Jiulian Resources Expands Phase I Drill Program at the Big Kidd
#335 – 1632 Dickson Avenue Kelowna, BC V1Y 7T2
www.jiulianresources.com
News Release
Jiulian Resources Expands Phase I Drill Program at the Big Kidd
March 21, 2019 TSX-V: JLR
JIULIAN RESOURCES INC. (TSX-V: JLR) ("Jiulian" or the "Company") is pleased to announce that it
is expanding its phase I maiden drill program at its wholly-owned Big Kidd Project (“Big Kidd” or the
“Property”), located nine kilometres northeast of Westhaven Venture’s Shovelnose gold Property 1.
Six holes have been completed on the BK Breccia target, to a maximum depth of 660 meters (BK-19-
004). The copper-gold mineralized hydrothermal breccia intersected by shallow historic drilling
appears to increase in intensity at depth. Increasing potassic alteration with up to 10% total sulphides
(pyrite+chalcopyrite) has been intersected at depth below the historic drilling.
Scott Dorion, Q.P. and director for Jiulian, commented: “Given what we have observed in these initial
drill holes, we are expanding our maiden drill program to better define the extents of what appears to
potentially be a widespread alkalic Au-Cu porphyry system.”
To view core photos from the Phase I drill program please visit the Company’s website.
Highlights:
Drill program immediately expanded to 5,000 meters.
Mineralization and alteration appear to increase with depth.
Hole BK-19-004, which tested the BK Breccia and Big Brother transition zone, intersected
potassic alteration with chalcopyrite stringers near the margins of the Big Brother chargeability
anomaly.
Hole BK-19-002 was successful in increasing the mineralized zone significantly to the south and
at depth. BK-19-005 was successful in increasing the BK Breccia further to the west and to the
east at depth, and BK-19-006 is currently underway and to date has increased the size of the
mineralized zone to the south and at depth.
Drill pad construction is currently underway for hole BK-19-007, which has a designed depth of
700m and will test the Big Brother Zone for the first time ever.
Qualified Person
Independent Director of Jiulian, Scott Dorion, P.Geo., is the designated Qualified Person of the Company
as defined by National Instrument 43-101 and has reviewed and approved the technical information
contained in this release.
About Jiulian
Jiulian is an exploration company engaged in acquiring and advancing mineral properties located in
southern British Columbia. The Company’s flagship asset is the wholly-owned, 4,056-hectare Big Kidd
property, located near Aspen Grove, BC. The Big Kidd property is located 25 km (approximately 15
minutes via Highway 97C) east of Merritt, BC, and 102 km west of the Company’s head office in Kelowna,
#335 – 1632 Dickson Avenue Kelowna, BC V1Y 7T2
www.jiulianresources.com
BC. The Property has a network of gravel roads, LTE cellular service and a high-voltage power line
running across it. Jiulian Resources is listed on the TSX-V under the symbol “JLR”.
ON BEHALF OF THE BOARD OF DIRECTORS OF
JIULIAN RESOURCES INC.
“X. Charlie Cheng”
X. Charlie Cheng
Chief Executive Officer
For more information regarding this news release, please contact:
Oliver Friesen, Director
T: 604-789-6128
W: www.jiulianresources.com
Cautionary Note Regarding Forward-Looking Statements
Certain statements contained in this news release, constitute "forward-looking information" as such term is used in
applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of
management at the date the information is provided and is subject to certain factors and assumptions, including:
that the Company's financial condition and development plans do not change as a result of unforeseen events, that
the Company obtains required regulatory approvals, that the Company continues to maintain a good relationship
with the local project communities. Forward-looking information is subject to a variety of risks and uncertainties and
other factors that could cause plans, estimates and actual results to vary materially from those projected in such
forward-looking information. Factors that could cause the forward-looking information in this news release to change
or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be
valid or reliable, which could result in delays, or cessation in planned work, that the Company's financial condition
and development plans change, delays in regulatory approval, risks associated with the interpretation of data, the
geology, grade and continuity of mineral deposits, the possibility that results will not be consistent with the
Company's expectations, as well as the other risks and uncertainties applicable to mineral exploration and
development activities and to the Company as set forth in the Company's Management’s Discussion and Analysis
reports filed under the Company's profile at www.sedar.com. There can be no assurance that any forward-looking
information will prove to be accurate, as actual results and future events could differ materially from those anticipated
in such statements. Accordingly, the reader should not place any undue reliance on forward-looking information or
statements. The Company undertakes no obligation to update forward-looking information or statements, other than
as required by applicable law.
1Adjacent Properties - This news release contains information about adjacent properties on which Jiulian does not
have the right to explore or mine. Investors are cautioned that mineral deposits on adjacent properties are not
indicative of mineral deposits on the Company's properties.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.