Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RVG.V ·

Revival GOLD Intersects Near-Surface Oxide GOLD IN an Additional Eleven Drill Holes at Beartrack-Arnett

Exploration Programs

1

REVIVAL GOLD INTERSECTS NEAR-SURFACE OXIDE GOLD IN AN

ADDITIONAL ELEVEN DRILL HOLES AT BEARTRACK-ARNETT

Toronto, ON – December 10th, 2020 – Revival Gold Inc. (TSXV: RVG, OTCQB: RVLGF) (“Revival Gold”

or the “Company”), a growth‐focused gold exploration and development company, announces

results from an additional eleven drill holes from the Company’s 2020 drilling program on the past-

producing Beartrack-Arnett Gold Project (“Beartrack-Arnett”) located in Idaho, USA.

The eleven holes released today are core holes drilled in the Haidee target area to upgrade

resources from the Inferred category to the Indicated category (see Technical Report on the

Beartrack-Arnett Gold Project, Lemhi County, Idaho, USA dated February 21st, 2020) and to expand

the resource along strike and up-dip.

Highlights

• 1.01 g/t gold over 11.0 meters1 and 0.39 g/t gold over 10.4 meters1 in AC20-49D

• 0.40 g/t gold over 13.2 meters1 AC20-052D

• 0.86 g/t gold over 48.5 meters1 in AC20-059D

• 0.45 g/t gold over 36.1 meters1 in AC20-062D

• 0.83 g/t gold over 13.4 meters1 in hole AC20-065

1 Drilled width; true width estimated to be approximately equivalent to drilled width .

Drillholes AC20 -062D and AC20 -059D were drilled along the northeast margin of the existing

mineral resource at Haidee. Both holes intersected long intervals of gold mineralization indicating

that mineralization extends up -dip into the gold soil anomaly northeast of the current Haidee

resource. The anomaly is largely untested and represents an attractive target for further

exploration.

“We are very pleased to see additional broad intercepts of near-surface oxide gold mineralization

in the Haidee area. The results offer potential to expand the open pit heap leach mine plan outlined

in the results of Revival Gold’s first phase Preliminary Economic Assessment released in November,”

said President and CEO Hugh Agro.

2

Drill Results

Detailed results for the Haidee target drill holes released today are presented in the table below:

Hole Number

Area

Azimuth

(deg.)

Dip

(deg.)

From

(m)

To

(m)

Drilled

Width1

(m)

Fire Assay

Gold

Grade2

(g/t)

AC20-049D3 Haidee 64.6 -60.9 4.0 14.9 11.0 1.01

Incl. 6.8 8.8 2.0 3.67

20.3 23.7 3.4 0.72

Incl. 20.3 20.7 0.5 3.19

80.2 84.4 4.3 1.15

91.1 101.5 10.4 0.39

111.6 137.3 25.7 0.27

AC20-052D4 Haidee 82.4 -47.2 22.9 34.4 11.6 0.28

71.0 77.1 6.1 0.28

106.1 119.3 13.2 0.40

Incl. 106.1 107.6 1.5 2.67

140.5 151.5 11.0 0.22

181.2 189.2 8.1 0.20

AC20-055D5 Haidee 88.1 -46.3 2.7 9.1 6.4 0.81

25.6 29.0 3.4 0.54

62.2 69.2 7.0 1.03

98.1 102.0 3.8 1.70

120.9 122.6 1.8 0.35

144.8 148.4 3.7 0.48

168.8 173.6 4.8 0.24

182.3 184.7 2.4 0.28

AC20-057D6 Haidee 63.3 -60.3 7.3 11.9 4.6 0.41

41.8 70.9 29.2 0.19

96.5 117.1 20.6 0.21

130.1 136.2 6.1 0.26

142.5 144.6 2.1 0.40

AC20-058D Haidee 77.3 -50.8 56.4 59.4 3.0 2.82

Incl. 56.4 57.9 1.5 5.38

82.5 86.6 4.1 0.87

Incl. 82.5 83.2 0.7 2.97

AC20-059D7 Haidee 66.6 56.0 3.8 8.5 4.7 0.28

17.4 23.2 5.8 0.31

44.5 48.2 3.7 0.33

64.6 113.1 48.5 0.86

3

Hole Number

Area

Azimuth

(deg.)

Dip

(deg.)

From

(m)

To

(m)

Drilled

Width1

(m)

Fire Assay

Gold

Grade2

(g/t)

Incl. 64.6 66.4 1.8 3.59

Incl. 84.7 92.4 7.6 1.55

Incl. 86.3 87.6 1.4 4.13

Incl. 99.1 100.5 1.4 7.66

127.4 132.0 4.6 0.60

AC20-060D Haidee 64.8 -63.4 74.1 77.1 3.0 0.24

155.4 165.8 10.4 0.70

Incl. 158.5 165.8 7.3 0.93

AC20-062D8 Haidee 61.0 -60.5 5.5 12.5 7.0 0.91

27.4 46.6 19.2 0.25

99.5 135.6 36.1 0.45

Incl. 105.6 110.2 4.6 1.14

AC20-063D Haidee 63.9 -60.8 No significant results

AC20-064D9 Haidee 65.8 -60.0 6.9 11.6 4.7 0.21

AC20-065D10 Haidee 64.1 -60.9 17.5 30.9 13.4 0.83

83.9 89.9 6.0 0.89

113.3 134.1 20.8 0.19

1 True width estimated to be approximately equivalent to drilled width although some variation may occur. Numbers

may not add up due to rounding.

2 Where applicable, grades at Arnett are capped at 8.0 g/t Au using the methodology described in the Technical

Report on the Beartrack-Arnett Gold Project, Lemhi County, Idaho, USA dated February 21st, 2020. No capping was

applicable in the results presented above.

3 Average core recovery for the interval 4.0 meters to 14.9 meters was 74%. Recover y for individual intervals was as

follows: 7.0 meters to 7.9 meters – 38%; 8.8 meters to 10.1 meters – 50%; 11.3 meters to 12.6 meters – 43%; 13.1

meters to 13.7 meters – 25%; 14.0 meters to 14.3 meters – 50%.

4 Core recovery for intervals with recovery below 50% was as follows: 22.9 meters to 23.2 meters - 50%; 23.5 meters

to 23.8 meters – 50%; 143.6 meters to 145.1 meters – 36%.

5 Core recovery for intervals for the intervals 6.1 meters to 7.6 meters and 8.2 meters to 8.5 meters was 40% and 0%;

respectively. The interval from 8.3 meters to 8.5 meters was included at 0 g/t Au.

6 Core recovery for the intervals with recovery below 50% was as follows : 10.8 meters to 11.9 meters – 43%; 113.4

meters to 114.9 meters was 0%; 114.9 meters to 116.4 meters – 50%; 130.1 meters to 130.8 meters – 40%. The

interval from 113.4 meters to 114.9 meters was included at 0 g/t Au.

7 Core recovery for the interval 45.1 meters to 46.6 meters was 50%.

8 Core recovery for the interval 110.2 meters to 111.1 meters was 40%.

9 Hole AC20-064D represents the re-drilled upper 32.0 meters of hole AC20-046D, which had very poor core recovery.

10 Core recovery from 20.3 meters to 20.7 meters was 13%.

4

Figure 1 below is a plan view of the Arnett Haidee target area describing the collar locations for all

thirty drill holes completed in this year’s drill ing program (including those for which results have

been released to-date).

Figure 1: Haidee Target Area 2020 Drilling Program

Drill Program Update

The thirty exploration and infill drill holes completed this season on the Haidee target totaled

approximately 4,900 meters of drilling.

A further five holes have been completed between the North and South Pit areas totaling

approximately 1,660 meters. The holes in this area cover a strike length varying from 400 to 600

meters along the Panther Creek Shear Zone (“PCSZ”). Each of the holes intersected the PCSZ with

varying amounts of oxidized and unoxidized sulfides in each hole.

5

An initial three exploration holes have been drilled in the Rabbit target area for a total of

approximately 900 meters. Difficult drilling conditions limited the depth of drilling at Rabbit ,

however, the operating and geological information obtained in drilling these holes will be of use in

planning next year’s follow-up program.

This year’s drill program will conclude shortly with the completion of two exploration drill holes in

the Joss target area for a total of approximately 960 meters. Remaining assay results for the seven

outstanding drill holes at Haidee and the nine outstanding drill holes at Beartrack are expected to

be available in January and February 2021.

Claim Staking

Revival Gold staked an additional 47 claims on the northwestern boundary of the Beartrack-Arnett

property this fall. The claims were staked around the periphery of the existing claim block to cover

areas of alteration or conceptual targets developed during the Company’s 2020 mapping program.

The new claims cover approximately 380 hectares, bringing the area covered by Revival Gold’s total

land position at Beartrack-Arnett to approximately 5,800 hectares.

Upcoming Activities

With 2020 field work coming to an end , Revival Gold has initiated a review of the data collected

during this year’s exploration program and the integration of this data into the Beartrack-Arnett

geological model. In connection with these activities, the Company has contracted Mira Geoscience

Ltd. (“Mira”), a geological consulting firm with expertise in three-dimensional computer modeling

and artificial intelligence. Mira will take a holistic approach to data analysis, integrating all drilling

data, including historical blast hole drilling from the Beartrack mine, geological, geochemical, and

geophysical data to generate a three -dimensional model of the mineral systems at Beartrack -

Arnett. The aim is to build on the Company’s understanding of mineralization controls at the

deposit scale, the controls on higher grades within the deposits and to identify additional

exploration targets beyond the known resource.

The Company has also retained consulting structural geologist, Mr. Brett Davis, to investigate

incidents of high-grade mineralization within the current mineral resource at Beartrack -Arnett, at

depth and along strike within the PCSZ. Drilling in the PCSZ to-date has intersected several instances

of bonanza-style grades including 71 g/t gold over 9.8 meters (BT12 -175D), 23.1 g/t gold over 3.3

meters (BT17-201D), and 20.1 g/t gold over 2.1 meters (BT18 -221D). These results have received

little follow-up to-date.

6

Qualified Person

Steven T. Priesmeyer, C.P.G., Vice President Exploration, Revival Gold Inc., is the Company’s

designated Qualified Person for this news release within the meaning of National Instrument 43 -

101 Standards of Disclosure for Mineral Projects and has reviewed and approved its scientific and

technical content.

About Revival Gold Inc.

Revival Gold Inc. is a growth -focused gold exploration and development company. The Company

has the right to acquire a 100% interest in Meridian Beartrack Co., owner of the former producing

Beartrack Gold Project located in Idaho , USA. Revival Gold also owns r ights to a 100% interest in

the neighboring Arnett Gold Project.

Beartrack-Arnett is the largest past -producing gold mine in Idaho. A Preliminary Economic

Assessment has been completed for a first phase restart of heap leach operations to produce 72,000

ounces of gold per year over an initial seven -year mine life at an AISC of $1,057 per ounce of gold.

Meanwhile, exploration continues focused on expanding the current Indicated Mineral Resource of

36.6 million tonnes at 1.15 g/t gold containing 1.36 million ounces of gold and Inferred Mineral

Resource of 47.1 million tonnes at 1.08 g/t gold containing 1.64 million ounces of gold. The

mineralized trend at Beartrack extends for over 5 km and is open on strike and at depth.

Mineralization at Arnett is open in all directions.

For further details, including key assumptions, parameters and methods used to estimate the

Mineral Resources, and data verification, please see the Company’s press release dated November

17th, 2020 and NI 43 -101 compliant technical report titled “Technical Report on the Beartrack -

Arnett Gold Project, Lemhi County, Idaho, USA” dated February 21st, 2020.

Revival Gold has approximately 71.2 million shares outstanding and had a cash balance of

approximately C$12.7 million on S eptember 30 th, 2020. Additional disclosure including the

Company’s financial statements, technical reports, news releases and other information can be

obtained at www.revival-gold.com or on SEDAR at www.sedar.com.

For further information, please contact:

Hugh Agro, President & CEO or Adam Rochacewich, CFO

Telephone: (416) 366-4100 or Email: [email protected]

7

Cautionary Statement

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this news release. Technical in formation in this news release has been reviewed and approved by

Steven T. Priesmeyer, C.P.G., Vice President Exploration, Revival Gold Inc. and Rodney A. Cooper,

P.Eng., a consultant to Revival Gold Inc. , Qualified Person s within the meaning of National

Instrument 43-101 – Standards of Disclosure for Mineral Projects.

This News Release includes certain “forward -looking statements” which are not comprised of

historical facts. Forward -looking statements include estimates and statements that describe the

Company’s future plans, objectives or goals, including words to the effect that the Company, or

management, expects a stated condition or result to occur. Forward -looking statements may be

identified by such terms as “believes”, “anticipates”, “expects”, “est imates”, “may”, “could”,

“would”, “will”, or “plan”. Since forward-looking statements are based on assumptions and address

future events and conditions, by their very nature they involve inherent risks and uncertainties.

Although these statements are based on information currently available to the Company, the

Company provides no assurance that actual results will meet management’s expectations. Risks,

uncertainties and other factors involved with forward -looking information could cause actual

events, results, performance, prospects and opportunities to differ materially from those expressed

or implied by such forward -looking information. Forward-looking information in this news release

includes, but is not limited to, the Company’s intentions regarding its objectives, goals or future

plans and statements. Factors that could cause actual results to differ materially from such forward-

looking information include, but are not limited to, the Company’s ability to predict or counteract

the potential impact of COVID-19 coronavirus on factors relevant to the Company’s business, failure

to identify additional mineral resources, failure to convert estimated mineral resources to reserves

with more advanced studies , the inability to eventually complete a feasibility study which could

support a production decision, the preliminary nature of metallurgical test results may not be

representative of the deposit as a whole , delays in obtaining or failures to obtain required

governmental, environmental or other project approvals, political risks, uncertainties relating to

the availability and costs of financing needed in the future, changes in equity markets, inflation,

changes in exchange rates, fluctuations in commodity prices, delays in the development of projects,

capital, operating and reclamation costs varying significantly from estimates and the other risks

involved in the mineral exploration and development industry, and those risks set out in the

Company’s public documents filed on SEDAR. Although the Company believes that the assumptions

and factors used in preparing the forward-looking information in this news release are reasonable,

undue reliance should not be placed on such information, which only applies as of the date of this

news release, and no assurance can be given that such events will occur in the disclosed time frames

or at all. The Company disclaims any intention or obligation to update or revise any forward-looking

information, whether as a result of new information, future events or otherwise, other than as

required by law.