Royal Road Announces Further Drilling Results and Exploration Update from Its Guintär Copper and Gold Project; Colombia
Royal Road Announces Further Drilling
Results and Exploration Update from Its
Guintär Copper and Gold Project; Colombia
Toronto, Ontario--(Newsfile Corp. - February 23, 2022) - Royal Road Minerals Limited (
TSXV: RYR
)
("Royal Road" or the "Company") announces results from a further six diamond drill holes and the
commencement of further follow-up drilling at its Guintär copper-gold project, in Antioquia Department,
Colombia.
The Guintär project is part of the Guintär-Niverengo and Margaritas (GNM) project area which comprises
the two contiguous Guintär, and Niverengo concession contracts and the neighboring Margaritas
concession contract located in the Middle Cauca Valley, approximately 50 Km west of Medellin in
Antioquia Department, Colombia. The titles were acquired through the Company's purchase of Northern
Colombia Holdings Limited, an affiliate of AngloGold Ashanti Limited (see Press Release May 31,
2019). The GNM area is subject to a Strategic Alliance Agreement between the Company and Mineros
S.A. ("Mineros
TSX: MSA
; see Press Release March 3, 2020). Under the terms of the Agreement,
Mineros currently own a 25% interest in the GNM project area and may acquire a further 25% (up to a
total 50%) interest by providing the balance of a further USD $1.5M in exploration funding. Royal Road
Minerals are operators of the Strategic Alliance.
The Company has received results from the remaining six diamond drill holes from its 2021 drilling
program at the Guintär project, details are presented in
Table 1
. Results did not identify any immediate
southward extension to the copper and gold mineralization intersected in drill holes GUI-DD-011 and
GUI-DD-012 (see Press Release December 14, 2020). However, all drill holes, whether in skarn,
hornfels or intrusive rocks, returned relatively long intersections of anomalous gold and copper (for
example GUI-DD-15; from 0 to 240 meters at 0.3 grams per tonne gold and GUI-DD-19; from 252
meters to end of hole, returning 135 meters at 0.12% copper) which, together with detailed logging of
alteration intensity and intrusive paragenesis, will assist in locating drill holes for the follow-up drilling
program which is now underway.
TABLE 1: GUINTAR PRELIMINARY DRILL RESULTS
GOLD
SILVER
COPPER
GOLD
EQUIV^
INCLUDES
HOLE
ID
E
N
Z(m)
DIP
AZIM
DEPTH
FROM
TO
LENGTH
(m)*
GRADE
(g/t)
GRADE
(g/t)
%
GRADE
(g/t)
LENGTH
(m)*
GOLD
SILVER
COPPER
GRADE
(g/t)
GRADE
(g/t)
%
GUI-
DD-
011
391643
698953
2244
-75
180
400.6
8.0
18.0
10.0
1.0
4.4
99.7
117.6
17.9
0.9
1.9
238.9
242.0
3.2
1.3
2.4
291.7
296.1
4.4
0.9
1.7
GUI-
DD-
012
391870
698821
2185
-60
360
320.7
17.0
320.7
303.7
0.7
4.3
0.22
1
62
2.1
12.4
0.62
GUI-
DD-
013
391870
698821
2185
-80
360
588.3
68.0
194.0
126.0
0.8
5.5
0.34
1.3
55
1.5
10.8
0.60
311.0
314.0
3.0
2.4
351.0
395.0
44.0
1.1
2.1
441.0
447.0
6.0
1.0
510.5
516.5
6.0
1.2
3.9
GUI-
DD-
014
392124
698756
2171
-70
210
372.73
8.0
13.0
5.0
1.1
8.6
0.18
48.5
49.5
1.0
4.4
8
0.19
94.0
96.0
2.0
6.4
246.5
252.0
5.5
0.9
GUI-
DD-
015
392300
699250
2356
-75
360
466.56
31.5
42.5
11.0
1.0
176.0
180.5
4.5
1.0
196.0
200.5
4.5
1.0
217.0
218.0
1.0
10.6
9.6
GUI-
DD-
016
392250
698900
2258
-65
30
436.58
365.0
372.0
7.0
1.0
431.0
434.0
3.0
1.1
GUI-
DD-
017
392250
698900
2258
-65
320
235.84
55.0
58.0
3.0
1.0
9.1
0.14
231.5
235.4
3.9
0.9
5
0.15
GUI-
DD-
018
391870
698821
2185
-60
60
496.71
84.0
92.5
8.5
1.4
3.9
145.0
147.0
2.0
1.0
2.1
0.13
377.0
379.0
2.0
1.0
1.8
0.14
415.5
418.5
3.0
0.9
2.3
0.16
GUI-
DD-
019
391834
698837
2208
-60
345
386.98
0.0
5.0
5.0
1.2
6.2
77.0
81.0
4.0
3.7
10.4
0.19
207.0
209.0
2.0
2.1
^GOLD EQUIVALENT CALCULATION ASSUMES USD $1850/OZ GOLD AND USD $23/OZ SILVER AND $4.4/lb COPPER AND 90% RECOVERY FOR
ALL METALS
*NOT TRUE WIDTH
DOWN HOLE CUT-OFF 0.2 g/t
gold only
MAXIMUM INTERNAL DILUTION -10 Meters
Reconnaissance auger soil sampling conducted to the north of the Guintär title area, on the Guintär North
title application
(over which the Company has an option to earn 100% - see Press Release December
14, 2021), shows a northward extension of copper and gold mineralization along strike from drill holes
GUI-DD-011 and GUI-DD-012 (see
Figure 1
).
Figure 1
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4008/114562_royalr2.jpg
"On the basis of current information it seems likely that porphyry style copper and gold mineralization at
Guintär continues to the north onto the Guintär North title application area and possibly also at depth,
towards the northwest and onto our Niverengo title". said Tim Coughlin, Royal Road's President and
CEO. "Previous drilling from the Niverengo area intersected skarn-style mineralization and up to 88
meters at 0.9 grams per tonne gold, as a consequence of last years drilling, we now know that such
grades hosted in skarn rocks elsewhere within the project area are indicative of intrusive and probably
porphyry style mineralization nearby".
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
The information in this news release was compiled, reviewed and verified by Dr. Tim Coughlin, BSc
(Geology), MSc (Exploration and Mining), PhD (Structural Geology), FAusIMM, President and CEO of
Royal Road Minerals Ltd and a qualified person as defined by National Instrument 43-101. Royal
Road Minerals employees are instructed to follow standard operating and quality assurance
procedures intended to ensure that all sampling techniques and sample results meet international
reporting standards. More information can be found on Royal Road Minerals web site at
www.royalroadminerals.com
Quality Assurance and Quality Control:
Sample preparation and analyses are conducted according to standard industry procedures. Drill
core samples are crushed, split and pulverized prior to analysis of Gold by fire assay and Atomic
Absorption and multi-elements by ICP-AES and ICP-MS after four acid digestion. Soil samples are
sieved to -200 mesh and analyzed for Gold by fire assay and ICP AES and multi-elements by ICP-
AES and ICP-MS after aqua regia digestion. Analytical performance is monitored by means of
certified reference materials (CRMs), coarse blanks, coarse and pulp duplicate samples. Surface
samples have been prepared in ALS Chemex preparation lab in Colombia and analyses have been
completed in ALS Chemex Lima.
Cautionary statement:
This news release contains certain statements that constitute forward-looking information and forward-
looking statements within the meaning of applicable securities laws (collectively, "forward-looking
statements") describing the Company's future plans and the expectations of its management that a
stated result or condition will occur. Such forward-looking statements involve known and unknown
risks, uncertainties and other factors that may cause the actual results, performance or achievements
of the Company, or developments in the Company's business or in the mineral resources industry, to
differ materially from the anticipated results, performance, achievements or developments expressed
or implied by such forward-looking statements. Forward-looking statements include all disclosure
regarding possible events, conditions or results of operations that is based on assumptions about,
among other things, future economic conditions and courses of action, and assumptions related to
government approvals, and anticipated costs and expenditures. The words "plans", "prospective",
"expect", "intend", "intends to" and similar expressions identify forward looking statements, which may
also include, without limitation, any statement relating to future events, conditions or circumstances.
Forward-looking statements of the Company contained in this news release, which may prove to be
incorrect, include, but are not limited to the Company's exploration plans.
The Company cautions you not to place undue reliance upon any such forward-looking statements,
which speak only as of the date they are made. There is no guarantee that the anticipated benefits of
the Company's business plans or operations will be achieved. The risks and uncertainties that may
affect forward-looking statements include, among others: economic market conditions, anticipated
costs and expenditures, government approvals, and other risks detailed from time to time in the
Company's filings with Canadian provincial securities regulators or other applicable regulatory
authorities. Forward-looking statements included herein are based on the current plans, estimates,
projections, beliefs and opinions of the Company management and the Company does not undertake
any obligation to update forward-looking statements should assumptions related to these plans,
estimates, projections, beliefs and opinions change.
For further information please contact:
Dr. Timothy Coughlin
President and Chief Executive Officer
+44 (0)1534 887166
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/114562