PRESS RELEASE 28 APRIL 2026

SERABI GOLD plc (“Serabi” or “the Company”)

SERABI GOLD PLC

The Long Barn, Cobham Park Road, Downside, Surrey KT11 3NE This document is not intended to and does

t +44 (0)20 7246 6830 e [email protected] www.serabigold.com not amount to an invitation or inducement to

Registered Office 66 Lincoln’s Inn Fields, London, WC2A 3LH Company Number 5131528 subscribe for shares in Serabi Gold plc

Results of Updated Mineral Resource and Reserves; Increases Consolidated M&I to

731koz Au and Inferred Resource to 653koz Au

Serabi Gold plc (“Serabi” or the “Company”) (AIM:SRB, TSX:SBI, OTCQX:SRBIF), the Brazilian focused gold

mining and development company, is pleased to announce updated Mineral Reserve estimates and Mineral

Resource estimates for its Palito Mine and updated Mineral Resource estimates for its Coringa Mine ,

prepared in accordance with the standard of CIM and Canadian National Instrument 43-101, with an effective

date of 3 1 January, 2026 as outlined below (all financial amounts are expressed in U.S. dollars unless

otherwise indicated).

HIGHLIGHTS

• Proven and Probable (“2P”) Reserves at Palito Complex totalling 228,400 ounces (1,153,800 tonnes at 6.2

g/t Au) compared to 147,000 ounces (646,000 tonnes @ 7.1 g/t Au) in April 2025.

• Consolidated Measured and Indicated (“M&I”) Resources of 730,800 ounces of contained gold (2,485,800

tonnes @ 9.1 g/t Au), a 29% increase compared to 567,400 ounces ( 2,047,900 tonnes @ 8.6 g/t) in March

2025 for Palito and April 2024 for Coringa.

• Consolidated Inferred Resources of 653,300 ounces (2,506,700 tonnes @ 8. 1 g/t Au), a 50 % increase

compared to 434,700 ounces (2,144,200 tonnes @ 6.3 g/t Au) in March 2025 for Palito and April 2024 for

Coringa.

• NCL Ingeniería y Construcción SpA of Santiago de Chile (“NCL”) is preparing these Mineral Resource and

Mineral Reserve estimation s together with a new 43- 101 Technical Report which is expected to be issued

within 45 days of the date of this release for each of Palito Complex and Coringa.

Mike Hodgson CEO commented:

“We are pleased to release these updated reserve estimates and resource estimates for Palito Mine and Coringa

Mine which incorporate the drill results of our 2025 brownfield exploration programme, which is part of Phase 2 of

our growth strategy of significantly increasing our resource after two years of ‘aggressive’ brownfield drilling. In only

our first year of Phase 2, we managed to increase our consolidated M&I to 731koz Au and consolidated inferred

resource to 653koz Au , up from consolidated M&I resource of 567koz Au and consolidated inferred resource of

435koz Au, which is approximately half-way to our growth target.

These resource and reserve updates demonstrate two findings, firstly our continued ability to once again replenish

the Palito geological resource, as well as to grow the reserve meaningfully in the process. Secondly, we see the

majority of our resource growth at Coringa. This is not surprising, Coringa is a new mine, with greater geological

continuity which in turn offers much upside potential. We expect more resource growth at Coringa during the 2026

brownfield exploration programme.

The healthy increase in our resource estimates confirms the prospectivity of our properties, which is now being

unlocked through exploration expenditure backed by our strong balance sheet and cash generation in comparison

to our capital constrained history of operation. We remain optimistic on what lies ahead in our 2026 brownfield

exploration programme and hope to, at the very least, match the success of our first year of Phase 2 drilling. As the

rainy season has subsided in Brazil, we have initiated the 2026 brownfield exploration programme which we plan to

provide an update on in Q2-2026.”

The Mineral Reserve estimate for Palito Mine was prepared by Mr Carlos Guzman of NCL Ingeniería y

Construcción SpA, who is a Qualified Person under the Canadian National Instrument 43- 101.

The Mineral Resource estimates for Palito Mine and Coringa Mine were prepared by Mr Carlos Guzman of NCL

Ingeniería y Construcción SpA, who is a Qualified Person under the Canadian National Instrument 43-101.

PRESS RELEASE 28 APRIL 2026

SERABI GOLD plc (“Serabi” or “the Company”)

SERABI GOLD PLC

The Long Barn, Cobham Park Road, Downside, Surrey KT11 3NE This document is not intended to and does

t +44 (0)20 7246 6830 e [email protected] www.serabigold.com not amount to an invitation or inducement to

Registered Office 66 Lincoln’s Inn Fields, London, WC2A 3LH Company Number 5131528 subscribe for shares in Serabi Gold plc

Mineral Reserve Estimates

The updated Mineral Reserve estimates for the Palito Mine and the São Chico Mine are based on data as at 31st

January 2026 and 31st July 2023, respectively.

Table 1: Palito Complex Mineral Reserve Statement as of January 31, 2026

Mineral Reserve Statement for the Palito Complex (Palito and São Chico Mines)

Palito São Chico Combined

Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained

(000’s) (g/t Au) (000’s oz) (000’s) (g/t Au) (000’s oz) (000’s) (g/t Au) (000’s oz)

Proven 607.1 6.6 128.9 46.1 8.2 12.2 653.2 6.7 141.1

Probable 485.4 5.4 83.8 14.1 7.7 3.5 499.5 5.4 87.3

Total Reserves 1,092.6 6.1 212.7 60.2 8.1 15.6 1,152.8 6.2 228.4

Notes to Palito Complex Mineral Reserve Estimates

1. Mineral Reserves have been rounded to reflect the relative accuracy of the estimates. Proven Mineral Reserves are reported within

the Measured classification domain, and Probable Mineral Reserves are reported within the Indicated classification domain.

2. Proven and Probable Mineral Reserves for Palito Mine are inclusive of external mining dilution and mining loss and are reported at a

COG of 3.19 g/t gold assuming an underground shrinkage mining scenario, a gold price of US$3,000/oz, a 5.5.0:1 Brazilian Real to

U.S. Dollar exchange rate, and metallurgical recoveries of 95%.

3. Proven and Probable Mineral Reserves for São Chico are inclusive of external mining dilution and mining loss and are reported at a

COG of 4.0 g/t gold assuming an underground shrinkage mining scenario, a gold price of US$1,800/oz, a 5.0:1 Brazilian Real to U.S.

Dollar exchange rate, and metallurgical recoveries of 93.8%. São Chico Mineral Reserves remain unchanged since November 2023

Technical Report, as no mining activities occurred since that date.

4. Serabi is the operator and owns 100% of the Palito Mine such that gross and net attributable mineral reserves are the same.

5. The mineral reserve estimate was prepared by the NCL in accordance with the standard of CIM and NI 43-101, with an effective date

of January 31, 2026, and audited and approved by Mr. Carlos Guzmán of NCL, who is a Qualified Person under NI 43-101.

6. Sã o Chico unchanged since July 31, 2023 Reserve Statement.

Mineral Resource Estimates

The updated Mineral Resource estimates for the Palito Mine and the São Chico Mine are based on data as at

31st January 2026 and 31st July 2023, respectively.

Table 2: Mineral Resource Statement, Palito Mine as of January 31, 2026

Classification

Tonnes Grade Contained

(000’s) (g/t Au) (000’s)

Measured 814.8 10.5 275.1

Indicated 459.8 7.7 113.5

Measured and Indicated 1,274.6 9.5 388.6

Inferred 743.8 6.5 156.6

Notes to Palito Mine Mineral Resource Statement

1. Mineral Resources are not Mineral Reserves and have not demonstrated economic viability.

2. Mineral Resources are reported inclusive of Mineral Reserves.

3. Figures are rounded to reflect the relative accuracy of the estimates.

4. Mineral Resources are reported within classification domains by RPEEE assuming underground scenario at a COG of 2.73,

considering a gold price of US$3,500/oz, metallurgical recovery of 95% and exchange rate of R$ 5.5/US$.

5. 3D block model used for Resources estimates.

6. The mineral resource estimate was prepared by the NCL in accordance with the standard of CIM and NI 43-101, with an effective

date of January 31, 2026, and audited and approved by Mr. Carlos Guzmán of NCL, who is a Qualified Person under NI 43-101.

7. S erabi is the operator and owns 100% of the Palito Mine such that gross and net attributable mineral resources are the same.

PRESS RELEASE 28 APRIL 2026

SERABI GOLD plc (“Serabi” or “the Company”)

SERABI GOLD PLC

The Long Barn, Cobham Park Road, Downside, Surrey KT11 3NE This document is not intended to and does

t +44 (0)20 7246 6830 e [email protected] www.serabigold.com not amount to an invitation or inducement to

Registered Office 66 Lincoln’s Inn Fields, London, WC2A 3LH Company Number 5131528 subscribe for shares in Serabi Gold plc

Table 3: Mineral Resource Statement, São Chico Mine as of July 31, 2023

Classification

Tonnes Grade Contained

(000’s) (g/t Au) (000’s)

Measured 122.5 8.1 31.9

Indicated 28.5 7.1 6.5

Measured and Indicated 150.9 7.9 38.4

Inferred 8.2 6.5 1.7

Notes to Mineral Resource Statement, São Chico Mine

1. Mineral Resources are not Mineral Reserves and have not demonstrated economic viability.

2. Mineral Resources are reported inclusive of Mineral Reserves.

3. Figures are rounded to reflect the relative accuracy of the estimates.

4. Mineral Resources are reported within classification domains with no dilution applied at a COG of 3.32 g/t gold assuming an

underground extraction scenario, a gold price of US$1,950/oz, metallurgical recovery of 95% and exchange rate of R$ 5.5/US$3D

block model used for Resource estimates.

5. 3D block model used for Resources estimates.

6. The mineral resource estimate was prepared by the NCL in accordance with the standard of CIM and NI 43-101, with an effective

date of January 31, 2026, and audited and approved by Mr. Carlos Guzmán of NCL, who is a Qualified Person under NI 43-101.

7. S erabi is the operator and owns 100% of the São Chico Mine such that gross and net attributable mineral resources are the same.

Table 4: Mineral Resource Statement, Palito Complex (Palito & Sao Chico Mines) as of January 31, 2026

Classification

Tonnes Grade Contained

(000’s) (g/t Au) (000’s)

Measured 937.7 10.2 307.0

Indicated 488.3 7.6 120.0

Measured and Indicated 1,425.5 9.3 427.0

Inferred 752.0 6.6 158.3

Notes to Mineral Resource Statement, Coringa Gold Mine

1. Mineral Resources are not Mineral Reserves and have not demonstrated economic viability.

2. Mineral Resources are reported inclusive of Mineral Reserves.

3. Figures are rounded to reflect the relative accuracy of the estimates.

4. Mineral Resources are reported within classification domains by RPEEE assuming underground scenario at a COG of 2.73,

considering a gold price of US$3,500/oz, metallurgical recovery of 95% and exchange rate of R$ 5.5/US$.

5. 3D block model used for Resources estimates.

6. Sao Chico unchanged since July 31, 2023 Resource Statement.

7. The mineral resource estimate was prepared by the NCL in accordance with the standard of CIM and NI 43-101, with an effective

date of January 31, 2026, and audited and approved by Mr. Carlos Guzmán of NCL, who is a Qualified Person under NI 43-101.

8. S erabi is the operator and owns 100% of the Palito Mine and São Chico Mine such that gross and net attributable mineral resources

are the same.

Table 5: Mineral Resource Statement, Coringa Mine as of January 31, 2026

Classification

Tonnes Grade Contained

(000’s) (g/t Au) (000’s)

Measured 358.2 11.2 129.4

Indicated 702.1 7.7 174.4

Measured and Indicated 1,060.3 8.9 303.8

Inferred 1,754.7 8.8 495.0

Notes to Mineral Resource Statement, Coringa Mine

1. Mineral Resources are not Mineral Reserves and have not demonstrated economic viability.

2. Mineral Resources are reported inclusive of Mineral Reserves.

3. Figures are rounded to reflect the relative accuracy of the estimates.

4. Mineral Resources are reported within classification domains by RPEEE assuming underground scenario at a COG of 1.94,

considering a gold price of US$3,500/oz, metallurgical recovery of 97% and exchange rate of R$ 5.5/US$.

5. 3D block model used for Resources estimates.

6. The mineral resource estimate was prepared by the NCL in accordance with the standard of CIM and NI 43-101, with an effective

date of January 31, 2026, and audited and approved by Mr. Carlos Guzmán of NCL, who is a Qualified Person under NI 43-101.

PRESS RELEASE 28 APRIL 2026

SERABI GOLD plc (“Serabi” or “the Company”)

SERABI GOLD PLC

The Long Barn, Cobham Park Road, Downside, Surrey KT11 3NE This document is not intended to and does

t +44 (0)20 7246 6830 e [email protected] www.serabigold.com not amount to an invitation or inducement to

Registered Office 66 Lincoln’s Inn Fields, London, WC2A 3LH Company Number 5131528 subscribe for shares in Serabi Gold plc

7. S erabi is the operator and owns 100% of the Coringa Mine such that gross and net attributable mineral resources are the same.

Table 6: Consolidated Mineral Resource Statement, Palito Complex, & Coringa Mine as of January 31, 2026

Classification

Tonnes Grade Contained

(000’s) (g/t Au) (000’s)

Measured 1,295.4 10.5 436.4

Indicated 1,190.4 7.7 294.4

Measured and Indicated 2,485.8 9.1 730.8

Inferred 2,506.7 8.1 653.3

Notes to Consolidated Mineral Resource Statement, Palito Complex & Coringa Gold Mine

1. The above table is a combination of tables 4 and 5 in this press release.

2. Mineral Resources are not Mineral Reserves and have not demonstrated economic viability.

3. Mineral Resources are reported inclusive of Mineral Reserves.

4. Figures are rounded to reflect the relative accuracy of the estimates.

5. 3D block model used for Resources estimates

6. The mineral resource estimate was prepared by the NCL in accordance with the standard of CIM and NI 43-101, with an effective

date of January 31, 2026, and audited and approved by Mr. Carlos Guzmán of NCL, who is a Qualified Person under NI 43-101.

7. S erabi is the operator and owns 100% of the Palito Mine, São Chico Mine and Coringa Mine such that gross and net attributable

mineral resources are the same.

Qualified Persons and Quality Control

The scientific and technical information contained in this news release pertaining to the Palito Mine has been

reviewed and approved by the following Qualified Persons under National Instrument 43- 101 – Standards of

Disclosure for Mineral Projects ("NI 43-101"):

• Carlos Guzman,RM CMC, FAusIMM, NCL Ingeniería y Construcción SpA

• Nicolas Fuster, RM CMC, MAusIMM, NCL Ingeniería y Construcción SpA

The Qualified Persons have verified the information disclosed herein, including the sampling, preparation, security

and analytical procedures underlying the information or opinions contained in this announcement in accordance with

standards appropriate to their qualifications.

The scientific and technical information contained in this news release pertaining to the Coringa Mine has been

reviewed and approved by the following Qualified Persons under National Instrument 43- 101 – Standards of

Disclosure for Mineral Projects ("NI 43-101"):

• Carlos Guzman,RM CMC, FAusIMM, NCL Ingeniería y Construcción SpA

• Nicolas Fuster, RM CMC, MAusIMM, NCL Ingeniería y Construcción SpA

The Qualified Persons have verified the information disclosed herein, including the sampling, preparation, security

and analytical procedures underlying the information or opinions contained in this announcement in accordance with

standards appropriate to their qualifications.

Technical Report

A Technical Report prepared by NCL Ingeniería y Construcción SpA. In accordance with NI 43- 101 will be filed on

SEDAR (www.sedar.com) within 45 days of this release as well as on the Company’s website

About Serabi Gold plc

Serabi Gold plc is a gold exploration, development and production company focused on the prolific Tapaj ós region

in Para State, northern Brazil. The Company has consistently produced 30,000 to 40,000 ounces per year with the

Palito Complex and is planning to double production in the coming years with the construction of the Coringa Gold

PRESS RELEASE 28 APRIL 2026

SERABI GOLD plc (“Serabi” or “the Company”)

SERABI GOLD PLC

The Long Barn, Cobham Park Road, Downside, Surrey KT11 3NE This document is not intended to and does

t +44 (0)20 7246 6830 e [email protected] www.serabigold.com not amount to an invitation or inducement to

Registered Office 66 Lincoln’s Inn Fields, London, WC2A 3LH Company Number 5131528 subscribe for shares in Serabi Gold plc

project. Serabi Gold plc recently made a copper-gold porphyry discovery on its extensive exploration licence. The

Company is headquartered in the United Kingdom with a secondary office in Toronto, Ontario, Canada.

The information contained within this announcement is deemed by the Company to constitute inside information as

stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of

the European Union (Withdrawal) Act 2018.

The person who arranged for the release of this announcement on behalf of the Company was Andrew Khov , Vice

President, Investor Relations & Business Development.

Enquiries

SERABI GOLD plc

Michael Hodgson t +44 (0)20 7246 6830

Chief Executive m +44 (0)7799 473621

Andrew Khov m +1 647 885 4874

Vice President, Investor Relations &

Business Development

e [email protected]

www.serabigold.com

BEAUMONT CORNISH Limited

Nominated Adviser & Financial Adviser

Roland Cornish / Michael Cornish t +44 (0)20 7628 3396

PEEL HUNT LLP

Joint UK Broker

Ross Allister / Georgia Langoulant t +44 (0)20 7418 9000

TAMESIS PARTNERS LLP

Joint UK Broker

Charlie Bendon/ Richard Greenfield t +44 (0)20 3882 2868

CAMARCO

Financial PR - Europe

Gordon Poole / Fergus Young t +44 (0)20 3757 4980

Assay Results

Assay results reported within this release include those provided by the Company's own

on-site laboratory facilities at Palito and have not yet been independently verified. Serabi

closely monitors the performance of its own facility against results from independent

laboratory analysis for quality control purpose. As a matter of normal practice, the

Company sends duplicate samples derived from a variety of the Company's activities to

accredited laboratory facilities for independent verification. Since mid-2019, over 10,000

exploration drill core samples have been assayed at both the Palito laboratory and certified

external laboratory, in most cases the ALS laboratory in Belo Horizonte, Brazil. When

comparing significant assays with grades exceeding 1 g/t gold, comparison between Palito

versus external results record an average over-estimation by the Palito laboratory of 6.7%

over this period. Based on the results of this work, the Company's management are

satisfied that the Company's own facility shows sufficiently good correlation with

independent laboratory facilities for exploration drill samples. The Company would expect

that in the preparation of any future independent Reserve/Resource statement undertaken

in compliance with a recognized standard, the independent authors of such a statement

would not use Palito assay results without sufficient duplicates from an appropriately

certificated laboratory.

Forward-looking statements

Certain statements in this announcement are, or may be deemed to be, forward looking

statements. Forward looking statements are identified by their use of terms and phrases

such as ‘‘believe’’, ‘‘could’’, “should” ‘‘envisage’’, ‘‘estimate’’, ‘‘intend’’, ‘‘may’’, ‘‘plan’’, ‘‘will’’

or the negative of those, variations or comparable expressions, including references to

assumptions. These forward-looking statements are not based on historical facts but

rather on the Directors’ current expectations and assumptions regarding the Company’s

future growth, results of operations, performance, future capital and other expenditures

(including the amount, nature and sources of funding thereof), competitive advantages,

business prospects and opportunities. Such forward looking statements reflect the

Directors’ current beliefs and assumptions and are based on information currently

available to the Directors. Several factors could cause actual results to differ materially

from the results discussed in the forward-looking statements including risks associated

with vulnerability to general economic and business conditions, competition, environmental

and other regulatory changes, actions by governmental authorities, the availability of

capital markets, reliance on key personnel, uninsured and underinsured losses and other

factors, many of which are beyond the control of the Company. Although any forward-

looking statements contained in this announcement are based upon what the Directors

believe to be reasonable assumptions, the Company cannot assure investors that actual

results will be consistent with such forward looking statements.

Qualified Persons Statement

The scientific and technical information contained within this announcement has been

reviewed and approved by Michael Hodgson, a Director of the Company. Mr Hodgson is

an Economic Geologist by training with over 30 years' experience in the mining industry.

He holds a BSc (Hons) Geology, University of London, a MSc Mining Geology, University

of Leicester and is a Fellow of the Institute of Materials, Minerals and Mining and a

Chartered Engineer of the Engineering Council of UK, recognizing him as both a Qualified

Person for the purposes of Canadian National Instrument 43-101 and by the AIM

Guidance Note on Mining and Oil & Gas Companies dated June 2009.

Notice

Beaumont Cornish Limited, which is authorised and regulated in the United Kingdom by

the Financial Conduct Authority, is acting as nominated adviser to the Company in relation

to the matters referred herein. Beaumont Cornish Limited is acting exclusively for the

Company and for no one else in relation to the matters described in this announcement

and is not advising any other person and accordingly will not be responsible to anyone

other than the Company for providing the protections afforded to clients of Beaumont

Cornish Limited, or for providing advice in relation to the contents of this announcement or

any matter referred to in it.

Neither the Toronto Stock Exchange, nor any other securities regulatory authority, has

approved or disapproved of the contents of this news release

See www.serabigold.com for more information and follow us on X @Serabi_Gold

PRESS RELEASE 28 APRIL 2026

SERABI GOLD plc (“Serabi” or “the Company”)

SERABI GOLD PLC

The Long Barn, Cobham Park Road, Downside, Surrey KT11 3NE This document is not intended to and does

t +44 (0)20 7246 6830 e [email protected] www.serabigold.com not amount to an invitation or inducement to

Registered Office 66 Lincoln’s Inn Fields, London, WC2A 3LH Company Number 5131528 subscribe for shares in Serabi Gold plc

APPENDIX

Mineral Reserves and Resources

The Company estimates and discloses mineral reserves and resources using the definitions adopted by the Canadian Institute of

Mining, Metallurgy and Petroleum, and in accordance with NI 43-101. Further details are available at www.cim.org. See the

“Glossary of Geological and Mining Terms” for complete definitions of mineral reserves and mineral resources.

About Mineral Resources

Mineral resources are not mineral reserves and do not have demonstrated economic viability but do have reasonable prospect

for economic extraction. They fall into three categories: measured, indicated, and inferred. The reported mineral resources are

stated inclusive of mineral reserves. Measured and indicated mineral resources are sufficiently well -defined to allow geological

and grade continuity to be reasonably assumed and permit the application of technical and economic parameters in assessing

the economic viability of the mineral resource. Inferred mineral resources are estimated on limited information not sufficient to

verify geological and grade continuity or to allow technical and economic parameters to be applied. Inferred mineral resource s

are too speculative geologically to have economic considerations applied to them. There is no certainty that mineral resources of

any category will be upgraded to mineral reserves.

Important Information about Mineral Reserve and Resource Estimates

Whilst the Company takes all reasonable care in the preparation and verification of the mineral reserve and resource figures, the

figures are estimates based in part on forward-looking information. Estimates are based on management’s knowledge, mining

experience, analysis of drilling results, the quality of available data and management’s best judgment. They are, however,

imprecise by nature, may change over time, and include many variables and assumptions including geological interpretation,

commodity prices and currency exchange rates, recovery rates, and operating and capital costs. There is no assurance that the

indicated levels of metal will be produced, and the Company may have to re-estimate the mineral reserves based on actual

production experience. Changes in the metal price, production costs or recovery rates could make it unprofitable to operate or

develop a particular deposit for a period of time.

A comparison of the updated Mineral Reserve Estimates as at 31 January 2026 with the previously reported Mineral Reserve

Estimates as at 31 March 2025 published on 10 September 2025 is set out below.

Comparison of Mineral Reserves for the Palito Mine, Para, Brazil

31 January 2026 30 March 2025

Tonnes Grade Contained Tonnes Grade Contained

(000’s) (g/t Au) (000’s oz) (000’s) (g/t Au) (000’s oz)

Proven 607 6.6 129 422 7.7 104

Probable 485 5.4 84 224 6.0 43

Proven & Probable Reserves 1,093 6.1 213 646 7.1 147

A comparison of the updated Mineral Resource Estimates as at 31 January 2026 with the previously reported Mineral Resource

Estimates as at 30 March 2025 published on 10 September 2025 is set out below.

Comparison of Mineral Resources for the Palito Mine, Para, Brazil

31 January 2026 30 March 2025

Tonnes Grade Contained Tonnes Grade Contained

(000’s) (g/t Au) (000’s oz) (000’s) (g/t Au) (000’s oz)

Measured Resources 815 10.5 275 769 10.8 267

Indicated Resources 460 7.7 114 333 7.7 83

Measured & Indicated Resources 1,275 9.5 389 1,102 9.9 350

Inferred Resources 744 6.5 157 682 7.4 162

PRESS RELEASE 28 APRIL 2026

SERABI GOLD plc (“Serabi” or “the Company”)

SERABI GOLD PLC

The Long Barn, Cobham Park Road, Downside, Surrey KT11 3NE This document is not intended to and does

t +44 (0)20 7246 6830 e [email protected] www.serabigold.com not amount to an invitation or inducement to

Registered Office 66 Lincoln’s Inn Fields, London, WC2A 3LH Company Number 5131528 subscribe for shares in Serabi Gold plc

A comparison of the updated Mineral Resource Estimates as at 31 January 2026 with the previously reported Mineral Resource

Estimate as at 16 April 2024 published on 13 November 2024 is set out below.

Comparison of Mineral Resources for the Coringa Mine, Para, Brazil

31 January 2026 16 April 2024

Tonnes Grade Contained Tonnes Grade Contained

(000’s) (g/t Au) (000’s oz) (000’s) (g/t Au) (000’s oz)

Measured Resources 358 11.2 129 172 9.0 49

Indicated Resources 702 7.7 174 623 6.5 130

Measured & Indicated Resources 1,060 8.9 304 795 7.0 179

Inferred Resources 1,755 8.8 495 1,454 5.8 271

GLOSSARY OF TERMS

The following is a glossary of technical terms:

“Ag” means silver.

“Au” means gold.

“assay” in economic geology, means to analyse the proportions of metal in a rock or overburden sample; to test an ore or mineral for

composition, purity, weight or other properties of commercial interest.

“CIM” means the Canadian Institute of Mining, Metallurgy and Petroleum.

“chalcopyrite” is a sulphide of copper and iron.

“Cu” means copper.

“cut-off grade” the lowest grade of mineralised material that qualifies as ore in a given deposit; rock of the lowest assay included in an or e

estimate.

“dacite porphyry

intrusive”

a silica-rich igneous rock with larger phenocrysts (crystals) within a fine -grained matrixi

“deposit” is a mineralised body which has been physically delineated by sufficient drilling, trenching, and/or underground work, and fo und

to contain a sufficient average grade of metal or metals to warrant further exploration and/or development expenditures; such a

deposit does not qualify as a commercially mineable ore body or as containing ore reserves, until final legal, technical, and

economic factors have been resolved.

“electromagnetics” is a geophysical technique tool measuring the magnetic field generated by subjecting the sub -surface to electrical currents.

“garimpo” is a local artisanal mining operation

“garimpeiro” is a local artisanal miner.

“geochemical” refers to geological information using measurements derived from chemical analysis.

“geophysical” refers to geological information using measurements derived from the use of magnetic and electrical readings.

“geophysical techniques” include the exploration of an area by exploiting differences in physical properties of different rock types. Geophysical meth ods

include seismic, magnetic, gravity, induced polarisation and other techniques; geophysical surveys can be undertaken from the

ground or from the air.

“gossan” is an iron-bearing weathered product that overlies a sulphide deposit.

“grade” is the concentration of mineral within the host rock typically quoted as grams per tonne (g/t), parts per million (ppm) or pa rts per

billion (ppb).

“g/t” means grams per tonne.

“granodiorite” is an igneous intrusive rock similar to granite.

“hectare” or a “ha” is a unit of measurement equal to 10,000 square metres.

“igneous” is a rock that has solidified from molten material or magma.

“IP” refers to induced polarisation, a geophysical technique whereby an electric current is induced into the sub -surface and the

conductivity of the sub-surface is recorded.

“intrusive” is a body of rock that invades older rocks.

"Indicated Mineral

Resource

An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and

physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to

support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately

detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuit y

between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured

Mineral Resource and may only be converted to a Probable Mineral Reserve.

"Inferred Mineral

Resource”

An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the

basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade o r

quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral

PRESS RELEASE 28 APRIL 2026

SERABI GOLD plc (“Serabi” or “the Company”)

SERABI GOLD PLC

The Long Barn, Cobham Park Road, Downside, Surrey KT11 3NE This document is not intended to and does

t +44 (0)20 7246 6830 e [email protected] www.serabigold.com not amount to an invitation or inducement to

Registered Office 66 Lincoln’s Inn Fields, London, WC2A 3LH Company Number 5131528 subscribe for shares in Serabi Gold plc

Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral

Resources could be upgraded to Indicated Mineral Resources with continued exploration.

“Measured Mineral

Resource”

A Measured Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and

physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed

mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and

reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of

observation. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral

Resource or an Inferred Mineral Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve.

“mineralisation” the concentration of metals and their chemical compounds within a body of rock.

“mineralised” refers to rock which contains minerals e.g. iron, copper, gold.

"Mineral Resource” A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form,

grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade

or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific

geological evidence and knowledge, including sampling.

“Mineral Reserve” A Mineral Reserve is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting

materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at Pre -

Feasibility or Feasibility level as appropriate that include application of Modifying Factors. Such studies demonstrate that, at the

time of reporting, extraction could reasonably be justified.

“Mo-Bi-As-Te-W-Sn” Molybdenum-Bismuth-Arsenic-Tellurium-Tungsten-Tin

“monzogranite” a biotite rich granite, often part of the later-stage emplacement of a larger granite body.

“mt” means million tonnes.

“ore” means a metal or mineral or a combination of these of sufficient value as to quality and quantity to enable it to be mined at a

profit.

“oxides” are near surface bed-rock which has been weathered and oxidised by long term exposure to the effects of water and air.

“ppm” means parts per million.

“Probable Mineral

Reserve”

is the economically mineable part of an Indicated and, in some circumstances, a Measured Mineral Resource demonstrated by at

least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical,

economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.

“Proven Mineral Reserve” is the economically mineable part of a Measured Mineral Resource. A Proven Mineral Reserve implies a high degree of

confidence in the Modifying Factors.

“saprolite” is a weathered or decomposed clay-rich rock.

“sulphide” refers to minerals consisting of a chemical combination of sulphur with a metal.

“vein” is a generic term to describe an occurrence of mineralised rock within an area of non -mineralised rock.

“VTEM” refers to versa time domain electromagnetic, a particular variant of time -domain electromagnetic geophysical survey to prospect

for conductive bodies below surface.

“XRF” X-ray Fluorescence (XRF) is a spectrometric technique used to perform elemental analysis non -destructively on samples