Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SCLT.V ·

Searchlight Resources Stakes Reef Lake Nickel Copper Project in Saskatchewan

Corporate Updates

September 14, 2020

Searchlight Resources Stakes

Reef Lake Nickel Copper Project

in Saskatchewan

• 27 historical drill holes totaling 3,103.7 meters

• Drill intersection of 0.37% Nickel over 37.8 meters from surface

o including 0.66% Ni and 0.28% Cu over 9.8 meters

• Drill intersection of 0.41% Nickel and 0.15% Cu over 28.7 meters

o Including 1.19% Ni and 0.37% Cu over 1.0 meter

o and including 1.10% Ni and 0.27% Cu over 4.7 meters

Vancouver, British Columbia, September 14, 2020, - Searchlight Resources Inc. (“Searchlight” or the

“Company”) (TSXV:SCLT, US:CNYCF) is pleased to announce the staking of the Reef Lake Nickel

Copper Project located approximately 150 kilometres north of La Ronge, Saskatchewan.

Searchlight has staked a 29.7 square kilometre claim covering the Reef Lake Nickel Copper target in

north central Saskatchewan, located less than 20 km from the all weather road at the Komis gold

deposit and approximately 5 km from the major power line from Island Falls Hydroelectric facility. The

staking is part of the Company’s systematic evaluation of exploration targets in Saskatchewan. In

1956 and 1957 a total of 27 drill holes were completed on the project, totaling 10,193 feet (3,103.7

meters) with selected drill results shown in the table below. Since the 1950’s drilling at Reef Lake, the

project has seen limited work including prospecting and an MMI survey in 2008.

“Reef Lake is another result of Searchlight’s exploration philosophy to continue researching past

exploration projects and potential geological targets throughout Saskatchewan and acquire by staking”

stated Stephen Wallace, PGeo President and CEO of Searchlight.

The Reef Lake nickel copper mineralization occurs as disseminated nickeliferous pyrrhotite,

chalcopyrite and minor pyrite throughout a Mafic-Ultramafic Intrusion that outcrops on surface over an

area of approximately 60 m x 150 m. Two 1956 drill holes were collared in surface mineralization

including the first hole (DDH#1) which resulted in 37.8 m averaging 0.37% Ni, including a 9.8m

interval assaying 0.66% Ni and 0.28% Cu. Drill DDH#5 also collared in mineralization averaged

0.43% Ni over 10.7m from surface.

Highlights from 1957 drilling includes DDH#12 with assays of 0.41% Ni and 0.15% Cu over 28.7 m

which includes 1.19 % Ni and 0.37% Cu over 1.0 m and 1.1% Ni and 0.27% Cu over 4.7 m .

Additionally, DDH#20 had assays of 0. 33% Ni and 0.1 8% Cu over 17.5 m which includes 0.55% Ni

and 0.25% Cu over 5.8 m.

In the northern portion of the claims a 2008 MMI sampling program was carried out along the strike of

the Nickel Lake pyroxenite sill and it identified anomalous Cu -Ni-Pd-Ag-Pb values over a strike length

of 2 km. This will be followed up by Searchlight. A review of the Government of Saskatchewan online

GeoAtlas shows that no historic airborne surveys have been filed for the Reef Lake area.

Drill Hole From To Length From To Length Cu% Ni%

Feet Feet Feet Meter Meter Meter

Reef DDH#1 0.0 124.0 124.0 0.0 37.8 37.8 NA 0.37

including 47.5 124.0 76.5 14.5 37.8 23.3 0.24 0.47

which includes 82.6 114.7 32.1 25.2 35.0 9.8 0.28 0.66

Reef DDH#2 88.1 173.3 85.2 26.8 52.8 26.0 NA 0.35

including 88.1 130.7 42.6 26.8 39.8 13.0 NA 0.40

including 88.1 93.3 5.2 26.8 28.4 1.6 NA 0.85

Reef DDH#5 0.0 35.0 35.0 0.0 10.7 10.7 NA 0.43

including 0.0 10.0 10.0 0.0 3.0 3.0 NA 0.66

Reef DDH#10 298.5 321.0 22.5 91.0 97.8 6.8 NA 0.25

Reef DDH#12 195.0 289.0 94.0 59.4 88.1 28.7 0.15 0.41

including 195.0 198.1 3.1 59.4 60.4 1.0 0.37 1.19

including 273.5 289.0 15.5 83.4 88.1 4.7 0.27 1.10

Reef DDH#20 637.5 695.0 57.5 194.3 211.8 17.5 0.18 0.33

including 656.0 675.0 19.0 199.9 205.7 5.8 0.25 0.55

The results presented are historical in nature and Searchlight has not undertaken any in dependent

investigation of the drilling nor has it in dependently analyzed the re sults of the previous exploration

work in order to verify the results. Searchlight considers these sample r esults relevant as the

Company uses historical reports and historic data as a guide to plan future exploration programs.

Data Sources

1) Saskatchewan Mineral Assessment Database File 74A08-0001: A Preliminary Geological Report on

the Reef Group, Reef Lake, Saskatchewan. By P.S. Friesen, December 4, 1956.

2) Saskatchewan Mineral Assessment Database File 74A08-0001: Diamond Drill Record, Hole s 1-22

Reef Lake, by P.S. Friesen.

2) Canadian Platinum Corp., Technical Report for NI 43-101 on the Reef Lake Nickel Property, Reef

Lake Area SK., Northern Mining District, Saskatchewan. Prepared by R. Daniel Studer P.Geo,

October 1, 2010.

Qualified Person

Stephen Wallace, P.Geo., is Searchlight's Qualified Person within the meaning of National Instrument

43-101 and has reviewed and approved the technical information contained in this news release.

About Searchlight Resources Inc.

Searchlight Resources Inc. (TSX.V:SCLT; US:CYNCF) is a Canadian mineral ex ploration and

development company focused o n Saskatchewan, Canada, which ranked as the top location for

mining investment in Canada by the F raser In stitute. Searchlight holds a significant land position

within the mineral rich Flin Flon - Snow Lake Greenstone Belt. The Company is currently advancing its

Bootleg Lake Project located in Saskatchewan less than 10 km from Flin Flon, Manitoba, h osting four

past producing high-grade gold mines and its English Bay high grade gold project located 10 km from

LaRonge, Saskatchewan.

On behalf of the Board of Directors,

“Stephen Wallace”

Stephen Wallace, President, CEO and Director

SEARCHLIGHT RESOURCES INC.

For further information, visit the Company’s website at www.searchlightresources.com or contact:

Searchlight Resources Inc.

Alf Stewart, VP Corporate Development

(604) 331-9326

[email protected]

Forward-Looking Statements

Information set forth in this news release contains forward -looking statements that are based on

assumptions as of the da te of this news releas e. These statements reflect management’s current

estimates, beliefs, intentions and expectations. They are not guarantees of future performance. The

Company cautions that all forward looking statements are inherently uncertain and tha t actual

performance m ay be affected by a number of material factors, many of which are beyond the

Company’s control. Such factors in clude, among other things: risks and uncertainties relating to the

Company’s limited operating history and the need to comp ly with environmental and governmental

regulations. Accordingly, actual and future events, conditions and results may differ materially from the

estimates, beliefs, intentions and expectations expressed or implied in the forward looking information.

Except as required under app licable securities legislation, the Company undertakes no obligation to

publicly update or revise forward-looking information.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT

TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS

RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.