Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SALT.V ·

Red Moon Resources – Project Updates

Corporate Updates

333 Duckworth Street, St. John's, NL, A1C 1G9

Telephone: (709) 754-3186 Fax: (709) 754-3946 Email: [email protected]

www.redmoonresources.com

News Release

March 01, 2018

Stock Symbol: TSX.V: RMK

Red Moon Resources – Project Updates

St. John’s, Newfoundland and Labrador: Red Moon Resources Inc. (“the Company” - “Red

Moon” TSX-V:RMK), announces that its Environmental Registration document has been accepted and

released from further environmental review for the Ace gypsum mining lease in western Newfoundland.

This allows the company to finalize its Development Plan for submission to the provincial Department of

Natural Resources and push forward on mine development. The company proposes to enter into a

mining, distribution and sales contract with local operators through an affiliated entity to initiate

production.

Gypsum is mined by traditional open pit methods, which are amenable to scaling of production to meet

the demand cycle. A deep -water port connected by a haulage road is located approximately 9

kilometers from the proposed Ace pit. The project is situated off a p aved road approximately 6

kilometers from the Trans Canada highway and 20 kilometers from the local service center of the Town

of Stephenville.

The proposed open pit operation is located in the dormant Flat Bay mines that produced at least

15,000,000 tonnes of gypsum prior to 1990 . Initially, mining will start at an existing face in the former

open pit quarry . This project should generate cash flow and provide invaluable experience that the

Company can use in the permitting and development of its Captain C ook salt deposit which lies

underground approximately 3 kilometers north of the Ace deposit . Some of the same existing

infrastructure will be utilized.

Captain Cook Salt Project

The Company is in the marketing phase of the project seeking feasibility financing for the development

of a new salt mine in eastern Canada. It has entered into discussions with both salt producers and

private equity groups to solicit this funding. The company believes a significant market opportunity

exists on the eastern seab oard of North America for a new efficient low -cost salt producer. The closure

of the potash mine at Sussex , New Brunswick has removed approximately 800,000 tonnes of annual by-

product salt supply from the local market. Historically low global bulk shipping rates have allowed salt to

333 Duckworth Street, St. John's, NL, A1C 1G9

Telephone: (709) 754-3186 Fax: (709) 754-3946 Email: [email protected]

www.redmoonresources.com

be imported from distant sources such as Chile and Egypt. As shipping rates normalize , Captain Cook’s

proximity to eastern seaboard markets will be a significant competitive advantage.

Black Bay Nepheline

In late 2017 the Company collected 3.5 tonnes of nepheline-bearing material from its Black Bay project.

The material, obtained from approximately 130 channel samples, was sourced from an area that

exhibited the highest grades of aluminum from the 2016 bedrock mapping project. Half of the 2017

material was sent to SGS Laboratories in Lakefield, Ontario, for detailed characterization and

metallurgical testing and the other half is retained by the Company as a reference. The objective is to

determine the chemical composition of a processed sample to determine if it can meet industrial

specifications. The analytical work on a smaller sample from 2016 field work indicated that industrial

specifications may be attainable. One of the main outcomes of the current analysis will be to establish

how low the iron content can be reduced as this is a determinative factor in the ultimate value of the

end product.

Geochemical results from the 2017 channel samples are similar to the average results from the

approximately 30 grab samples of 2016 as below; these samples were collected over a similar field area.

Zone Al2O3 (Avg %) Fe2O3 (Avg %) Na2O (Avg %) K2O (Avg %)

2016 Rocks 21.14 3.78 8.14 4.34

2017 Channels 21.57 3.69 9.00 4.36

A composite bulk sample created by blending the channel samples is currently being processed. A

sequence of subsamples will be produced and subjected to dry magnetic separation testing at a series of

progressively stronger magnetic fields in order to remove iron-bearing minerals. Details of this full

beneficiation process will be reported when available.

Prospectors and Developers Association Convention (PDAC)

The Company will be exhibiting at the PDAC from Sunday, March 4th to Wednesday, March 7th in the

Investors Exchange at the Metro Toronto Convention Centre. Please come and visit us at Booth 2744 if

you are attending the conference. The PDAC International Convention is the world’s premier mining

investment convention for people, companies and organizations in, or connected with, mineral

exploration.

Please refer to www.redmoonresources.com for further information about the Company’s projects.

Patrick J. Laracy, P. Geo, President, and Patrick Collins, P. Geo. are qualified persons responsible for the

contents of this news release as defined in National Instrument 43-101.

We seek Safe Harbor.

333 Duckworth Street, St. John's, NL, A1C 1G9

Telephone: (709) 754-3186 Fax: (709) 754-3946 Email: [email protected]

www.redmoonresources.com

Red Moon is an industrial minerals company developing the Ace Gypsum deposit , the Black Bay

Nepheline deposit and the Captain Cook S alt deposit in Newfoundland and Labrador. Vulcan Minerals

Inc. (TSX.V: VUL) owns approximately 67% of the common shares of Red Moon.

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or

accuracy of this release. Th is release may contain certain forward -looking statements. Actual events or

results may differ from the Company’s expectations. Certain risk factors beyond the Company’s control

may affect the actual results achieved. Accordingly, readers are advised not t o place undue reliance on

forward-looking information. Except by law, the Company undertakes no obligation to publicly update or

revise forward-looking information.

For information please contact:

Patrick J. Laracy, President

(709) 754-3186

[email protected]

www.redmoonresources.com