Imperial Mining Receives Highly Encouraging NI 43-101 Resource Estimate for the TG Scandium-Rare-Earth Zone: Remains Open to Further Expansion
Imperial Mining Receives Highly Encouraging NI 43-101 Resource
Estimate for the TG Scandium-Rare-Earth Zone: Remains Open to
Further Expansion
Highlights:
• Imperial’s independent qualified persons report Indicated Resources of 7.3 million tonnes grading 282 g/t Sc2O3 and
Inferred Resources of 13.2 million tonnes grading 262 g/t Sc2O3 for the Northern Lobe of the TG Scandium Zone.
• Determinations of magnet rare earth oxides (Nd, Pr, Dy, Tb) were made for both resource categories.
• Using a Net Smelter Return (NSR) cut -off value of $CAN110.80/t, the value of the mineralization was determined to
range between $CAN386-413/t.
• The dimensions of the zone above the NSR cut-off were 300 m in strike length to a vertical depth of 200 m.
• Mineralization remains open laterally and at depth , demonstrating the potential to increase the mineral resource with
additional drilling.
MONTREAL, QUEBEC – September 23, 2021 – Imperial Mining Group Ltd. ("Imperial") (TSX
VENTURE: IPG; OTCQB: IMPNF ) is pleased to announce that it has received the results of the
inaugural 43 -101 Mineral Resource Estimate for the TG Scandium -Rare-Earth Zone. The work was
completed by InnovExplo Inc. of Val d’Or, Quebec. The effective date of the Mineral Resource Estimate
is September 17, 2021. The full report will be released and filed within the next 45 days.
“We are extremely pleased by the results of the Resource Estimate for the Northern Lobe of the TG, which
far exceeded the minimum threshold resource we internally set for a 20-25-year notional mining operation,
or 10 million tonnes ,” said Peter Cashin, Imperial’s President & Chief Executive Officer. “ Particularly
important was that, due to our very tight drill pattern this past winter, our Independent QPs determined that
a significant percentage of the defined resources was classified as Indicated category. With these highly
favourable results in hand, we will soon commence work on a n NI 43-101 Preliminary Economic
Assessment (PEA) for the project.”
43-101 COMPLIANT RESOURCE ESTIMATE TABLE
Category
Cut-off
NSR
($/t)
Tonnage
(Mt)
NSR
total
($/t)
Sc2O3
(g/t)
Dy2O3
(g/t)
La2O3
(g/t)
Nd2O3
(g/t)
Pr2O3
(g/t)
Tb4O7
(g/t)
Indicated 110.8 7.3 413 282 66 606 596 160 12
Inferred 110.8 13.2 386 264 62 569 573 154 11
Mineral Resource Estimate Notes:
1. The independent and qualified persons for the mineral resource estimate, as defined by NI 43 101, are
Marina Iund, P.Geo. (Resource Geologist, InnovExplo), Paul Daigle, P.Geo. (Associate Resource
Geologist, InnovExplo) and Carl Pelletier, P.Geo. (Resource Geologist, InnovExplo). The effective date of
the estimate is September 17, 2021.
2. These mineral resources are not mineral reserves, as they do not have demonstrated economic viability.
Mineral Resources are classified in accordance with the CIM (2014) Standards and Definitions of Mineral
Resources.
3. The results are presented in-situ and undiluted and considered to have reasonable prospects of economic
viability.
4. The estimate encompasses three mineralized zones using the grade of the adjacent material when assayed
or a value of zero when not assayed.
5. High-grade capping supported by statistical analysis was done on raw assay data before compositing and
established for La 2O3 (3690 g/t), Pr 2O3 (1380 g/t), Nd 2O3 (2100 g/t), Dy 2O3 (215 g/t). No capping was
applied to Sc2O3 and Tb4O7.
6. The resource estimate was completed using GEOVIA Surpac 2021 using a sub-block model at a parent
block matrix of 5m x 5m x 5m (minimum block size of 1.25m x 1.25m x1.25m). Grade interpolation was
obtained by inverse distance squared using hard boundaries.
7. Bulk density values applied are 3.13 and 2.91 for the o livine ferrosyenite and pyroxene ferrosyenite,
respectively; the principal hosts for the mineral resources.
8. The mineral resource estimate is classified as indicated and inferred. The Indicated mineral resource
category is defined with a minimum of three (3) drill holes within the areas where the drill spacing is less
than 60 m and shows reasonable geological and grade continuity. The Inferred category is defined with a
minimum of two (2) drill holes within the areas where the drill spacing is less than 120 m and shows
reasonable geological and grade continuity. Clipping boundaries were used for classification based on those
criteria.
9. The mineral resource estimate is pit -constrained with a bedrock slope angle of 45° and an overburden
slope angle of 30°. It is reported at a Net Smelter Return (NSR) cut-off of CA$110.8/t. The NSR cut-off
was calculated using the following parameters: processing cost = CA$14.89 /t; transportation cost
(concentrate transportation from mine site to processing plant): CA$17.01 /t of ore milled ; G&A =
CA$7.19/t; refining and selling costs = CA$ 88.71 /t; Sc2O3 price = US$1,500.00/ kg; La2O3 price =
US$0.6/kg; Pr2O3 price = US$29/kg; Nd2O3 price = US$29/kg; Tb4O7 price = US$386/kg; Dy2O3 price =
US$124/kg; USD:CAD exchange rate = 1.25; Scandium recovery to high grade scandium oxide product =
76.0%; Rare earth elements recovery to mixed REE carbonate = 63.0%. The cut-off grades should be re -
evaluated considering future prevailing market conditions (metal prices, exchange rates, mining costs etc.).
10. The number of metric tonnes was rounded to the nearest thousand, following the recommendations in
NI 43-101 and any discrepancies in the totals are due to rounding effects.
11. The authors are not aware of any known environmental, permitting, legal, title-related, taxation, socio-
political, or marketing issues, or any other relevant issue not reported in the Technical Report, that could
materially affect the Mineral Resource Estimate.
DESCRIPTION OF THE TG ZONE
The resources estimation was undertaken using the diamond drillhole data completed over the Northern
Lobe of the TG Scandium-Rare-Earth mineralized Zone (Figure 1). Mineralization is related to an iron-rich
syenitic intrusive (Ferrosyenite) sill and dyke system and was drilled over a strike length of 300 m, to a
vertical depth of 2 00 m. Intersection lengths through the zone varied between 10.7 m and 111.9 m ,
representing a true thickness of up to 100 m. There was an observed general increase in resource grade and
true thickness to mineralization at depth below the pit -shell and towards the north. The definition drilling
was completed over the northern half (N orthern Lobe) of the magnetic target that defines the TG Zone.
Drilling on a single section (100N) on the south half of the TG target (Southern Lobe) returned 113.9 m
grading 310 g/t Sc2O3 at a vertical depth of 90 m and is open to resource expansion in all directions (see
Imperial Mining Press Release: June 18, 2019). In addition, n umerous Scandium -Rare-Earth resource
opportunities remain to be drill -defined on the property and will be evaluated in future exploration
programs.
The technical content in this press release was reviewed and certified by Pierre Guay, P. Geo., Imperial's
Vice-President, Exploration, a Geologist and Qualified Person as defined by NI43-101.
ABOUT IMPERIAL MINING GROUP LTD.
Imperial is a Canadian mineral exploration and development company focused on the advancement of its technology
metals projects in Québec. Imperial is publicly listed on the TSX Venture Exchange as “IPG” and on the OTCQB
Exchange as “IMPNF” and is led by an experienced team of mineral exploration and development professionals with
a strong track record of mineral deposit discovery in numerous metal commodities.
For further information please contact:
Peter J. Cashin
President and Chief Executive Officer
Phone: +1 (514) 360-0571
Email: [email protected]
CHF Capital Markets
Iryna Zheliasko, Manager-Corporate Communications
Phone: +1 (416) 868-1079 x229
Email: [email protected]
Website: www.imperialmgp.com Twitter: @imperial_mining Facebook: Imperial Mining Group
This press release may contain forward -looking statements relating to the Company’s operations or to its business environment.
Such statements are based on the Company’s operations, estimates, forecasts, and projections, but are not guarantees of future
performance and involve risks and uncertainties that are difficult to predict or control. Several factors could cause actual outcomes
and results to differ ma terially from those expressed. These factors include those set forth in the corporate filings. Although any
such forward-looking statements are based upon what management believes to be reasonable assumptions, the Company cannot
guarantee that actual resul ts will be consistent with these forward -looking statements. In addition, the Company disclaims any
intention or obligation to update or revise any forward -looking statements, for any reason. We also do not commit in any way to
guarantee that we will conti nue reporting on items or issues that arise. Investors are cautioned that this press release contains
quoted historical exploration results. These are derived from filed assessment reports and compiled from governmental databases.
The Company and a QP have not independently verified and make no representations as to the accuracy of historical exploration
results: these results should not be relied upon. Selected highlight results may not be indicative of average grades.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.
Figure 1 – Crater Lake Drillhole Location Map
Figure 2 – Pit-Shell Outline and Resource Blocks by Category, TG Zone, Looking East,
Crater Lake Project, Quebec
OPEN
OPEN
OPEN
Figure 3 –Pit-Shell Outline with Resource Blocks by NSR Value, TG Zone, Looking Southeast,
Crater Lake Project, Quebec