Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RVG.V ·

Revival GOLD Intersects 0.94 G/T GOLD over 54 Meters at Arnett and 20.1 G/T GOLD over 2.1 Meters at Beartrack

Drill Results

1

REVIVAL GOLD

INTERSECTS 0.94 g/t GOLD OVER 54 METERS AT ARNETT AND

20.1 g/t GOLD OVER 2.1 METERS AT BEARTRACK

Toronto, ON – January 14th, 2019 – Revival Gold Inc. (TSXV: RVG, OTCQB: RVLGF) (“Revival Gold”

or the "Company"), a growth -focused gold exploration and development company, announces

results from the final four holes of the Company’s 2018 core drill programs at the Arnett

(“Arnett”) and adjacent Beartrack (“Beartrack”) gold projects located in Lemhi County, Idaho.

Highlights

 AC18-16D and AC18-17D in the Haidee area at Arnett intersected 0.64 g/t Au over 15.3

meters1 and 0.94 g/t Au over 54.3 meters1, respectively;

 BT18-221D in the Joss area at Beartrack intersected 20.1 g/t Au over 2.1 meters 1 within

6.65 g/t Au over 8.2 meters1; and,

 BT18-222D in the South Pit area at Beartrack intersected 1.79 g/t Au over 16.3 meters1.

1 Drilled width; estimates of true width and down-hole positions of mineralization are presented in the

table below.

“AC18-16D and AC18-17D, the last and most northerly two holes drilled along strike in the Haidee

area during the 2018 program at Arnett, intersected significant widths of near surface oxide gold

mineralization,” said Hugh Agro, President & CEO. “At Beartrack, in the Joss area, BT18-221D cut

some of the best gold grades encountered on the project to -date. Together, these results

underscore the exciting potential and broad scope for follow -up exploration activity we see for

Beartrack-Arnett in 2019.”

Details

Results from the final two core holes (AC18-16D and AC18-17D) of the six-hole 2018 program at

Arnett and final two core holes (BT18-221D and BT18-222D) from the fifteen-hole 2018 program

at Beartrack are presented below:

2

Hole

Number

Area

Azimuth

(deg.)

Dip

(deg.)

From

(m)

To

(m)

Drilled

Width

(m)

Est. True

Width1

(m)

Fire Assay

Gold Grade

(g/t)

AC18-16D2 Haidee 065 -55 15.3 30.6 15.3 15.3 0.64

Incl. 23.4 23.7 0.4 0.4 15.4

72.5 94.6 22.1 22.1 0.48

Incl. 86.3 86.9 0.6 0.6 5.03

112.9 124.8 11.9 11.9 0.66

Incl. 122.8 124.8 2.0 2.0 2.35

AC18-17D Haidee 065 -55 42.2 48.2 5.9 5.9 0.96

57.3 70.1 12.8 12.8 2.37

Incl. 69.3 70.1 0.8 0.8 21.0

92.4 146.6 54.3 54.3 0.94

Incl. 138.1 143.6 5.5 5.5 3.53

BT18-221D3 Joss 300 -50 377.6 385.9 8.2 n/a 6.65

Incl. 383.7 385.9 2.1 n/a 20.1

393.5 396.2 2.7 n/a 2.97

BT18-222D South Pit 300 -50 626.2 642.5 16.3 9 1.79

1 True width is estimates in the Haidee area estimated to be approximately equivalent to drilled width. True width

estimates in the South Pit and Ward’s Gulch areas, as well as the area between the South Pit and Joss, are based

on a vertically dipping miner al zone. True width in the Joss area is unknown (n/a). Drill holes typically steepen

during drilling so the inclination of the drill hole at depth may not be the same as the inclination at the collar .

Numbers may not add up due to rounding.

2 Recovery for the interval 122.8 m to 124.6 meters was 40%.

3 Recoveries for the interval s 393.5 meters to 395.0 meters and 395.9 meters to 396.2 meters were 30% and 20%

respectively. The intervals immediately below the upper interval and immediat ely above the lower interval had

recoveries of 0%.

Mineralization in the Haidee area at Arnett remains open along strike to the south and north, as

well as down dip to the west. Mineralization often occurs as visible native gold within oxidized

pyrite which results in highly variable assay values. This nugget effect is present, even when

larger samples sizes (two assay-tonne) are used. For this reason, Revival Gold intends to follow-

up its conventional two assay -tonne fire assays at Haidee with metall ic screen assays of larger -

than-normal pulps.

Figure 1 illustrates a plan view at Arnett showing the mineralized envelope in the Haidee area,

the eleven core holes drilled by Meridian Gold Inc. in 1997 and the six core holes completed by

Revival Gold in 2018.

3

Mineralization at Beartrack remains open to the south of Joss, north along strike between the

South Pit and Ward’s Gulch area and into the North Pit.

Figure 2 illustrates an up-to-date north-west facing long-section view at Beartrack showing the

current Beartrack mineral resource block model (see “Mineral Resource Estimate, Beartrack

Property, Lemhi County, Idaho, United States,” dated July 12th, 2018, for further details) as well

as the location and results of all fifteen drill holes completed at Beartrack in 2018.

A follow-up phase of drilling and metallurgical test work for Beartrack-Arnett is being planned.

Revival Gold expects to initiate preparatory work on an updated resource estimate later this year.

QA/QC Program

Quality Assurance/Quality Control consists of the regular insertion of duplicates, blanks and

certified reference standards into the sample stream. Check samples will be submitted to an

umpire laboratory at the end of the drilling program. Sample results are analyzed immediately

upon receipt and all discrepancies are investigated. Samples are submitted to the ALS Minerals

sample preparation facility in Elko, Nevada. Gold analyses are performed at the ALS Minerals

laboratory in Reno, Nevada and multi element geochemical analyses are completed at the ALS

Minerals laboratory in Vancouver, British Columbia. ALS Minerals is an ISO 17025:2005

accredited lab.

Gold assays for the Beartrack Project are determined by Fire Assay and AAS on a 30-gram nominal

sample weight (Au -AA25). For shallow holes targeting leachable mineralization, gold is also

determined by cyanide leach with an AAS finish on a nominal 30-gram sample weight (Au-AA13).

Multi element geochemical analyses are completed on selected drill holes using the ME -MS 61

method. Sample preparation for the Beartrack Project is using the Prep 31 method , which

involves the preparation of a 250-gram pulp.

Gold assays for the Arnett Project are determined by Fire Assay and AAS on a 50-gram nominal

sample weight (Au-AA24). For some of the Arnett holes, gold is also determined by cyanide leach

with an AAS finish on a nominal 30-gram sample weight (Au-AA13). Multi element geochemical

analyses are completed on selected drill holes using the ME-MS 61 method. Sample preparation

for the Arnett Project is using the Prep 31B method , which involves the preparation of a 1,000 -

gram pulp.

Steven T. Priesmeyer, C.P.G., Vice President Exploration, Revival Gold Inc., is the Company's

designated Qualified Person for this news release within the meaning of National Instrument 43-

101 Standards of Disclosure for Mineral Projects and has reviewed and approved its scientific and

technical content.

4

About Revival Gold Inc.

Revival Gold Inc. is a growth-focused gold exploration and development company. The Company

has the right to acquire a 100% interest in Meridian Beartrack Co., owner of the former producing

Beartrack Gold Project located in Lemhi County, Idaho. Revival also owns rights to a 100% interest

in the neighbouring Arnett Gold Project.

In addition to its interests in Beartrack and Arnett, the Company is pursuing other gold

exploration and development opportunities and holds a 51% interest in the Diamond Mountain

Phosphate Project located in Uintah County, Utah.

Revival Gold has approximately 42 million shares outstanding and had a working capital balance

of $2.3 million as at September 30th, 2018. Additional disclosure of the Company’s financial

statements, technical reports, material change reports, news releases and other information can

be obtained at www.revival-gold.com or on SEDAR at www.sedar.com.

For further information, please visit www.revival-gold.com or contact:

Andrea Totino, Investor Relations Manager, Tel: (416) 366-4100, Email: [email protected]

Cautionary Statement

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this news release.

This News Release includes certain "forward -looking statements" which are not comprised of

historical facts. Forward-looking statements include estimates and statements that describe the

Company’s future plans, objectives or goals, including words to the e ffect that the Company or

management expects a stated condition or result to occur. Forward -looking statements may be

identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”,

“would”, “will”, or “plan”. Since forward -looking statements are based on assumptions and

address future events and conditions, by their very nature they involve inherent risks and

uncertainties. Although these statements are based on information currently available to the

Company, the Company prov ides no assurance that actual results will meet management’s

expectations. Risks, uncertainties and other factors involved with forward -looking information

could cause actual events, results, performance, prospects and opportunities to differ materially

from those expressed or implied by such forward -looking information. Forward looking

information in this news release includes, but is not limited to, the Company’s objectives, goals

or future plans, statements, exploration results, potential mineralization, the estimation of

5

mineral resources, exploration and mine development plans, timing of the commencement of

operations and estimates of market conditions. Factors that could cause actual results to differ

materially from such forward -looking information in clude, but are not limited to failure to

identify mineral resources, failure to convert estimated mineral resources to reserves, the

inability to complete a feasibility study which recommends a production decision, the preliminary

nature of metallurgical t est results, delays in obtaining or failures to obtain required

governmental, environmental or other project approvals, political risks, uncertainties relating to

the availability and costs of financing needed in the future, changes in equity markets, infl ation,

changes in exchange rates, fluctuations in commodity prices, delays in the development of

projects, capital, operating and reclamation costs varying significantly from estimates and the

other risks involved in the mineral exploration and development industry, and those risks set out

in the Company’s public documents filed on SEDAR. Although the Company believes that the

assumptions and factors used in preparing the forward -looking information in this news release

are reasonable, undue reliance should not be placed on such information, which only applies as

of the date of this news release, and no assurance can be given that such events will occur in the

disclosed time frames or at all. The Company disclaims any intention or obligation to update or

revise any forward-looking information, whether as a result of new information, future events or

otherwise, other than as required by law.

6

Figure 1 – Arnett Project Haidee Area Plan View (January 14th, 2019)

7

Figure 2 - Beartrack Project Block Model Long Section North-West View (January 14th, 2019)