Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SAM.TO ·

Starcore Commences Environmental Rehabilitation Project in Mexico Drilling Begins on El Oro Mine Tailings

Exploration Programs

______________________________________________________________________________

Suite 750 – 580 Hornby Street, Box 113, Vancouver, British Columbia, Canada V6C 3B6 Telephone: (604) 602-4935 Fax: (604)

602-4936 e-mail. [email protected] website: www.starcore.com

June 17, 2024 TSX: SAM

FSE: V4JA

NOT FOR DISTRIBUTION IN THE UNITED STATES

Starcore Commences Environmental Rehabilitation Project in Mexico

Drilling Begins on El Oro Mine Tailings

Vancouver, B.C. - Further to its news release of May 13, 2024 Starcore International Mines Ltd. (TSX:

SAM) (“Starcore” or the “Company”) reports that together with Xali Gold Corporation and Kappes, Cassiday

& Associates (“KCA”), drilling has begun on the El Oro Mine Tailings at El Oro, Mexico, for the purpose of

taking a representative sample which will be used to confirm the process flowsheet. The tailings were the

subject of a 43-101 Resource Study in 2014 which concluded the tailings contain 1.27M tonnes at a grade of

2.94 grams per tonne gold and 75.12 grams per tonne silver (3.85 gpt Au equivalent). KCA’s recent work has

resulted in a recovery of over 75% of the gold and silver, but these results are on composites which did not

access the full depth of the tailings. While the data indicates that the tailings are mineralogically uniform, the

new drill program is designed to provide samples to confirm this assumption. The El Oro Mine tailings are

situated on land owned by the Municipality of El Oro and are bordered by a stream which flows though

developed portions of the municipality. El Oro is one of the named “Pueblo Magico” localities near Mexico

City. Clean-up of these tailings will not only eliminate an environmental risk, but will also release a large block

of land which the Municipality can use for further development.

As previously reported, Starcore has joined forces with KCA to launch an environmental rehabilitation project

to clean up mine tailings from the municipality of El Oro in Mexico. The parties have executed a Memorandum

of Understanding (“MOU”) to enter into a joint venture whereby KCA would provide its expertise and services

for the project aimed at rehabilitating the environment, and Starcore would act as Operator of the joint venture.

It is intended that the MOU will be replaced with a formal JV agreement, subject to: (i) KCA having earned

a 100% interest in Xali Gold’s El Oro Tailings Project by making the agreed-upon payments to Xali Gold,

subject to royalty payments ( see Xali Gold’s news release of Apil 15, 2024 ), (ii) satisfactory drilling and

testing of the El Oro Tailings, and (iii) satisfactory arrangements being negotiated with the municipality of

El Oro.

About Starcore

Starcore International Mines is engaged in precious metals production with focus and experience in Mexico.

While this base of producing assets has been complemented by exploration and development projects

throughout North America, Starcore intends to expand its reach internationally with the proposed

acquisition of a project in Côte d’Ivoire. The Company is a leader in Corporate Social Responsibility and

______________________________________________________________________________

Suite 750 – 580 Hornby Street, Box 113, Vancouver, British Columbia, Canada V6C 3B6 Telephone: (604) 602-4935 Fax: (604)

602-4936 e-mail. [email protected] website: www.starcore.com

advocates value driven decisions that will increase long term shareholder value. You can find more

information on the investor friendly website here: www.starcore.com.

ON BEHALF OF STARCORE INTERNATIONAL

MINES LTD.

(Signed) “Robert Eadie”

Robert Eadie, President & Chief Executive Officer

FOR FURTHER INFORMATION PLEASE CONTACT:

ROBERT EADIE

Telephone: (604) 602-4935

LinkedIn

Twitter

Facebook

The Toronto Stock Exchange has not reviewed nor does it accept responsibility

for the adequacy or accuracy of this press release.

This news release contains “forward -looking” statements and information (“forward -looking statements”).

All statements, other than statements of historical facts, included herein, including, without limitation,

management’s expectations and the potential o f the Company’s projects, are forward looking statements.

Forward-looking statements are based on the beliefs of Company management, as well as assumptions made

by and information currently available to Company’s management and reflect the beliefs, opinion s, and

projections on the date the statements are made. Forward -looking statements involve various risks and

uncertainties and accordingly, readers are advised not to place undue reliance on forward-looking statements.

There can be no assurance that such statements will prove to be accurate, and actual results and future events

could differ materially from those anticipated in such statements. The Company assumes no obligation to

update forward‐looking statements or beliefs, opinions, projections or other factors, except as required by law.