Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SAM.TO ·

STARCORE ANNOUNCES Second Quarter Production Results

Production Results

Suite 750 – 580 Hornby Street, Box 113, Vancouver, British Columbia, Canada V6C 3B6

Telephone: (604) 602-4935 Fax: (604) 602-4936 e-mail: [email protected] website: www.starcore.com

November 14, 2023 TSX: SAM

STARCORE ANNOUNCES

Second Quarter Production Results

Vancouver, B.C. – Starcore International Mines Ltd. (TSX: SAM) (“Starcore” or “the Company”)

announces production results for the second fiscal quarter ended October 2023, at its San Martin Mine

(“San Martin”) in Queretaro, Mexico.

“In late Q2, the mine returned to the level of monthly production planned for the 2023 – 2024 fiscal

year, as well as recovering additional ounces over budgeted amounts to make up for the lower than

planned production in Q1,” stated Salvador Garcia, Chief Operating Officer. “The Q2 results reflect

more accurately the mine’s stable production based on consisten cy from stopes in production, gold

and silver ore grades meeting the plan, efficient processing with good recoveries and the development

and mining in line with budgeted expectations. The most important aspect is the proven team we have

at San Martin that is encouraged to grow the operations. In this respect , we are working specifically

on two fronts; firstly, as stated previously, we are working closely on completing the acquisition of

or merger with local mining property owners which will allow us to develop these properties and

provide additional ore to utilize the unused capacity of our plant ; and, s econdly, we have begun to

research how to process the approximately one million tonnes of carbonaceous ore in our mine, that

we have been unable to process in our plant, which contain grades of 2.5 gr/tonne of gold equivalent.

This project is focused to increase the reserves and therefore the L ife of Mine . In the end, we are

always focused on producing profitable ounces overall,” further stated Salvador Garcia.

12 Month YTD

San Martin Production Q2 2024 Q1 2024 Q/Q Change 2024 2023 Y/Y Change

Ore Milled (Tonnes) 58,019 57,700 1% 115,719 112,428 3%

Gold Equivalent Ounces 2,420 1,918 26% 4,338 5,377 -19%

Gold Grade (Grams/Ton) 1.42 1.13 26% 1.27 1.58 -20%

Silver Grade (Grams/Ton) 14.88 14.24 5 % 14.56 16.99 -14

Gold Recovery (%) 85.23 83.99 1% 84.68 88.36 -4%

Silver Recovery (%) 48.81 45.82 7% 47.35 48.64 -3%

Gold: Silver Ratio 83.49 81.98 82.76 86.90

- 2 -

Salvador Garcia, B. Eng., a director of the Company and Chief Operating Officer, is the Company’s

qualified person on the project as required under NI 43-101and has prepared the technical information

contained in this press release.

About Starcore

Starcore International Mines is engaged in precious metals production with focus and experience in

Mexico. While this base of producing assets is complemented by exploration and development projects

throughout North America, Starcore is driven to expand its reach internationally. The Company is a leader

in Corporate Social Responsibility and advocates value driven decisions that will increase long term

shareholder value. You can find more information on the investor friendly website here:

www.starcore.com.

ON BEHALF OF STARCORE INTERNATIONAL

MINES LTD

Signed “Robert Eadie”

Robert Eadie, Chief Executive Officer

FOR FURTHER INFORMATION PLEASE CONTACT:

ROBERT EADIE

Investor Relations

Telephone: (604) 602-4935 x 203

The Toronto Stock Exchange has not reviewed, nor does it accept responsibility

for the adequacy or accuracy of this press release.