Imperial Mining Receives Positive Results FOR the Preliminary Economic Assessment (PEA) FOR Crater Lake Project Highlights
IMPERIAL MINING RECEIVES POSITIVE RESULTS FOR THE
PRELIMINARY ECONOMIC ASSESSMENT (PEA) FOR CRATER LAKE
Project Highlights (all amounts are in CA$, unless otherwise stated):
• Gross metal revenue of the minerals produced from the operation total $15.2 billion over the life of the
operation.
• Gross earnings after-tax is $6.25 billion.
• The Project has a pre-tax net present value (NPV) of $2.97 billion and an after -tax NPV of $1.72 billion
(10% discount rate).
• Pre-tax internal rate of return (IRR) is 42.9% and an after-tax IRR of 32.8%.
• Annual Net revenues average $ 608.0 million from the sale of high -purity scandium oxide (Sc 2O3),
scandium-aluminum Master alloy (ScAl) and rare earth element (REE) hydroxide concentrate.
• The pre-tax capital payback is 2.5 years from the start of production.
• Total mined metal production over a minimum 25-year mining life based on the present resource base is
expected to be 110 t Sc2O3, 57,298 t of ScAl Master alloy and 23,578 t of REE hydroxide concentrate.
• The prices and market segments were based on estimates from comprehensive market studies by Ernst Young
for scandium and by Roskill Information Services for rare earths.
MONTREAL, QUEBEC – June 13, 202 2 – Imperial Mining Group Ltd. ("Imperial") (TSX
VENTURE: IPG; OTCQB: IMPNF ) is pleased to annou nce that it has received results of a positive
Preliminary Economic Assessment (PEA) for the Crater Lake TG Zone Scandium-Rare Earth Element (Sc-
REE) deposit from Imperial’s independent consultants, WSP Canada (“WSP”). The results show positive
cash-flow, strong Internal Rate of Return (IRR) and Net Present Value (NPV) metrics at discount rates of
up to 15% for a potential mining operation at the Crater Lake, Quebec (Table 1). The Crater Lake property
is in northeastern Québec, approximately 200 km east northeast of Schefferville, Québec (Figure 1).
Table 1 – Pre- and After-Tax Net Present Value (NPV) – Crater Lake, TG-Zone Deposit
Discount Rate Pre-Tax Net Present Value
(NPV) Million CA$
After-Tax Net Present Value
(NPV) Million CA$
@ 5%
@ 7%
@ 10%
@ 11%
@ 12%
@ 15%
$5,265
$4,145
$2,971
$2,675
$2,413
$1,794
$3,150
$2,455
$1,721
$1,535
$1,370
$977
Internal Rate of Return (IRR) 42.9% 32.8%
Payback from Production Startup 2.5 years 3.0 years
The salient metrics related to the PEA study of the TG North Lobe and the projected mining and processing
costs to produce Sc2O3, ScAl Master alloy and REE hydroxide concentrate are outlined in Table 2.
Table 2 – Project Metrics, Crater Lake TG North Lobe Deposit
Project Metric Units Value
Pre-tax NPV @ 10% $M 2,971
After-tax NPV @ 10% $M 1,721
Pre-tax IRR % (real) 42.9
After-tax IRR % (real) 32.8
Pre-tax Payback Period from start of production Years 2.5
Initial Direct Capital Expenditure (“CAPEX”) $M 602.9
Initial Indirect Capital Costs $M 108.8
Initial Project Contingency (25%) $M 159.2
Total Initial CAPEX (Direct + Indirect + Contingency) $M 870.9
Maximum Open-Pit Production Rate tpa 423,118
Maximum Concentrate Production Rate tpa 217,059
Mine Life (minimum) Years 25
Ramp-up to Full Production Years 2
Total Revenues $M 15,200
Average Annual Net Revenues $M 608
Total Operating Costs $M 3,727
Pre-tax Operating Cash Flow $M 10,309
After-tax Operating Cash Flow $M 6,259
Operating Margin % 63.8
Life-of-Mine Operating Cost Estimates Units Value
Open-Pit Mine, Mill and Transportation Operating Costs $/t mill feed 233
Hydrometallurgical Facility - Sc2O3 $/t mill feed 12
Master Alloy Facility - ScAl $/t mill feed 108
Selling, General & Administration (G&A) Costs $/t mill feed 8
Royalties (single payment buyout) $/t mill feed 0.20
Sustaining Capital Costs + Restoration $/t mill feed 20
Total Operating Costs $/t mill feed 381
Table 3 – Commodity Price Assumptions Used in the Financial Model
Metal Oxides / Alloy US$/kg Note
Scandium Oxide (Sc2O3) $1,500.00 USGS 5-year trailing average discounted by 61% 1
Al-2% Sc Master Alloy $204.00 USGS 5-year trailing average discounted by 40% 1
Dysprosium Oxide (Dy2O3) 2 $128.40 March 2022, Spot Prices, discounted by 70%
Lanthanum Oxide (La2O3) 2 $1.50 March 2022, Spot Prices, discounted by 70%
Neodymium Oxide (Nd2O3) 2 $49.20 March 2022, Spot Prices, discounted by 70%
Praseodymium Oxide (Pr2O3) 2 $49.20 March 2022, Spot Prices, discounted by 70%
Terbium Oxide (Tb4O7) 2 $584.40 March 2022, Spot Prices, discounted by 70%
Table 3 NOTES:
1 – Source: United States Geological Survey (USGS) 2021 Mineral Commodity Summary – Scandium and Scandium-Aluminum Master alloy.
2 - Only magnet REEs in the mixed REE product have accrued value, with prices discounted by 70% as project assumes REE sales as a mixed
bulk hydroxide product.
“The WSP study results confirm that the TG-Zone deposit has robust economics with the potential to be a
long-term provider of critical Scandium and magnet Rare Earths to world markets,” stated Peter J. Cashin,
President and Chief Executive Officer of Imperial. “We believe that the financial-model estimates used in
the PEA are conservative, as they apply discounted and historical average metal pricing. Project economics
improve substantially if current spot REE and ScAl Master alloy values are used. With rapidly accelerating
onshoring of Critical Minerals and Advanced Material supply chains we believe that this could position
Imperial advantageously to capture higher prices and thereby grow revenues. Our upcoming summer
exploration drilling of the Crater Lake project is intended to convert the Inferred Mineral Resources from
the TG North Lobe deposit reported in September 2021 to Indicated and, potentially, Measured Mineral
Resources. Work on the TG Southern Lobe, where drilling in 2019 returned 113.9 m grading 310 g/t
Sc2O3, is also planned with the prospect of linking the North and South Lobes of the deposit.”
WSP Canada General Project Description
The WSP study utilizes an open -pit mining operation model and a scandium price deemed conservative,
below the 20 21 USGS trailing five-year average price. Accepted consensus is that REE prices have
increased significantly since September 2021 and have been discounted by 70% for the purposes of this
study as REE will be delivered to a processor on a tolling basis for the magnet rare earth s only . The
commodity prices for this study and the assumptions used for the financial model are listed in Table 3. For
this study, the total tonnes of concentrate produced of Neodymium (Nd), Praseodymium (Pr), Dysprosium
(Dy) and Terbium (Tb) were considered marketable and contribute to revenues in the financial model as an
offset to Scandium (Sc) operating expenses.
WSP applied a conventional Truck and Shovel open -pit mining operation model to the TG North Lobe
Deposit at a production rate of 2,350 tonnes per day during a six-month per year operation period (Table 2,
Figure 2), using the $110.80 Net Smelter Return (NSR) cut-off presented in the Mineral Resource Estimate
previously reported by Imperial (Imperial Press Release, September 23, 2021).
The mine operation infra structure, storage and tailings facilities would be developed at Crater Lake. The
open-pit mine, crushing, milling, kilning and magnetic concentration plants w ould be built on -site, with
mineral concentrate transported during winter months to a storage in Emeril, NL by road to the twelve
months operational metallurgical and alloys plants to be located in Sept -Iles, Quebec by rail (Figure 3).
Existing road infrastructure will be accessed from the Crater Lake mine area via winter road for the initial
years of production as a means to reduce project CAPEX. Imperial has future plans to establish a permanent
road that would be financed from operating revenues.
Imperial expects to receive a copy of the final 43-101 PEA report from WSP within 45 days from the date
of this press release. The final PEA report, which is being prepared according to National Instrument 43-
101 Guidelines, will be filed on SEDAR and available under Imperial’s company profile at SEDAR.com
(Imperial Mining Group Ltd SEDAR Profile).
Project Optimization Opportunities
These PEA results have demonstrated the economic viability of the project and the project’s capability in
achieving high Sc and REE recoveries. However, there are still several process improvement opportunities
and infrastructure development options that will benefit the project.
Future project optimization programs and trade-off studies that are expected to yield further reduction in
CAPEX and/or OPEX include:
• Completion of the ongoing SGS hydrometallurgical program. The objective of this work is
to improve the scandium recovery, lower mine operating costs and reduce carbon footprint
of Imperial’s metallurgical process.
• Further investigation of sensor ore sorting as a pre-concentration step in mineral processing
to reduce ore milling cost.
• Development of the Al-2%Sc Master Alloy technology.
• Economic trade-off study focused on mineral concentrate transportation from the mine site
to the processing plant at Sept Iles evaluating simplification of the design of concentrate
storage, loading and unloading using silos.
• Converting winter road access to the property from the existing road infrastructure to a
permanent road to be financed from the operation revenues.
• Source electrical power from renewable sources at the Mine site (wind, solar, in-river hydro
power) to reduce energy costs and carbon emissions.
Crater Lake TG North Lobe Scandium-Rare Earth Resource Model
The PEA study was based on a Mineral Resource Estimate undertaken for Imperial by InnovExplo of Val
d’Or, Quebec (see Imperial Mining Press Release - SEP 23, 2021, Table 4, Figure 4).
The resources estimation was undertaken using the diamond drillhole data completed over the Northern
Lobe of the TG Scandium -Rare-Earth mineralized Zone. Mineralization is related to an iron -rich syenitic
intrusive (Ferrosyenite) sill and dyke system and w as drilled over a strike length of 300 m, to a vertical
depth of 200 m. Intersection lengths through the zone varied between 10.7 m and 111.9 m, representing a
true thickness of up to 100 m. There was an observed general increase in resource grade and true thickness
to mineralization at depth below the pit-shell and towards the north. The definition drilling was completed
over the northern half (Northern Lobe) of the magnetic target that defines the TG Zone. Drilling on a single
section (100N) on the south half of the TG target (Southern Lobe) returned 113.9 m grading 310 g/t Sc2O3
at a vertical depth of 90 m and is open to resource expansion in all directions (see Imperial Mining Press
Release: June 18, 2019). In addition, numerous Scandium-Rare-Earth resource opportunities remain to be
drill-defined on the property and will be evaluated in future exploration programs.
Table 4 – Crater Lake TG North Lobe Mineral Resource Estimate
Category
Cut-off
NSR
($/t)
Tonnage
(Mt)
NSR
total
($/t)
Sc2O3
(g/t)
Dy2O3
(g/t)
La2O3
(g/t)
Nd2O3
(g/t)
Pr2O3
(g/t)
Tb4O7
(g/t)
Indicated 110.8 7.3 413 282 66 606 596 160 12
Inferred 110.8 13.2 386 264 62 569 573 154 11
Mineral Resource Estimate Notes:
1. The independent and qualified persons for the mineral resource estimate, as defined by NI 43 101, are Marina Iund,
P.Geo. (Resource Geologist, InnovExplo), Paul Daigle, P.Geo. (Associate Resource Geologist, InnovExplo) and Carl
Pelletier, P.Geo. (Resource Geologist, InnovExplo). The effective date of the estimate is September 17, 2021.
2. These mineral resources are not mineral reserves, as they do not have demonstrated economic viability. Mineral
Resources are classified in accordance with the CIM (2014) Standards and Definitions of Mineral Resources.
3. The results are presented in-situ and undiluted and considered to have reasonable prospects of economic viability.
4. The estimate encompasses three mineralized zones using the grade of the adjacent material when assayed or a value
of zero when not assayed.
5. High-grade capping supported by statistical analysis was done on raw assay data before compositing and established
for La2O3 (3690 g/t), Pr2O3 (1380 g/t), Nd2O3 (2100 g/t), Dy2O3 (215 g/t). No capping was applied to Sc2O3 and Tb4O7.
6. The resource estimate was completed using GEOVIA Surpac 2021 using a sub-block model at a parent block matrix
of 5m x 5m x 5m (minimum block size of 1.25m x 1.25m x1.25m). Grade interpolation was ob tained by inverse
distance squared using hard boundaries.
7. Bulk density values applied are 3.13 t/m3 and 2.91 t/m3 for the olivine ferrosyenite and pyroxene ferrosyenite,
respectively; the principal hosts for the mineral resources.
8. The mineral resour ce estimate is classified as Indicated and Inferred. The Indicated mineral resource category is
defined with a minimum of three (3) drill holes within the areas where the drill spacing is less than 60 m and shows
reasonable geological and grade continuity. The Inferred category is defined with a minimum of two (2) drill holes
within the areas where the drill spacing is less than 120 m and shows reasonable geological and grade continuity.
Clipping boundaries were used for classification based on those criteria.
9. The mineral resource estimate is pit -constrained with a bedrock slope angle of 45° and an overburden slope angle
of 30°. It is reported at a Net Smelter Return (NSR) cut -off of CA$110.80/t. The NSR cut -off was calculated using
the following paramet ers: processing cost = CA$14.89/t; transportation cost (concentrate transportation from mine
site to processing plant): CA$17.01/t of ore milled; G&A = CA$7.19/t; refining and selling costs = CA$ 88.71/t; Sc2O3
price = US$1,500.00/kg; La2O3 price = US$0.60/kg; Pr2O3 price = US$29.00/kg; Nd2O3 price = US$29.00/kg; Tb4O7
price = US$386.00/kg; Dy 2O3 price = US$124.00/kg; USD:CAD exchange rate = 1.25; Scandium recovery to high
grade scandium oxide product = 76.0%; Rare earth elements recovery to mixed REE carbonate = 63.0%. The cut -off
grades should be re -evaluated considering future prevailing market conditions (metal prices, exchange rates, mining
costs etc.).
10. The number of metric tonnes was rounded to the nearest thousand, following the recommendations in NI 43 -101
and any discrepancies in the totals are due to rounding effects.
11. The authors are not aware of any known environmental, permitting, legal, title-related, taxation, socio-political, or
marketing issues, or any other relevant issue not reported in the Technical Report, that could materially affect the
Mineral Resource Estimate.
Financial and Sensitivity Analysis
The expected project cash flows were modelled using a simple discounted cashflow model, using discount
rates of 5%, 7%, 10%, 11%, 12% and 15%. Imperial is using at 10% discount rate as its base assumption.
The project cashflow is scheduled annually and uses an exchange rate of 1.25 CAD to USD.
A simple tax model was constructed using a depletion model for depreciation estimates. No opening balance
of tax credits, rebates, tax -free holidays or eligible prior expenditures were used in this analysis. Table 5
summarizes the estimated total Life-of-Mine (LOM) model design criteria.
Sensitivity analysis of the model indicates that the operation would be most sensitive to changes in metal
pricing and CAD:USD exchang e rate and least sensitive to changes in operating costs (Figure 5) . An
exchange rate of $1US = $1.25CAN was used in the study. Details of the WSP PEA financial model have
been posted on Imperial’s website home page at www.imperialmgp.com.
Metallurgical Process Development
Imperial has developed an innovative process for extraction of scandium (Sc) and rare earth elements (REE)
from its Crater Lake scandium mineralization as part of its Hydrometallurgical Developme nt Program.
Results from this work show very high recovery of both scandium and rare earths for all mineralization
types defined in diamond drilling on the property.
Table 5 – Crater Lake TG North Lobe Sc-REE Deposit Financial Model Design Criteria (all amounts
are in CA$, unless otherwise stated)
CATEGORY VALUE UNITS
MINING (includes a 5% dilution)
Mineralization Mined
Waste Mined
Overburden
TOTAL Mined (Strip Ratio = 2.01)
10.6
18.9
2.4
31.8
Mt
Mt
Mt
Mt
PROCESSING
Run-of-Mine Feed (Life-Of-Mine - LOM)
Run-of-Mine Feed (per year)
10.6
426,000
Mt
t
MINED MINERAL GRADE (includes a 5%
dilution)
Sc2O3
Dy2O3
La2O3
Nd2O3
Pr2O3
Tb4O7
268.3
62.4
583.0
567.0
152.8
11.1
g/t
g/t
g/t
g/t
g/t
g/t
MINERAL CONCENTRATES PRODUCED
Containing:
5.4 Mt
Sc2O3 2,559,592 kg
Dy2O3 429,172 kg
La2O3 4,008,593 kg
Nd2O3 3,898,455 kg
Pr2O3 1,050,318 kg
Tb4O7
76,499 kg
PRODUCT SOLD (LOM)
Sc2O3 (SOFC)*
Aluminum + 2% Sc - Master Alloy
110
57,298
t
t
Dy2O3 377 t
La2O3 3,521 t
Nd2O3 3,425 t
Pr2O3 923 t
Tb4O7
67 t
CATEGORY VALUE UNITS
METAL OXIDES PRICES
Sc2O3 1,875.00 $/kg
Aluminum + 2% Sc - Master Alloy 255.00 $/kg
Dy2O3 160.50 $/kg
La2O3 1.88 $/kg
Nd2O3 61.50 $/kg
Pr2O3
Tb4O7
61.50
730.50
$/kg
$/kg
GROSS METAL VALUES (LOM)
Sc2O3 (SOFC)*
205,896,000
CA$
Aluminum + 2% Sc - Master Alloy
14,610,979,000 CA$
Dy2O3 + La2O3 + Nd2O3 + Pr2O3 + Tb4O7
Concentrate
383,566,000 CA$
Total 15,200,441,000 CA$
Table 5 NOTES: * - represents Sc2O3 use in Solid Oxide Fuel Cells (SOFC).
The two-stage hydrometallurgical extraction method entails a high-pressure caustic leach (HPC) followed
by hydrochloric acid leach of the HPC residue. The new method showed remarkable recovery of scandium
and the rare earth elements from Imperial’s Crater Lake Sc-REE mineralization (see Imperial Mining press
release dated March 2, 2020, for details of the MET samples herein mentioned):
• The method showed scandium recovery to primary leach solution (PLS) of 84% for the
metallurgical sample.
• The recovery of total rare earth element, including yttrium (TREE+Y) of 84% from
the metallurgical sample.
• The high recoveries of Sc and TREE+Y from the sample show that the method has
excellent efficacy in extracting Sc and REE from samples representing the mineralization
observed in drilling.
• The NaOH and the hydrochloric acid used in the leaching process are regenerated and
recycled back to the process. Caustic is regenerated using lime, while HCl is recovered
with the addition on sulphuric acid.
• The scandium oxide would be converted into an Al-2%Sc master alloy product using co -
electrolysis of Al and Sc from alumina and scandia in a process similar to the Hall–Heroult
method used for the production of primary aluminum metal.
IPG recently commissioned a hydrometallurgical flowsheet development program based on its patent-
pending two-stage hydrometallurgical method for the extraction of scandium and rare earth elements
with SGS Canada. The program, wh ich started on January 31, 2022, is partially financed from a
$245,355 grant from the Quebec Ministry of Energy and Natural Resources (see Imperial Mining Press
Release - FEB 8, 2022). The optimization work by SGS Canada is advancing and has shown success
in improving the metallurgical processing method than was previously announced by Imperial for the
scandium-rare earth mineralization. The results of this program will be inputted into our final patent
submission to the US Patent Office by or before the end of 2022. The process flowsheet is currently
protected under US Patent and Trademark Office provisional application #63/265,176.
Table 6 represents the Capital and Operating costs for the envisaged mine and processing complex in the
PEA study.
Table 6 – Capital and Operating Costs Assumed in the PEA Study (all amounts are in CA $, unless
otherwise stated)
CAPITAL COSTS (Million $) $/t of milled
mineralization
Direct Costs
Mine Equipment 13.7 1.29
Mill Plant Construction 63.7 6.02
Hydrometallurgical Facility Construction 160.1 15.13
Power & Electrical Both CL and Sept-Iles Sites 14.1 1.33
Crater Lake and Sept-Iles Site Infrastructures 113.5 10.73
TSF & Water Management 69.3 6.55
Initial Winter Road + Orma Lake Road Rehabilitation 46.6 4.40
Off Site Concentrate Handling Infrastructure 27.5 2.60
Camp (200 Person Capacity) 26.5 2.50
Studies and Preliminary Engineering 0.0 0.00
Exploration and Geology Activities 0.0 0.00
Pre-Production Mining Licences 0.2 0.02
Pre-Production 67.9 6.42
SubTotal Direct Costs 602.9 57.00
Indirect Costs 108.8 10.28
Contingency (25%) 159.2 15.05
Total Capital Cost (All in + Tax) 870.9 82.33
OPERATING COSTS (Million $) $/t of milled
mineralization
Mine Crater Lake 248.5 23.49
Mill Crater Lake 430.9 40.73
Power Plant Crater Lake 36.0 3.40
Surface Mobile Equipment Crater Lake 27.5 2.60
Water Management Crater Lake 192.4 18.19
Lodging Crater Lake 140.1 13.25
Transportation + Domes 1,387.6 131.18
Hydromet Facility Sc2O3 Sept-Iles 58.5 5.53
Hydromet Facility Al + 2% Sc Master Alloy,Sept-Iles 1,139.8 107.75
Surface Mobile Equipment Sept-Iles 24.8 2.35
Water Management Sept-Iles 108.6 10.27
Capitalized Operating Costs -679.1 -6.42
Total Operating Cost 3,726.8 352.32