Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SCD.V ·

Imperial Mining Crater Lake Drilling Returns Wide Scandium and Rare Earth Intersections: Driving to Deliver 43-101 Resource Estimate by June

Drill Results

Imperial Mining Crater Lake Drilling Returns Wide Scandium and

Rare Earth Intersections: Driving to Deliver 43-101 Resource

Estimate by June

Highlights:

• Assay results from the first four drillhole continue to return impressive intercepts of 111.9 m (367.0’) grading

298 g/t scandium oxide (Sc 2O3), including 40.5 m (132.8’) grading 336 g/t Sc2O3 and 34.77 m (114.0')

grading 321 g/t Sc2O3.

• Elevated levels of total rare earth oxides plus yttrium (TREO+Y) of up to 0. 38 % characterize the

scandium-bearing horizon.

• At current prices for the magnet rare earths (Nd, Pr, Dy, Tb) the rare earth mineralization will provide the

project with important bulk concentrate value for the potential operation.

MONTREAL, QUEBEC – May 2 7, 2021 – Imperial Mining Group Ltd. ("Imperial") (TSX

VENTURE: IPG; OTCQB: IMPNF) is pleased to announce that it continues to receive strong scandium

and rare earth assays from Crater Lake drilling the TG scandium mineralized Zone (the “Zone”). Assay

results continue to return substantial intersection widths of scandium-bearing olivine ferrosyenite (Table

1) reported earlier (see Imperial press release – April 28, 2021). The drilling program was completed on

May 9th, with a total of 14 drillholes having tested the Zone. Sufficient drill data has now been collected

to undertake a 43-101 preliminary Resource Estimate of the TG zone for delivery in June.

“The winter drilling results at the Crater Lake property continue to build an important scandium and

TREO+Y resource at the TGZ target,” said Peter Cashin, Imperial’s President & Chief Executive Officer.

“Drilling has now defined the Zone on 50 m sections between Sections 350N and 650N and mineralization

has been traced by drilling over 6 50 m in total strike length down to a vertical depth of up to 200 m .

Importantly, the zone is getting thicker and higher grade with depth and to the north of Section 500N.”

CURRENT DRILLING

To date, 14 drillholes for 2,084.8 m have been completed (Table 2, Figures 1, 2 and 3). All drillholes have

intersected the target mafic intrusive host rock. The drilling indicates that the TG scandium zone is doubly

dipping between 830 west to 700 east, with a north-northeast strike direction. The widths of the mineralized

zone vary between 55 and 135 m (180 -443’) in true thickness. Mineralization is open at depth below the

200 m vertical level and along strike and appears as a thickening, conical-shaped body in cross-section.

Table 1 – Best Drillhole Assay Results, Crater Lake Project, Quebec

Hole # From (m) To (m) Interval (m) Sc (g/t) Sc2O3 (g/t)

TREO+Y

(%)

CL21044 46.85 132.33 85.48 177 271 0.3396

Incl. 75.64 98.23 22.59 202 310 0.3565

And 160.17 168.84 8.67 172 264 0.3590

CL21045 18.70 86.90 68.20 165 253 0.3141

Incl. 38.50 73.27 34.77 209 321 0.3744

CL21047 14.90 31.40 16.50 130 199 0.2684

And 36.85 61.48 24.63 129 198 0.2633

And 69.07 98.40 29.33 181 278 0.3310

Incl. 69.07 84.00 14.93 198 304 0.3455

CL21048 50.57 162.50 111.93 194 298 0.3547

Incl. 70.00 84.00 14.00 203 311 0.3707

And incl. 94.00 134.50 40.50 219 336 0.3785

NOTES: - 1 ppm of Sc metal equals 1.5338 ppm scandium oxide (Sc2O3) ; 1 g/t equals 1 ppm.

TREO+Y includes oxides of La, Ce, Pr, Nd, Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb and Lu plus Y.

SECTION 350N DRILLING

CL21050 – The hole intersected a cumulative thickness of 55.6 m of Sc-bearing mafic Olivine Ferrosyenite

(OLFESYN) intrusive with individual intersections of up to 20.0 m in core length.

SECTION 600N DRILLING

CL21052 - This hole intersected a cumulative 154.9 m (508.1’) of Sc-bearing OLFESYN commencing at

56.5 m in the hole. The azimuth of this hole was reversed from the other holes on Section to

confirm our initial inverted cone geometry of the zone. The largest intersection returned 142.5

m (467.4’) of OLFESYN, starting at 56.5 m in the hole. Of interest was 6.7 m thick interval

of pegmatite containing very coarse amphibole aggregates with several inclusions of zircon

and up to 10% of fluorite at the contact between the OLFESYN and the footwall felsic syenite.

The high fluorite commonly carries high rare earth grades elsewhere on the property.

SECTION 650N DRILLING

CL21051 - The hole intersected a cumulative thickness of 54.2 m (177.8’) interval of favourable OLFESYN

starting at 73.5 m in the hole.

CL21053 - The hole was a shallow overcut to hole CL21051 and intersected a cumulative interval of 19.3

m (63.3’) interval of favourable OLFESYN commencing at 22.2 m in the hole.

The mineralization on this Section has further confirmed that the system is building with depth and that the

mineralization has a steep northern plunge geometry.

The core samples from holes CL21046 and CL21049 to CL21053 have been sent out for analyses and have

been delivered to Activation Laboratories late last week. Results are anticipated to be delivered within three

weeks of receipt of this remaining shipment.

Table 2 – Borehole Location Table – Crater Lake Project, Quebec

Borehole

Number Section Easting Northing

Elevation

(m) Azimuth Dip

Length

(m)

CL21040 550N 440895 6133765 548 305 -47 117.0

CL21041 500N 440823 6133748 550 305 -45 50.3

CL21042 550N 440937 6133733 542 305 -50 213.9

CL21043 550N 440867 6133786 551 305 -47 69.9

CL21044 450N 440826 6133687 543 305 -47 186.8

CL21045 450N 440792 6133711 548 305 -45 108.0

CL21046 400N 440783 6133660 543 305 -47 190.0

CL21047 400N 440757 6133678 547 305 -45 126.0

CL21048 600N 440960 6133782 545 305 -47 208.0

CL21049 600N 440930 6133802 548 305 -45 133.8

CL21050 350N 440745 6133608 541 305 -47 151.0

CL21051 650N 440987 6133824 545 305 -47 182.9

CL21052 600N 440841 6133853 561 125 -55 229.0

CL21053 650N 440951 6133855 553 305 -47 118.2

Total 2084.8

* Borehole Coordinate Datum : NAD83 Zone 20N

QA-QC Protocol

Strict QA/QC protocols have been implemented for the Crater Lake Project, including the insertion of

certified reference materials (standards), duplicates and blanks at regular intervals throughout the sequence

of samples.

A total of 611 samples, including 36 QA-QC samples, were sent to an analytical laboratory. All sample

preparation and analytical work was carried out by Actlabs at their facilities in Ancaster, Ontario. Several

analytical techniques were used to characterize the samples, which are combined at Actlabs into the

analytical package “8 -REE”. This package includes whole -rock and trace element analytic techniques.

Whole Rock analyses are done via a lithium metaborate/tetraborate fusion inductively coupled plasma (ICP)

finish. Trace elements are also analyzed by fusion ICP/MS.

The technical content in this press release was prepared, reviewed and certified by Pierre Guay, P. Geo.,

Imperial's Vice-President, Exploration, a Geologist and Qualified Person as defined by NI43-101.

ABOUT IMPERIAL MINING GROUP LTD.

Imperial is a Canadian mineral exploration and development company focused on the advancement of its

technology metals projects in Québec. Imperial is publicly listed on the TSX Venture Exchange as “IPG”

and on the OTCQB Exchange as “IMPNF” and is led by an experienced team of mineral exploration and

development professionals with a strong track record of mineral deposit discovery in numerous metal

commodities.

For further information please contact:

Peter J. Cashin

President and Chief Executive Officer

Phone: +1 (514) 360-0571

Email: [email protected]

CHF Capital Markets

Iryna Zheliasko, Manager-Corporate Communications

Phone: +1 (416) 868-1079 x229

Email: [email protected]

Website: www.imperialmgp.com Twitter: @imperial_mining Facebook: Imperial Mining Group

This press release may contain forward -looking statements relating to the Company’s operations or to its business environment.

Such statements are based on the Company’s operations, estimates, forecasts, and projections, but are not guarantees of future

performance and involve risks and uncertainties that are difficult to predict or control. Several factors could cause actual outcomes

and results to differ ma terially from those expressed. These factors include those set forth in the corporate filings. Although any

such forward-looking statements are based upon what management believes to be reasonable assumptions, the Company cannot

guarantee that actual resul ts will be consistent with these forward -looking statements. In addition, the Company disclaims any

intention or obligation to update or revise any forward -looking statements, for any reason. We also do not commit in any way to

guarantee that we will conti nue reporting on items or issues that arise. Investors are cautioned that this press release contains

quoted historical exploration results. These are derived from filed assessment reports and compiled from governmental databases.

The Company and a QP have not independently verified and make no representations as to the accuracy of historical exploration

results: these results should not be relied upon. Selected highlight results may not be indicative of average grades.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Figure 1 – Crater Lake Drillhole Location Map

Figure 2 – Diamond Drill Cross-Section 450N, TG Zone, Crater Lake Project, Quebec

Figure 3 – Diamond Drill Cross-Section 600N, TG Zone, Crater Lake Project, Quebec