Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SCOT.V ·

Scottie Reports Broad and High-Grade Gold at the Blueberry Contact Zone 14.4 g/t Gold over 40.75 Metres and 42.5 g/t Gold over 4.40 Metres

Drill Results

Scottie Reports Broad and High-Grade Gold at

the Blueberry Contact Zone 14.4 g/t Gold over

40.75 Metres and 42.5 g/t Gold over 4.40

Metres

Vancouver, British Columbia--(Newsfile Corp. - February 25, 2026) - Scottie Resources Corp. (TSXV:

SCOT) (OTCQB: SCTSF) (FSE: SR80) ("

Scottie

" or the "

Company

") is pleased to report final assays

from its 2025 drilling of various zones within the Blueberry Contact Zone, at the Scottie Gold Mine

Project ("Scottie Gold Mine" or the "Project"). The road-accessible Project is located 35 kilometres north

of Stewart, BC, and is the subject of a newly released Preliminary Economic Assessment ("PEA")

entitled Scottie Gold Mine Project (Bird et al., October 28, 2025, Scottie Gold Mine Project, SEDAR+).

In 2025, Scottie completed its biggest drill season ever, drilling more than 27,300 metres across 126

holes. This included 17 specialized holes (2,300 metres) focused on ground stability and water studies

important steps as the project advances toward potential future mine development.

The program delivered the best gold intercept ever recorded on the property, including

30.1 grams per

tonne gold over 23.65 metres

(see September 8, 2025 news release).

Results from the season showed consistent high-grade gold throughout the project.

Highlights

44%

of holes hit more than 2 metres of

5+ g/t gold

30%

of holes hit more than 2 metres of

10+ g/t gold

25%

of holes hit more than 2 metres of

15+ g/t gold

20%

of holes hit more than 2 metres of

20+ g/t gold

11%

of holes hit more than 2 metres of

30+ g/t gold

In simple terms, nearly half of all holes drilled returned strong gold grades, and a meaningful number

returned exceptionally high grades.

"2025 was our most important drill season yet, not just because we drilled more metres than ever

before, but because of the quality and consistency of the gold we intersected," said Dr. Thomas

Mumford, President of Scottie Resources. "As we tightened up our drilling, we continued to see the

same strong gold zones repeat across multiple areas of the project. We are now finalizing our of

interpretation of the results and will outline our 2026 exploration plans in the coming weeks."

"With more than $26M in flow-through funds available, we are fully financed to undertake what will be

our most ambitious drill program to yet, as we advance the Scottie Mine Project towards completing a

Feasibility study in the first half of 2027."

Table 1: Highlight results from new drill assays (uncut) - Blueberry Contact Zone

Drill Hole

From

(m)

To

(m)

Width*

(m)

Gold

(g/t)

Silver

(g/t)

Sub Zone

SR25-381

60.00

64.40

4.40

42.5

6.36

Road

including

60.00

61.00

1.00

101.0

15.0

Road

246.80

259.00

12.20

4.91

0.82

BB Vein

including

246.80

248.80

2.00

26.5

5.00

BB Vein

SR25-475

193.80

204.80

11.00

7.57

50.0

Fifi

including

194.80

195.80

1.00

29.8

7.00

Fifi

212.80

213.80

1.00

58.4

18.0

Lemoffe

220.80

222.80

2.00

5.39

1.50

Lemoffe

232.80

233.80

1.00

5.65

3.00

Lemoffe

238.80

239.80

1.00

1.46

0.00

Lemoffe

246.80

251.80

5.00

2.64

3.40

Lemoffe

255.80

257.60

1.80

3.26

158.0

Lemoffe

282.20

284.20

2.00

3.14

0.00

Lemoffe

291.00

297.00

6.00

4.20

0.00

Lemoffe

SR25-476

82.00

84.00

2.00

1.58

0.00

Road

113.00

116.00

3.00

21.2

0.00

Road

180.50

181.50

1.00

26.9

4.00

BB Vein

231.90

234.00

2.10

1.23

0.00

BB Vein

240.00

246.00

6.00

24.9

2.00

BB Vein

296.00

300.00

4.00

6.13

0.75

BB Vein

SR25-477

234.00

236.00

2.00

1.15

3.00

BB Vein

SR25-479

71.00

84.50

13.50

4.10

0.96

Road

including

79.00

83.50

4.50

7.47

2.89

Road

110.00

112.00

2.00

6.36

0.00

Road

165.50

167.50

2.00

5.33

0.00

BB Vein

SR25-480

241.40

242.40

1.00

1.94

3.00

Lemoffe

256.00

257.00

1.00

2.23

9.00

Lemoffe

263.00

271.05

8.05

3.49

1.51

Lemoffe

294.00

295.05

1.05

7.16

6.00

Lemoffe

SR25-481

9.00

12.00

3.00

1.57

0.00

BB Vein

90.05

108.00

17.95

2.07

1.10

Fifi

including

90.05

92.05

2.00

8.49

2.50

Fifi

223.25

228.30

5.05

1.48

3.62

Fifi

245.00

251.00

6.00

2.38

6.33

Lemoffe

273.50

279.00

5.50

1.03

2.18

Lemoffe

283.00

284.00

1.00

2.32

2.00

Lemoffe

SR25-482

60.07

60.37

0.30

1.42

38.0

Fifi

72.00

80.00

8.00

8.05

4.82

Fifi

including

74.00

76.00

2.00

23.5

9.50

Fifi

163.11

168.50

5.39

7.57

5.19

Lemoffe

including

164.50

167.50

3.00

11.5

6.00

Lemoffe

SR25-483

108.20

109.25

1.05

4.69

0.00

Fifi

134.80

140.35

5.55

12.5

6.82

Fifi

including

134.80

137.00

2.20

23.7

25.0

Fifi

251.00

254.15

3.15

1.95

5.00

Fifi

260.25

301.00

40.75

14.4

5.90

Lemoffe

including

287.75

299.00

11.25

11.2

8.84

Lemoffe

and

including

260.25

271.40

11.15

39.7

39.7

Lemoffe

including

260.25

265.25

5.00

77.2

26.2

Lemoffe

including

261.25

262.25

1.00

265.0

80.0

Lemoffe

318.70

319.70

1.00

7.93

16.0

Lemoffe

SR25-484

183.75

192.55

8.80

6.71

15.5

Fifi

including

183.75

184.75

1.00

30.8

10.0

Fifi

201.25

209.00

7.75

4.93

10.1

Lemoffe

including

208.00

209.00

1.00

29.9

16.0

Lemoffe

SR25-485

48.00

49.00

1.00

1.09

0.00

BB Vein

112.60

119.00

6.40

3.12

1.25

Fifi

*True width of the intervals has not yet been established by drilling

Figure 1:

Segmented vertical long section of the Blueberry Contact Zone illustrating the distribution and

status of drilled targets from the 2025 season and highlights of reported results thus far, relative to

intercepts from previous drilling campaigns.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11118/285165_8cf0f02d94f66bdb_002full.jpg

This release constitutes the final results from Scottie Resources' 2025 drill campaign; all significant

intercepts have now been reported.

Figure 2:

Overview plan view map of the Blueberry Contact Zone, illustrating the locations of the

reported drill results, cross-sections (Figures 3 - 7), and the distribution of the modelled sulphide-rich

cross-structures (red).

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11118/285165_8cf0f02d94f66bdb_003full.jpg

Figure 3:

Cross-section displaying Blueberry Contact Zone intercepts from drill hole SR25-381.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11118/285165_8cf0f02d94f66bdb_004full.jpg

Figure 4:

Cross-section displaying Blueberry Contact Zone intercepts from drill holes SR25-475, -481,

and -483.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11118/285165_8cf0f02d94f66bdb_005full.jpg

Figure 5:

Cross-section displaying Blueberry Contact Zone intercepts from drill hole SR25-476.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11118/285165_8cf0f02d94f66bdb_006full.jpg

Figure 6:

Cross-section displaying Blueberry Contact Zone intercepts from drill hole SR25-479.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11118/285165_8cf0f02d94f66bdb_007full.jpg