production (ounces) 31,277 41,610 29,334

Silver head grade (g/t) 61 74 63

Gold head grade (g/t) 0.19 0.18 0.22

Lead head grade (%/t) 0.34 0.40 0.36

Zinc head grade (%/t) 1.51 1.38 1.78

Copper head grade (%/t) - - -

Silver recovery (%) 80.3 88.3 82.4

Gold production (ounces) 59.4 61.6 68.7

Lead production (tonnes) 78.0 89.6 82.0

Zinc production (tonnes) 73.0 79.8 73.9

Copper production (tonnes) - - -

Average Head Grade (g/t Ag Eqv.) 72 71 84

Development (metres) 488 70 52

* In the above tables Ag Eq has been calculated as follows:

2021 Ag Eq was calculated using metal prices of: Ag $25.00/oz, Au $1,925/oz, Pb $0.85/lb, Zn $1.05/lb and Cu $3.00/lb.

2020 Ag Eq was calculated using metal prices of: Ag $17.85/oz, Au $1,480/oz, Pb $0.92/lb, Zn $1.09/lb and Cu $2.80/lb.

Silver Equivalent Comparative Production

As noted in the tables above, there is a significant reduction in silver equivalent ounces produced in

Q1 2021 as compare d to that produced in Q1 and Q4 2020. This negative change in production is

due in large part to th e metal prices used for this calculation in 2021 as compared to 2020. For

example, had the Company used the 2020 metal price deck for its silver equivalent production

calculation at the Zim apan Mine in Q1 2021, the reported silver equivalent ounces produc ed would

have been 868,750, an increase of 9.1% over the current reported balance. On a comparative basis

within any particular fiscal year or between periods in different fiscal years where the metal price

decks are relatively equivalent, this computatio n is useful for comparing production from one period

to another. When the price decks are not relatively equivalent, the usefulness of this production

indicator is diminished.

About Santacruz Silver Mining Ltd.

Santacruz is a Mexican focused silver company with two producing silver projects ( Zimapan and

Rosario) and two exploration properties, the La Pechuga property and Santa Gorgonia prospect.

The Company is managed by a technical team of professionals with proven track records in

developing, operating and discovering silver mines in Mexico. Our corporate objective is to become

a mid-tier silver producer.

‘signed’

Arturo Préstamo Elizondo,

Executive Chairman

For further information please contact:

Mars Investor Relations

Telephone: (778) 999 4653

[email protected]

Arturo Prestamo

Santacruz Silver Mining Ltd.

Email: [email protected]

Telephone: (528) 183 785707

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

Forward looking information

Certain statements contained in this news release constitute "forward -looking information" as such term is

used in applicable Canadian securities laws , including statements relating to production at the Zimapan Mine

and Rosario Project and the Company's plans to grow it. Forward-looking information is based on plans,

expectations and estimates of management at the date the information is provided and is subject to certain

factors and assumptions. In making the forward -looking statements included in this news release, the

Company has applied several material assumptions ., including, but not limited to, assumptions as the

Company's financial condition and development plans do not change as a result of unforeseen events, that the

Company will receive all required regulatory app rovals, and that future metal prices and the demand and

market outlook for metals will remain stable or improve. Forward -looking information is subject to a variety of

risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially

from those projected in such forward -looking information. Factors that could cause the forward -looking

information in this news release to change or to be inaccurate i nclude, but are not limited to, the risk that any

of the assump tions referred to above pro ve not to be valid or reliable; market conditions and volatility and

global economic conditions , including increased volatility and potentially negative capital raising conditions

resulting from the continued COVID -19 pandemic an d risks relating to the extent and duration of such

pandemic and its impact on global markets ; risk of delay and/or cessation in planned work or changes in the

Company's financial condition and development plans; risks associated with the interpretation of data

(including in respect of third party mineralized material) regarding the geology, grade and continuity of mineral

deposits; the uncertainty of the geology, grade and continuity of mineral deposits and the risk of unexpected

variations in mineral resources, grade and/or recovery rates; risks related to gold, silver, base metal and other

commodity price fluctuations; risks relating to environm ental regulation and liability; the possibility that results

will not be consistent with the Company's expectations, as well as the other risks and uncertainties applicable

to mineral exploration and development activities and to the Company as set forth i n the Company's

continuous disclosure filings filed under the Company's profile at www.sedar.com. There can be no assurance

that any forward-looking information will prove to be accurate, as actual results and future e vents could differ

materially from those anticipated in such statements. Accordingly, the reader should not place any undue

reliance on forward -looking information or statements. The Company undertakes no obligation to update

forward-looking information or statements, other than as required by applicable law.