High-Grade Drill Intercepts at Minto North West Zone and Ridgetop Zone Confirm the Potential of the Minto Copper-Gold-Silver System
+
High-Grade Drill Intercepts at Minto North West Zone and Ridgetop Zone Confirm
the Potential of the Minto Copper-Gold-Silver System
Highlights
• Results from the ongoing drilling program include the following high-grade intercepts:
o Minto North west zone: 4.96% Cu, 0.85 g/t Au, 18.67 g/t Ag over 9.9 m from 225.1 m, within a
broader zone of 2.34% Cu, 0.43 g/t Au and 8.69 g/t Ag over 24.0 m in drill hole 25SCM009, a 150 m
southern step out at the Minto North west zone
o Ridgetop zone: 1.46% Cu, 0.47 g/t Au, 4.04 g/t Ag over 14.7 m from 90.3 m within a zone of 1.02%
Cu, 0.37 g/t Au, 3.17 g/t Ag over 27.7 m in drill hole 25SCM006 and 2.20% Cu, 0.80 g/t Au, 4.52 g/t
Ag over 7.0 m from 108.0 within a zone of 1.36 % Cu, 0.5% g/t Au, 2.92 g/t Ag over 23 m in drill
hole 25SCM004 both testing an under drilled area within the Ridgetop zone
• As of December 19, 2025, 32,026 m of drilling, or 64% of the planned 50,000 m program, in 121 drill
holes has been completed including a total of 8,979 m at the Minto North west zone
Trade-Off Study and Metallurgical Testwork Program
• Hatch Ltd. and SRK Consulting (Canada) Inc. continue to advance design and engineering work in mine
planning and design, metallurgy, mineral processing, waste rock and tailings management, all working
directly with the Company and consultants representing the Selkirk First Nation
• Preliminary results from a metallurgical testwork program, with the aim of improving copper, gold, and
silver recoveries on the Ridgetop deposit and to determine the possibility to improve recoveries of
precious metals using gravity recovery, are positive
Annual General and Special Meeting
• Selkirk Copper Mines Inc. held its Annual General and Special Meeting (the “Meeting”) on December
17th, 2025 in Whitehorse, YK where shareholders approved all the matters of business before the
company
.
December 22, 2025 - Vancouver, BC and Pelly Crossing, YT – Selkirk Copper Mines Inc. (TSX-V: SCMI |
FRA:IO20) (“Selkirk Copper” or the “Company”) is pleased to provide a program update and announce new
assay results from the on going 50,000 m drill program. The drill program has paused for the holiday break with
the safe completion of 32,026 m across 121 drill holes which marks a 64% completion of the planned program.
New results have been received from nine drill holes, three from the Minto North west zone, and six from the
southern Ridgetop zone (Figure 1). Drilling continues to test the size and continuity of the high-grade Minto
North west zone and these results confirm the expansion of the mineralized zone by 150 m south of the
previously modelled zone . Drilling at the Ridgetop zone is testing a high-grade corridor within the open pit
resource. Drill holes 25SCM004 and 25SCM006 successfully intercepted similar grade and width to the
expected high-grade corridor.
M. Colin Joudrie, President & CEO, commented: “I am extremely pleased with results at the Minto North west
zone which confirms our view that this zone has significant growth potential, with high copper and gold grades
intersected over significant widths . In addition, the Trade-Off Study, including metallurgical testing , is
advancing on schedule and is benefitting from input from Selkirk First Nation’s consultants. I am particularly
encouraged by initial results from the Ridgetop geometallurgical testwork which is showing potential for
significant improvements in copper recovery from partially oxidized material compared to historic work. Lastly,
12046890v4
I am very pleased with support from shareholders that resulted in Selkirk Copper completing its planned reverse-
take-over and business amalgamation in October 2025, and the initiation of trading on the TSX Venture
Exchange of Selkirk Copper Mines Inc. (TSX-V:SCMI) in early November 2025.”
2025 Drill Program Update
Drilling of 32,026 m of the planned 50,000 m program has been completed safely meeting our environmental
and sustainability standards (Figure 1). Drilling is expected to resume mid-January 2026, with results continuing
to be released as assays are received and validated. Table 1 summarizes meters and holes drilled by zone.
The remaining program is focused on the Ridgetop, Copper Keel, Minto East, and Minto North zones (Figure
1), exploration following up on historical high-grade results between the Minto East and Minto North zones
referred to as the Inferno zone (Figure 2), testing greenfield targets north of the current infrastructure, and testing
newly interpreted regional structures coincident with geophysical anomalies. To date, 9,382 samples have been
prepared and shipped for analysis, with results to be released following completion of all QAQC reviews.
Figure 1: Plan view of the Minto Mine showing surface projections of mineralization zones (Ridgetop, Copper Keel, 118, Minto East
and Minto North), relative to 2025 drill collars (yellow circles).
12046890v4
Table 1: Drilling by Zone
Zone Holes
completed Meters drilled
Minto North 28 8,979
Ridgetop 58 11,911
Minto East 15 5,406
Copper Keel 7 1,990
118 13 3,740
Total 121 32,026
Figure 2: Global cross-section view looking west showing the five primary zones of mineralization: Ridgetop (yellow), 118 (blue),
Copper Keel (green), Minto East (purple), and Minto North (red). The section illustrates gently north-dipping mineralized zones over
approximately 3 km of strike length and down to approximately 550 m depth, which has hosted the majority of exploration activity within
a larger 7 km long property.
Drill Results
Minto North
Drilling at the Minto North west zone continues to demonstrate a high-grade, laterally continuous copper-gold-
silver system with strong geological consistency along strike. Drill hole 25SCM009, the most southerly step-
out completed to date, successfully extended the mineralized footprint by approximately 150 m to the south.
This zone remains open in the southern, eastern and northern directions (Figure 3).
Hole 25SCM009 intersected a broad >24 m mineralized interval beginning at 210.97 m, hosted within strongly
deformed assimilation zone (ASMZ) and migmatitic (MIGM) lithologies characterized by increasing foliation
intensity, magnetite alteration, and elevated sulphide content. Within this interval, a high-grade massive
sulphide zone dominated by bornite and chalcopyrite was intersected from 233.07 m to 234.00 m, returning
34.1% Cu, 2.03 g/t Au and 170 g/t Ag. This style of mineralization, including massive to semi-massive sulphide
textures and a high bornite -to-chalcopyrite ratio, is consistent with high-grade intervals previously reported in
12046890v4
drill holes 25SCM001 and 25SCM002.
Drill holes 25SCM007 and 25SCM014 provide additional confirmation that the overall mineralized and altered
system remains a thick and laterally extensive package. Hole 25SCM007 intersected a broad zone of altered
ASMZ and MIGM lithologies with elevated copper values from approximately 210 m to 251 m, representing a
>40 m thick package of deformed and altered host rock. In this drill hole, a significant intercept of 13.92 m from
237.00 m returned 0.51% Cu, 0.13 g/t Au and 2.17 g/t Ag, consistent with mineralization observed in
25SCM005 (see news release Dec 1, 2025). These results illustrate a gradual easterly transition from the high-
grade, bornite-rich core characteristic of the Minto North west zone into a broad chalcopyrite-dominant halo.
Drilling to date has successfully identified chalcopyrite and bornite extending over 208 m in strike length, nearly
doubling the 105-metre extent defined in the 2025 mineral resource estimate (MRE) model (Figure 3). For more
information on the 2025 MRE see Table 4.
Figure 3: Plan View of the Minto North west zone. Sulphide mineralization observed in drilling extends the N-S strike direction to 208
meters (dashed outline) compared to the previously modelled 105 meter strike length (red shaded shape).
Ridgetop
Drill holes 25SCM004, 006, 008, 010, 011 and 012 drilled at the Ridgetop zone targeted an under-drilled
portion of this open pit resource situated between the well-defined shallow western pit (to <150 m depth) and
a higher-grade, deeper zone to the east (Figure 4). This corridor has historically returned assays exceeding 2%
copper and represents a key area for improving geological confidence within the existing resource model.
Results from drill holes 25SCM004 and 006 successfully confirm ed the width and grade of this deep
mineralized zone, demonstrating continuity of copper -rich mineralization within ASMZ and migmatitic host
rocks. However, drilling also indicates that the Ridgetop zone is more structurally complex than previously
interpreted, with evidence for late -stage faulting and localized offsets disrupting portions of the mineralized
horizon.
12046890v4
These recent drill results are informing structural reinterpretation at Ridgetop which will be integrated into
updated geological and resource models to better constrain fault geometry and mineralization offsets. The
systematic collection of oriented drill core and the development of a robust structural model are critical for
improved geological modelling and better defined mine plans.
Figure 4: A) Simplified plan view of the 2025 MRE Ridgetop open pit with 2025 drilling highlighting two main areas of focus
including a high-grade corridor at depth and the expansion of drilling to the south. B) shows an inclined view of 2025 MRE open pit
and the 2025 completed drill traces. C) is a 150 m thick cross-section looking NW highlighting results received to date.
12046890v4
The location, azimuth, dip and depth of hole of this new drilling is summarized in Table 2 and significant
intervals is summarized in Table 3.
Table 2: Collar Locations and Header Information
Hole ID Easting Northing Azi Dip EOH Zones
25SCM004 385177 6943771 105 -63 255 Ridgetop
25SCM006 385177 6943771 131 -58 303 Ridgetop
25SCM007 384004 6945916 60 -80 405 Minto North
25SCM008
385177 6943771 135 -74 264 Ridgetop
25SCM009
384002 6945913 135 -70 450 Minto North
25SCM010
385177 6943771 180 -58 234 Ridgetop
25SCM011
385177 6943771 210 -70 234 Ridgetop
25SCM012
385175 6943772 190 -86 369 Ridgetop
25SCM014
384001 6945913 180 -70 399 Minto North
Table 3: Significant Interval Table
Hole ID From To Length
(m)
Cu % Au
g/t
Ag
g/t
CuEq % Lith Zone
25SCM004 108.0 131.0 23.0 1.36 0.50 2.92 1.75% ASMZ RT
Incl. 115.0 122.0 7.0 2.20 0.80 4.52 2.84% ASMZ
144.23 145.0 0.8 2.45 0.02 2.19 2.49% ASMZ
237.14 244.7 7.6 0.44 0.09 1.67 0.53% ASMZ
25SCM006 90.29 118.0 27.7 1.02 0.37 3.17 1.32% ASMZ RT
Incl. 90.29 105.0 14.7 1.46 0.47 4.04 1.85% ASMZ
220.0 224.11 4.1 1.00 0.22 3.28 1.19% ASMZ
235.7 237.54 1.84 4.38 0.71 34.78 5.21% ASMZ
25SCM007 237.0 250.92 13.9 0.51 0.13 2.17 0.63% ASMZ MN
25SCM008 111.0 116.0 5.0 0.59 0.24 2.20 0.79%
ASMZ RT
25SCM009 210.97 235.0 24.0 2.34 0.43 8.69 2.74% ASMZ MN
Incl. 225.09 235.0 9.9 4.96 0.85 18.67 2.37%
ASMZ
25SCM010 85.0 88.5 3.5 0.47 0.21 1.88 0.29% MIGT RT
25SCM011 123.0 131.0 8.0 0.35 0.05 0.66 0.39% MIGT RT
141.0 146.0 5.0 0.33 0.04 0.82 0.39% ASMZ
162.0 165.64 3.6 0.39 0.06 1.23 0.37% ASMZ
25SCM012 92.5 103.5 11.0 0.33 0.21 0.82 0.45% ASMZ RT
123.0 125.0 2.0 1.05 0.03 0.86 0.50% ASMZ
134.0 135.78 1.8 1.23 0.01 0.56 1.08% ASMZ
150.4 158.0 7.6 0.47 0.07 1.43 1.24% ASMZ
25SCM014 203.65 220.63 17.0 0.75 0.47 3.88 1.13% ASMZ MN
Incl. 211.68 217.6 5.9 1.33 1.07 7.62 2.19% ASMZ
At the Minto North zone, the flat laying to shallowly dipping nature of the mineralized zones suggest that true widths are typically >90% of the
reported drill intersection length. At Ridgetop, true widths are approximate 85-90% of reported drill intersection lengths.
12046890v4
ASMZ = Assimilation Zone; MIGT = Migmatite
RT = Ridgetop; MN = Minto North
NSI = No Significant Intervals
CuEq Calculation:
CuEq = ((Cu% × CuP × RCu × 2204.62)+(Au g/t ÷ 31.1035 × AuP × RAu) + (Ag g/t ÷ 31.1035 × AgP × RAg ))/(CuP × RCu × 2204.62)
Where:
CuP/AuP/AgP = US$ commodity prices of $4.25/lb Cu, $2500/oz Au, $29/oz Ag; R Cu = Cu Recovery = 98%; R Au = Au Recovery = 85%; R Ag= Ag
Recovery = 85%
Recoveries as estimated from historical mineral processing results.
Trade-Off Study and Metallurgical Testing Update
Engineering work on the Trade-Off study continues to progress well, with Hatch Ltd. and SRK Consulting
(Canada) Inc. advancing design and engineering work on all fronts including mine design, infrastructure,
processing, mine waste, tailings, water management and treatment, and economics. Importantly, this work is
being carried out in a collaborative manner with direct input from the Selkirk First Nation and their consultants
as well as Selkirk Copper’s senior team.
After a comprehensive review of previous operating data and historical metallurgical test work, the team
identified opportunities to increase metallurgical recoveries in Ridgetop zone mineralization as well as
opportunities to reduce power consumption in crushing, grinding, and milling of Minto-style mineralized
material. Three areas with potential upside being investigated are: i) improved energy efficiency in the mill by
increasing the primary grinding size; ii) additional processing options for material that has higher distribution
of copper present as copper oxide; and iii) further investigating gravity concentrate to increase gold recovery.
In November 2025, Selkirk Copper began Phase 1 of a metallurgical test program, with the primary aim of
better understanding Minto -style mineralization through a n integrated geometallurgical program aimed at
improving the mine’s production capabilities and metallurgical recoveries of partially oxidized mineralization.
The test work is being conducted at Blue Coast Research Ltd., located in Parksville, BC with input from Selkirk
Copper and its consultants, including Fuse Advisors Inc., and Hatch Ltd. Initial test work has started based on
existing core samples with plans for additional metallurgical test work based on materials from new drilling.
Eary indications from the test work are positive in all respects, specifically: i) initial results suggest coarsening
the primary grind size maintains high copper recover y and would have the potential to reduce power
consumption in milling; and ii) initial results from flotation tests are showing better copper recovery from
partially oxidized mineralized material than previously modeled, which has the potential to convert material
previously modeled as waste into potentially minable resources. Tests to assess gravity assisted recovery of
gold and silver are underway.
In 2026 the Company will further advance the geometallurgical test work program using core acquired from
the current drill program with the long -term goal of linking the geologic understanding of the mineralized
zones at Minto directly to their metallurgical behavior ideally resulting in improved recovery of copper, gold
and silver at lower cost.
12046890v4
QAQC Procedures and Data Validation
The Company is drilling NQ sized core. Following data collection, core is cut along the long axis, with half of
the core going to the lab for chemical analysis and the remaining half kept in sequence as record. The half core
samples are packaged with the corresponding sample tag id and sealed. All sampling is conducted by Selkirk
Copper Mines Inc. and subject to Company standard internal quality control and quality assurance (QAQC)
programs which include the insertion of certified reference material, coarse blank materials, and field duplicate
analysis, on top of the standard laboratory QAQC procedures to monitor contamination during preparation and
analytical accuracy and precision. QAQC insertion rates approximate 15% of all samples at set intervals. For
the 2025 program all samples were sent to ALS Laboratory’s prep laboratory in Whitehorse, YK, then shipped
to ALS Vancouver for gold fire assay and four -acid multi-element analysis. All s amples are prepared by
crushing rock to 70% passing 2mm screen, then splitting a 250g sub-sample using a riffle splitter before being
pulverized 85% passing 75 microns. Gold is analyzed by 30 g Fire Assay (Au-AA23) with atomic absorption
(AAS) analysis followed by gravimetric finish for overlimit results . Copper is analyzed by four-acid digest
(ME-ICP61) with inductivity couple d plasma – atomic emission spectro scopy (ICP-AES) finish. If Cu
overlimit results are triggered a second four-acid digest for high grade copper (Cu-OG62) is conducted. For
any samples where oxide copper minerals are identified, a sulphuric acid leach (Cu-AA05) analysis with AAS
finish is preformed. ALS Vancouver holds an ISO/IEC 17025 standard accreditation.
QAQC results are reviewed open receipt of results. Overall QAQC results show strong analytical performance
across Cu, Au, and Ag datasets. All control standards are within acceptable tolerance, with no significant
outliers or systematic bias observed.
Primary intervals are reported as drill core length, with true widths estimated to be approximately 90% of core
lengths, based on the sub-horizontal to shallow dipping nature of the modelled mineralized zones.
Mineral Resource Details
The following table (Table 4) summarizes the current Minto Mineral Resource:
Table 4: Global Mineral Resource Estimate for the Minto Project (Effective Date: April 7, 2025)
Type Cut Class ROM In Situ Grade Metal
(CDN$) Tonnage
(000)
NSR
(CDN$)
Cu
(%)
Au
(gpt)
Ag
(gpt)
Ox
Ratio
ASCu
(%)
Cu
(Mlbs)
Au
(Koz)
Ag
(Koz)
OP $30
Indicated 6,085 $89.11 0.897 0.274 2.9 0.15 0.163 120.3 53.7 560.4
Inferred 9,496 $73.71 0.702 0.162 2.4 0.07 0.057 146.9 49.3 738.4
UG $80
Indicated 6,504 $183.90 1.489 0.636 5.6 0.06 0.090 213.5 132.9 1,167.6
Inferred 14,162 $156.85 1.281 0.539 4.9 0.06 0.075 399.9 245.4 2,229.6
Total
Varies
as
Above
Indicated 12,588 $138.08 1.203 0.461 4.3 0.10 0.125 333.8 186.6 1,728.0
Inferred 23,658 $123.48 1.048 0.387 3.9 0.07 0.068 546.8 294.7 2,968.1
Notes
1. The MRE has been completed by Sue Bird of Moose Mountain Technical Services (MMTS).
2. Resources are reported using the 2014 CIM Definition Standards and were estimated using the 2019 CIM Best Practices Guidelines.
3. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
4. Metal prices of US$2000/oz Au, US$23/oz Ag, US$4.00lb Cu.
5. For the NSR calculations: a currency exchange rate of 0.72 US$ per $CA; 95% payable Cu, 88% payable Au and 70% payable Ag; offsite costs
(refining, transport and insurance) of US$256.18/dmt; royalties of 1.5% NSR.
6. Recoveries are as follows:
a. CuRec = 95.5%+1.07*Cu%-113*ASCu/TCu, with a maximum of 98%
b. AuRec = 20.99*Augpt + 62.01, with a maximum of 95%
c. AgRec = 69.4+1.9*Aggpt, with a maximum of 85%
7. These inputs result in the following NSR and CuEq equations:
NSR = CA$4.73*CuRec*Cu%*22.0462 + (CA$2400.60*AuRec*Augpt + CA$21.45*AgRec*Aggpt)/31.10348
CuEq = NSR/(Cu*CuRec*22.0462)