Santacruz Silver Reports First Quarter 2018 Financial Results
TSX.V: SCZ
FSE: 1SZ
May 31, 2018
Santacruz Silver Reports First Quarter 2018 Financial Results
Vancouver, B.C. – Santacruz Silver Mining Ltd. (TSX.V:SCZ) (the “Company” or “Santacruz”) reports on
the operating and financial results from the Veta Grande Project in Zacatecas, Mexico and the Rosario Project
in San Luis Potosi, Mexico and for the first quarter of 2018. The full version of the financial statements and
accompanying management’s discussion and analysis can be viewed on the Company’s website at
www.santacruzsilver.com or on SEDAR at www.sedar.com. All amounts are in thousands of US dollars
unless otherwise indicated.
"As previously reported, in the first quarter management focus sed on mine development at Veta Grande in
order to put the framework in place for achieving targeted production during the third quarter of this year and
beyond," stated Arturo Préstamo, Presiden t and C hief Executive Officer of Santacruz. “Although this decision
will benefit the Company going forward the first quarter financial and operational results were negatively
impacted as the result was feeding the Veta Grande mill with low grade, oxide mat erial. Similarly, ongoing
development at the Membrillo Prospect resulted in a lower grade of millfeed to the Rosario mill. ” He
continued, “Importantly, the gross margin realized from the mining services contract with Carrizal largely offset
the mining operations loss during the quarter.”
Selected operating and financial information for the three-month periods ended March 31, 2018,
December 31, 2017 and March 31, 2017 is presented below:
2018 Q1 2017 Q4 2017 Q1
Financial
Revenue – Mining Operations 753 1,292 2,085
Revenue – Mining Services 2,413 3,580 -
Gross Loss (4) (117) (451) (1,059)
Impairment - (10,445) -
Net Income (Loss) (806) (10,012)) 1,490
Net Income (Loss) Per Share – Basic ($/share) 0.00 (0.06) 0.01
Adjusted EBITDA (4) (209) (1,435) (848)
Operating
Material Processed (tonnes milled) 48,068 30,974 45,474
Silver Equivalent Produced (ounces) (1) 154,175 139,670 223,968
Silver Equivalent Sold (payable ounces) (2) 59,648 94,204 163,457
Production Cost per Tonne (3) ($/t) 52.97 86.49 54.93
Cash Cost per Silver Equivalent ($/oz.) (3) 45.94 32.38 19.55
All-in Sustaining Cost per Silver Equivalent ($/oz.) (3) 55.84 38.53 24.56
Average Realized Silver Price per Ounce ($/oz.) (2) (5) 16.78 16.73 17.31
(1) Silver equivalent ounce s produced in 201 8 have been calculated using prices of US$1 7.00/oz., US$1, 295/oz., US$ 1.00/lb. and
US$1.35/lb. for silver, gold, lead and zinc respectively applied to the metal content of the lead and zinc concentrates produced by the
Company. Silver equivalent ounces produced in 2017 have been calculated using prices of US$16.00/oz., US$1,150/oz., US$1.00/lb.
and US$1.15/lb. for silver, gold, lead and zinc respectively applied to the metal content of the lead and zinc concentrates p roduced
by the Company.
(2) Silver equivalent sold ounces have been calculated using the realized silver prices stated in the table above, applied to the payable
metal content of the lead and zinc concentrates sold by the Company.
(3) The Company reports non -IFRS measures which include Production Cost per Tonne, Cash Cost per Silver Equivalent, All -in
Sustaining Cost per Silver Equivalent and Average Realized Silver Price per Ounce. These measures are widely used in the min ing
industry as a benchmark for performance, but do not have a standardized meaning and may differ from methods used by other
companies with similar descriptions.
(4) The Company reports additional non -IFRS measures which include Gross Profit (Loss) and Adjusted EBITDA. These additional
financial disclosure measures are intended to provide additional information.
(5) Average realized silver price per ounce is prior to all treatment, smelting and refining charges.
Financial Results
The Company realized an average silver price of $16.78 per ounce during Q1 2018 which is largely
unchanged from Q4 2017 and a 3% decrease as compared to Q1 2017.
The Company recorded a net loss of $ 806 in Q1 2018 compared to a net loss of $10,012 in Q4 2017 and net
income of $1,490 in Q1 2017. The Q1 2017 net income arose primarily from a non-cash change in fair value
of derivative liabilities of $3,308 that was recorded to other finance income . The Q4 2017 net loss arose
largely from an impairment charge of $10,445 that was recorded against the Rosario Project.
Revenues in Q1 2018 of $3 ,166 include mining operations of $753 (Q1 2017 - $2,085; Q4 2017 - $1,292) and
mining services of $2,413 (Q1 2017 - $nil; Q4 2017 - $3,580). Mining operations r evenues in Q 1 2018
decreased as a result of management’s decision to focus on mine development at both the Veta Grande and
Rosario Projects leading to lower grade mineralized material being sent for processing.
The Company recorded a gross loss from operations of $117 during Q1 2018 (Q1 2017 – loss of $1,059; Q4
2017 – loss of $451) . The losses recorded in Q1 2018 and Q4 2017 reflect the combined results of the
Company’s mining operations and mining services activities. During these periods the mining operations
resulted in gross losses of $2,129 and $1,474 for Q1 2018 and Q4 2017 respectively while mining services
resulted in gross profit of $2,012 and $856 for the same periods.
Operational Results and Costs
Cash cost per ounce for the quarter was $ 45.94 per payable ounce of silver sold, an increase of 135% from
$19.55 per ounce in Q1 2017 and an increase of 42% from $32.38 per ounce per ounce in Q4 2017. Cash
cost per ounce was higher primarily due to lower head grades in the quarter arising from management’s
decision to focus on mine development at both the Veta Grande and Rosario Projects le ading to lower grade
mineralized material being sent for processing . Cash costs at both projects are expected to decrease in Q3
2018 as higher grade material will be available for mining on a consistent basis at that time and production
throughput is also expected to increase.
All-in Sustaining Cost per ounce in the first quarter was $55.84 per payable ounce of silver sold, an increase of
127% from $24.56 per ounce in Q1 2017 and an increase of 45% from $38.53 per ounce per ounce in Q4
2017. The increases occurred for the same reasons as those relating to the cash cost per ounce increases
referenced above.
About Santacruz Silver Mining Ltd.
Santacruz is a Mexican focused silver company with two pr oducing silver projects ( Veta Grande Project and
Rosario Project) and two exploration properties (Minillas Property and Zacatecas Properties). The Company is
managed by a technical team of professionals with proven track records in developing, operating and
discovering silver mines in Mexico. Our corporate objective is to become a mid-tier silver producer.
‘signed’
Arturo Préstamo Elizondo,
President, Chief Executive Officer and Director
For further information please contact:
Arturo Prestamo
Santacruz Silver Mining Ltd.
Email: [email protected]
Telephone: (011) (52) 81 8378 5707
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward looking information
Certain statements contained in this news release constitute "forward -looking information" as such term is
used in applicable Canadian securities laws. Forward -looking information is bas ed on plans, expectations and
estimates of management at the date the information is provided and is subject to certain factors and
assumptions. In making the forward -looking statements included in this news release, the Company has
applied several materi al assumptions, that the Company's financial condition and development plans do not
change as a result of unforeseen events, that third party mineralized material to be milled by the Company will
have properties consistent with management's expectations, t hat the Company will receive all required
regulatory approvals, and that future metal prices and the demand and market outlook for metals will remain
stable or improve. Forward -looking information is subject to a variety of risks and uncertainties and oth er
factors that could cause plans, estimates and actual results to vary materially from those projected in such
forward-looking information. Factors that could cause the forward -looking information in this news release to
change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove
not to be valid or reliable, which could result in lower revenue, higher cost, or lower production levels; delays
and/or cessation in planned work; changes in the Company's f inancial condition and development plans;
delays in regulatory approval; risks associated with the interpretation of data (including in respect of the third
party mineralized material) regarding the geology, grade and continuity of mineral deposits; the po ssibility that
results will not be consistent with the Company's expectations, as well as the other risks and uncertainties
applicable to mineral exploration and development activities and to the Company as set forth in the Company's
continuous disclosure filings filed under the Company's profile at www.sedar.com. There can be no assurance
that any forward -looking information will prove to be accurate, as actual results and future events could differ
materially from tho se anticipated in such statements. Accordingly, the reader should not place any undue
reliance on forward -looking information or statements. The Company undertakes no obligation to update
forward-looking information or statements, other than as required by applicable law.
Rosario Project
The decisions to commence production at the Rosario Mine , Cinco Estrellas Property and Membrillo Prospect
were not based on a feasibility study of mineral reserves demonstrating economic and technical viability, but
rather on a more preliminary estimate of inferred mineral resources. Accordingly, there is increased
uncertainty and economic and technical risks of failure associated with this production decision. Production
and economic variables may vary considerably, due to the absence of a complete and detailed site analysis
according to and in accordance with NI 43-101.
Veta Grande Project
The decision to commence production at Veta Grande Project was not based on a feasibility study on mineral
reserves demonstrating econom ic and technical viability. Accordingly, there is increased uncertainty and
economic and technical risks of failure associated with this production decision. Production and economic
variables may vary considerably due to the absence of a complete and det ailed site analysis according to and
in accordance with NI 43-101.