Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SCOT.V ·

Scottie Resources Mobilizes Second Drill Rig and Extends Drill Program at Scottie GOLD Project IN B.c.

Exploration Programs

SCOTTIE RESOURCES MOBILIZES SECOND DRILL RIG AND EXTENDS DRILL

PROGRAM AT SCOTTIE GOLD PROJECT IN B.C.

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED

STATES.

Vancouver, BC – August 13, 2020 – Scottie Resources Corp. (“Scottie” or the “Company”) (TSXV:

SCOT) is pleased to announce the addition of a second drill rig on its 100% owned Scottie Gold

Project. The second drill rig will increase the amount of drilling by 40%, an additional 2,000 metres

to the follow up drill campaign. Scottie is now targeting a total of 7,000 metres of drilling during the

2020 summer field season.

President and CEO, Bradley Rourke commented “ With our strong financial position, favourable

market conditions and abundance of drill targets, we have decided to increase the metres drilled this

summer. The addition of a second drill rig allows us to test new prospective zones and improve the

cost efficiency of drilling additional metres given that all the infrastructure and personnel are already

in place.”

Scottie’s 2020 drill program will follow up on the Company’s successful drill campaign of the 2019

season, including intercepts of 7.44 g/t gold over 34.78 metres on the Blueberry vein, 11.72 g/t gold

over 10.95 metres on the past-producing Scottie Gold Mine M-zone, and 73.32 g/t gold over 4.38

metres on the Bend vein. In addition to the follow-up drilling, the Company will test other prospective

targets, including the newly discovery Domino Zone, which has a strike length of 700 metres and a

width of 200 metres, and returned grab samples of up to 536 g/t gold.

Scottie has completed a total of 2,220 metres in 10 diamond drill holes since the commencement of

drilling on July 9 th and are excitedly waiting for assay results. The drill results will be reported in

batches as they are received.

Thomas Mumford, Ph.D., P.Geo and VP Exploration of Scottie, a qualified person under National

Instrument 43-101, has reviewed the technical information contained in this news release on behalf

of the Company.

ABOUT SCOTTIE RESOURCES CORP.

Scottie owns a 100% interest in the high- grade, past -producing Scottie Gold Mine and Bow

properties and has the option to purchase a 100% interest in Summit Lake claims which are

contiguous with the Scottie Gold Mine property. Scottie also owns 100% interest in the Cambr ia

Project properties and the Sulu property. Scottie Resources holds 24,589 ha of mineral claims in the

Golden Triangle.

All of the Company’s properties are located in the area known as the Golden Triangle of British

Columbia which is among the world’s most prolific mineralized districts.

Further information on Scottie can be found on the Company’s website at

http://www.scottieresources.com and at www.sedar.com, or by contacting Bradley Rourke, President

and CEO at (250) 877-9902 or Rahim Lakha, Corporate Development at (416) 414-9954.

Forward Looking Statements

This news release may contain forward‐ looking statements. Forward looking statements are

statements that are not historical facts and are generally, but not always, identified by the words

“expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar

expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Although

the Company believes the expectations expressed in such forward‐looking statements are based on

reasonable assumptions, such statements are not guarantees of future performance and actual

results may differ materially from those in forward looking statements. For ward‐looking statements

are based on the beliefs, estimates and opinions of the Company’s management on the date such

statements were made. The Company expressly disclaims any intention or obligation to update or

revise any forward‐ looking statements whether as a result of new information, future events or

otherwise.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of TSX Venture Exchange) accepts responsibility for the adequacy of accuracy

of this release.