Scottie Resources Commences 2023 Drilling ON Blueberry Contact Zone
SCOTTIE RESOURCES COMMENCES 2023 DRILLING ON
BLUEBERRY CONTACT ZONE
VANCOUVER, BC
,
June 30, 2023
/CNW/ - Scottie Resources Corp. ("
Scottie
" or the "
Company
") (TSXV: SCOT) (OTCQB:
SCTSF) (FSE: SR8) is pleased to report that it has commenced its 2023 drill program on its high-grade Blueberry Contact Zone
target. The Blueberry Contact Zone is located 2 kilometres north-northeast of the 100% owned and royalty free, past-producing
high-grade
Scottie Gold Mine
, 35 kilometres north of the town of
Stewart, BC
, along the Granduc Road.
President and CEO,
Brad Rourke
commented: "We are up and running, with three drills now turning on the Blueberry
Contact Zone. Our 20,000 metre 2023 drill program is primarily focused on expansion of the structure, both at depth and
along strike, following up on the exceptional results of last year's program. With a strong early start to the season, we
expect to begin releasing results over the coming months and are excited to further define this high-grade, road accessible
gold system."
About the Blueberry Contact Zone
The Blueberry Zone is located just 2 kilometres northeast of the 100% owned, past-producing
Scottie Gold Mine
located in
British
Columbia, Canada's
Golden Triangle region. Historic trenching and channel sampling of the Blueberry Vein include results of 103.94
g/t gold over 1.43 metres, and 203.75 g/t gold over 1.90 metres. Despite high-grade surficial samples and easy road access, the
Blueberry Vein had only limited reported drilling prior to the Company's exploration work. The target was significantly advanced
during Scottie's 2019 drill program when an interval grading 7.44 g/t gold over 34.78 metres was intersected in a new splay off
zone of the main Blueberry Vein. The drill results received from 2020 - 2023, coupled with surficial mapping and sampling suggest
that this splay is in fact a major N-S mineralized structure, of which the Blueberry Vein was only a secondary structure. The zone
has a drilled strike length of 1,550 metres, is steeply dipping, and has been tested to 400 metres depth. The Blueberry Zone is
located on the Granduc Road, 20 kilometres north of the Ascot Resources' Premier Project, which is fully financed for construction.
Newcrest's Brucejack Mine is located 25 kilometres to the north.
Thomas Mumford
, Ph.D., P.Geo and VP Exploration of Scottie, a qualified person under National Instrument 43-101, has reviewed
the technical information contained in this news release on behalf of the Company.
ABOUT SCOTTIE RESOURCES CORP.
Scottie owns a 100% interest in the Scottie Gold Mine Property which includes the Blueberry Zone and the high-grade, past-
producing
Scottie Gold Mine
. Scottie also owns 100% interest in the Georgia Project which contains the high-grade past-producing
Georgia River Mine
, as well as the Cambria Project properties and the Sulu property. Altogether Scottie Resources holds
approximately 60,000 hectares of mineral claims in the Stewart Mining Camp in the Golden Triangle.
The Company's focus is on expanding the known mineralization around the past-producing mines while advancing near mine high-
grade gold targets, with the purpose of delivering a potential resource.
All of the Company's properties are located in the area known as the Golden Triangle of
British Columbia
which is among the
world's most prolific mineralized districts.
Forward Looking Statements
This news release may contain forward–looking statements. Forward looking statements are statements that are not historical
facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates",
"projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although
the Company believes the expectations expressed in such forward–looking statements are based on reasonable assumptions, such
statements are not guarantees of future performance and actual results may differ materially from those in forward looking
statements. Forward–looking statements are based on the beliefs, estimates and opinions of the Company's management on the
date such statements were made. The Company expressly disclaims any intention or obligation to update or revise any forward–
looking statements whether as a result of new information, future events or otherwise.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX
Venture Exchange) accepts responsibility for the adequacy of accuracy of this release.
View original content to download multimedia:
https://www.prnewswire.com/news-releases/scottie-resources-commences-2023-drilling-on-blueberry-contact-zone-301867812.html
SOURCE
Scottie Resources Corp.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/June2023/30/c1268.html
%SEDAR: 00031828E
For further information:
Brad Rourke, President and CEO, +1 250 877 9902, [email protected]; Gordon Robb,
Business Development, +1 250 217 2321, [email protected]
CO: Scottie Resources Corp.
CNW 07:30e 30-JUN-23