Sunday, October 18, 2026
MiningNewsTerminal
Sunday, October 18, 2026 Admin

SCY.V ·

EMC Metals Files Independent Technical Report and Resource Estimate on Carlin Vanadium Project, Nevada

Resource Estimates Technical Reports (NI 43-101)

`

NEWS RELEASE  TSX: EMC  May 27, 2010  NR 10‐ 10  www.emcmetals.com

EMC Metals Files Independent Technical Report and Resource Estimate on   Carlin Vanadium Project, Nevada 

Vancouver, British Columbia, May 27, 2010 ‐ EMC Metals Corp. (TSX: EMC) (the “Company”) is pleased to announce that further to its press release of May 6, 2010, the Canadian National Instrument 43‐101 (NI 43‐101) independent technical report and resource estimate of the Carlin Vanadium Project has now been  filed  on  SEDAR  under  the  Company’s  profile.  The  technical  report  is  also  available  on  the Company’s website at www.emcmetals.com.

The Carlin Vanadium Project consists of 72 unpatented mineral claims covering   ~578  ha,  located  along the western flank of the Piñon Range within the headwaters of Cole Creek. The property is accessible year round via highway 278 and is located approximately 40 km south of Elko, Nevada, USA.

The technical report dated April 30, 2010, and titled “NI 43‐101 Technical Report on Resources, EMC Metals Corp., Carlin Vanadium Project. Carlin, Nevada”, was prepared by SRK Consulting US. The report outlines a NI 43‐101 compliant inferred resource of 25.4 million tonnes grading 0.515% V2O5 for a total of 289 million lbs of total contained V2O5,. See the table below.

Carlin Vanadium Project NI43-101 Resource Estimation
Stryhas (2010) of SRK Consulting
Resource CategoryResource CategoryCut-off V O (%) 2 5Total (tonnes)Grade V O (%) 2 5Contained V O 2 5 (lbs)Contained V O 2 5
(lbs)
Inferred 0.30 25,400,000 0.515 289,000,000

Notes: This resource estimation was prepared in compliance with the “Best Practices and Reporting Guidelines” set out by CIM  and  National  Instruments  43‐101.  It  was  taken  from  NI  43‐101  Technical  Report  on  Resources,  EMC  Metals  Corp.  Carlin  Vanadium  Project,  Carlin,  Nevada  written  by  Bart  Stryhas  from  SRK  Consulting  in  2010  for  EMC  Metals  Corp.  The  resource  estimation was calculated using a drillhole database, compiled by EMC Metals verified by SRK and, containing information from  152 drillholes totaling 11,135m (36,525ft). The drillhole depths range from approximately 6m (20ft) to 150m (500ft) with an  average of 73m (240ft). The resource estimation was made using an Inverse Distance Weighting Squared interpolation method  (ID2).  The  resource  is  confined  within  a  0.1%  V2O5  grade  shell  constructed  by  generating  cross‐section  polygon  outlines  at  nominal 200ft spacing. A weighted average density of 2.34g/cm3 was used for the mineralized lithologies. The resource was  estimated as short tons and then converted to metric tons for this press release. 

Technical information in this news release has been reviewed and approved by Gilles R. Dessureau, M.Sc. P.Geo, a Qualified Person for the purposes of NI 43‐101 and an employee of the Company.

About EMC Metals 

EMC Metals is focused on sustainable growth through the development and application of technology for  specialty  and  exotic  metal  projects.  Through  successful  business  developments,  EMC  intends  to utilize  its  in‐house  and  patented  technologies  to  further  its  efforts  in  maximizing  opportunities  in  a number  of  specialty  metals  including  the  Nyngan  Scandium  Joint  Venture  with  Jervois  Mining  Ltd.  of Melbourne,  Australia  while  also  planning  for  future  opportunities  from  its  Carlin  Vanadium  Project, Fostung Tungsten Project and Springer Tungsten Facility, which has a fully permitted 1,200 tpd milling facility.

For additional information please contact: 

EMC Metals Corp. 

Investor Relations: (604) 648‐4653 or [email protected].

No stock exchange, securities commission or other regulatory authority has approved or disapproved the  information  contained herein. This press release contains projections and forward‐looking information  that involve various risks and uncertainties regarding future events. Such forward‐looking information  can include without limitation statements based on current expectations involving a number of risks and  uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties  that could cause actual results and EMC’s plans and objectives to differ materially from those expressed  in the forward‐looking information. Actual results and future events could differ materially from those  anticipated in such information. These and all subsequent written and oral forward‐looking information  are  based  on  estimates  and  opinions  of  management  on  the  dates  they  are  made  and  are  expressly  qualified in their entirety by this notice. Except as required by law, EMC assumes no obligation to update  forward‐looking information should circumstances or management's estimates or opinions change.