Revival GOLD Intersects 7.9 G/T GOLD over 2.9 Meters and 2.0 G/T GOLD over 47.4 Meters at Beartrack-Arnett
1
REVIVAL GOLD INTERSECTS 7.9 g/t GOLD OVER 2.9 METERS
AND 2.0 g/t GOLD OVER 47.4 METERS AT BEARTRACK-ARNETT
Toronto, ON – November 17th, 2022 – Revival Gold Inc. (TSXV: RVG, OTCQX: RVLGF) (“Revival Gold”
or the “Company”), is pleased to announce further results from the Company’s 202 2 drilling
program at the Beartrack-Arnett Gold Project (“Beartrack-Arnett”) located in Idaho, USA.
Highlights:
• Drill hole BT22-243D intersected 7.92 g/t gold over 2.9 meters and 2.02 g/t gold over 47.41
meters approximately 175 meters below the south end of the South Pit area;
• These results offer potential to expand the Beartrack-Arnett Mineral Resource with the
lengthier mineralized interval grading more than three times the open pit mill cut -off
grade calculated in Revival Gold’s most recent Mineral Resource estimate (see Revival Gold
NI-43-101 Technical Report by Wood plc dated July 13th, 2022, for further details);
• The high-grade interval observed in BT22-243D is consistent with the overall tenor of high-
grade mineralization observed in the Joss area, located approximately 1.2 kilometers to the
south;
• In addition to BT22 -243D, three other core drill holes targeting the depth extension of
mineralization at Beartrack-Arnett were completed in the 2022 program ; two in the Joss
high-grade target area (BT22-241D, which was released on September 12th, 2022, and BT22-
242D, which was released on September 22 nd, 2022) and one between the South Pit and
the Joss (BT22-244D)
• Results for drill hole BT22-244D are expected in December.
1 Drilled width; true widths are estimated to be 40% to 60% of drilled width.
“Today’s results confirm the presence of high-grade gold mineralization in the South Pit area at
Beartrack-Arnett. Similar grades are also present in the Joss area, which extends approximately 1.2
kilometers to the south. Together, the Joss and the South Pit areas encompass some two kilometers
of favourable structure, and, in both areas, we see broad mineralized intersections and higher-
grade zones. Mineralization is vertically dipping and conducive to open pit and underground
mining”, said Hugh Agro, President & CEO. “ Data review is ongoing and follow-up drilling is being
planned”, added Agro.
2
Details:
Detailed results for drill hole BT22-243D released today are presented in the table below:
Hole Number
Area
Azimuth
(deg.)
Dip
(deg.)
From
(m)
To
(m)
Drilled
Width1
(m)
Fire Assay
Gold Grade
(g/t)
BT22-243D South Pit 311 -61 124.4 151.3 26.9 0.64
228.5 232.6 4.1 5.99
Incl. 229.6 232.6 2.9 7.92
257.9 305.3 47.4 2.02
Incl. 259.5 265.5 6.0 2.95
1 True width is estimated to be approximately 40% to 60% of drilled width. Numbers may not add up
due to rounding.
QA/QC Program
Quality Assurance/Quality Control consists of the regular insertion of certified reference materials,
duplicate samples, and blanks into the sample stream. Check samples are submitted to an umpire
laboratory at the end of the drilling program. Sample results are analyzed immediately upon receipt
and all discrepancies are investigated. Samples are submitted to the ALS Geochemistry sample
preparation facility in Twin Falls, Id aho. Gold analyses are performed at the ALS Geochemistry
laboratory in Reno, Nevada or Vancouver, British Columbia, and multi -element geochemical
analyses are completed at the ALS Minerals laboratory in Vancouver, British Columbia. ALS
Minerals is an ISO/IEC 17025:2017 accredited lab.
Gold assays are determined on samples consisting of half drill core by fire assay and AAS on a 30 -
gram nominal sample weight (Au-AA23) for Beartrack, and Fire Assay and AAS on a 50-gram nominal
sample weight (Au -AA24) for A rnett. For shallow holes , targeting leachable mineralization, gold
content is also determined by cyanide leach with an AAS finish on a nominal 30-gram sample weight
(Au-AA13). Multi element geochemical analyses are completed on selected drill holes using the
ME-MS 61M method.
Qualified Person
Steven T. Priesmeyer, C.P.G., Vice President Exploration, Revival Gold Inc., is the Company’s
designated Qualified Person for this news release within the meaning of National Instrument 43 -
101 Standards of Disclosure for Mineral Projects and has reviewed and approved its scientific and
technical content.
3
About Revival Gold Inc.
Revival Gold Inc. is a growth-focused gold exploration and development company. The Company is
advancing the Beartrack-Arnett Gold Project located in Idaho, USA.
Beartrack-Arnett is the largest past -producing gold mine in Idaho. Engineering work has been
initiated on a Preliminary Feasibility Study (“PFS”) for the potential restart of heap leach operations.
Meanwhile, exploration continues, focused on expanding the 2022 In dicated Mineral Resource of
65.0 million tonnes at 1.01 g/t gold containing 2.11 million ounces of gold and Inferred Mineral
Resource of 46.2 million tonnes at 1.31 g/t gold containing 1.94 million ounces of gold (see Revival
Gold NI -43-101 Technical Repor t by Wood plc dated July 13th, 2022 , for further details). The
mineralized trend at Beartrack extends for over five kilometers and is open on strike and at depth.
Mineralization at Arnett is open in all directions.
Revival Gold has approximately 86.9 million shares outstanding and an estimated cash balance of
C$3.4 million as of September 30th, 2022. All figures in this news release are in metric units and in
$US unless stated otherwise. Additional disclosure including the Company’s financial statements,
technical re ports, news releases and other information can be obtained at www.revival-
gold.com or on SEDAR at www.sedar.com.
For further information, please contact:
Hugh Agro, President & CEO or Melisa Armand, Manager, Investor Relations
Telephone: (416) 366-4100 or Email: [email protected]
Cautionary Statement
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
the policies of the TSX Venture Excha nge) accepts responsibility for the adequacy or accuracy of
this news release.
This News Release includes certain "forward -looking statements" which are not comprised of
historical facts. Forward -looking statements include estimates and statements that de scribe the
Company’s future plans, objectives or goals, including words to the effect that the Company or
management expects a stated condition or result to occur. Forward -looking statements may be
identified by such terms as “believes”, “anticipates”, “ex pects”, “estimates”, “may”, “could”,
“would”, “will”, or “plan”. Since forward-looking statements are based on assumptions and address
future events and conditions, by their very nature they involve inherent risks and uncertainties.
Although these statemen ts are based on information currently available to the Company, the
Company provides no assurance that actual results will meet management’s expectations. Risks,
uncertainties, and other factors involved with forward -looking information could cause actual
events, results, performance, prospects, and opportunities to differ materially from those
4
expressed or implied by such forward -looking information. Forward looking information in this
news release includes, but is not limited to, the Company’s objectives, goals or future plans,
statements, exploration results, potential mineralization, the estimation of mineral resources,
exploration and mine development plans, timing of the commencement of operations and
estimates of market conditions. Factors that could cause actual results to differ materially from
such forward -looking information include, but are not limited to failure to identify mineral
resources, failure to convert estimated mineral resources to reserves, the inability to complete a
feasibility study which recommends a production decision, the preliminary nature of metallurgical
test results, delays in obtaining or failures to obtain required governmental, environmental or other
project approvals, political risks, uncertainties relating to the availab ility and costs of financing
needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations
in commodity prices, delays in the development of projects, capital, operating and reclamation
costs varying significantly from estimates and the other risks involved in the mineral exploration
and development industry, an inability to predict and counteract the effects of COVID -19 on the
business of the Company, including but not limited to the effects of COVID -19 on the price of
commodities, capital market conditions, restriction on labour and international travel and supply
chains, and those risks set out in the Company’s public documents filed on SEDAR. Although the
Company believes that the assumptions and factors used in prep aring the forward -looking
information in this news release are reasonable, undue reliance should not be placed on such
information, which only applies as of the date of this news release, and no assurance can be given
that such events will occur in the dis closed time frames or at all. The Company disclaims any
intention or obligation to update or revise any forward-looking information, whether as a result of
new information, future events or otherwise, other than as required by law.