Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RVG.V ·

Revival GOLD Files Ni 43-101 Mineral Resource Technical Report

Resource Estimates Technical Reports (NI 43-101)

1

REVIVAL GOLD FILES NI 43-101

MINERAL RESOURCE TECHNICAL REPORT

Toronto, ON – July 14th, 2022 – Revival Gold Inc. (TSXV: RVG, OTCQX: RVLGF) (“Revival Gold” or

the “Company”), has filed on SEDAR a technical report prepared in accordance with National

Instrument 43 -101 (“NI 43 -101”) on the Beartrack -Arnett Go ld Project (“Beartrack”), titled

“NI 43-101 Technical Report Mineral Resource Update of the Beartrack – Arnett Gold Project, Lemhi

County, Idaho, USA” (the “Technical Report”). The Technical Report supports disclosure made by

the Company in its news release dated May 16 th, 2022, titled “Revival Gold Delivers Impressive

Resource Update at Beartrack-Arnett”. There are no material differences in the mineral resources

contained in the Technical Report from those disclosed in the May 16th, 2022, news release.

The updated Mineral Resource estimate was completed by Wood plc (“Wood”) based on drilling

results through the end of 2021 and contains:

• An Indicated Mineral Resource of 65.0 million tonnes at 1.01 g/t gold containing

2.11 million ounces of gold1, an increase of 56% over the 2020 Indicated Mineral Resource2;

and,

• An Inferred Mineral Resource of 46.2 million tonnes at 1.31 g/t gold containing 1.94 million

ounces of gold1, an increase of 19% over the 2020 Inferred Mineral Resource2.

1 Estimates based on a gold price of $1,800/ounce. All figures in this press release are in Metric units and in $US unless

stated otherwise.

2 See Revival Gold’s November 17th, 2020, press release.

The full Report prepared by Wood of Oakville, Canada and Boise, Idaho, and dated July 13th, 2022,

with an effective date of May 12th, 2022, can be found on the Company’s website at www.revival-

gold.com and on SEDAR under the Company’s issuer profile at www.sedar.com.

Qualified Persons

Steven T. Priesmeyer, C.P.G., Vice President Exploration, and John P.W. Meyer, P.Eng., Vice

President Engineering and Development are the Company’s designated Qualified Person s for this

news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral

Projects and have reviewed and approved its scientific and technical content. Mr. Priesmeyer’s

review of the Mineral Resource estimate focused on the geological representativity of the

numerical models, including review of the laboratory and field data that support the models, while

Mr. Meyer’s review focused on verifying that open pit and underground mining shapes that

constrain the Mineral Resources, and the parameters used to develop the mining shapes, were

2

appropriate.

About Revival Gold Inc.

Revival Gold Inc. is a growth-focused gold exploration and development company. The Company is

advancing the Beartrack-Arnett Gold Project located in Idaho, USA.

Beartrack-Arnett is the largest past -producing gold mine in Idaho. Engineering work has been

initiated on a Preliminary Feasibility Study (“PFS”) for the potential restart of heap leach operations.

Meanwhile, exploration continues, focused on expanding the 2022 Indicated Mineral Resource of

65.0 million tonnes at 1.01 g/t gold containing 2.11 million ounces of gold and Inferred Mineral

Resource of 46.2 million tonnes at 1.31 g/t gold containing 1.94 million ounces of gold (see Revival

Gold NI-43-101 Technical Report dated July 13th 2022 for further details). The mineralized trend at

Beartrack extends for over five kilometers and is open on strike and at depth. Mineralization at

Arnett is open in all directions.

Revival Gold has approximately 86.9 million shares outstanding and an estimated cash balance of

C$6.5 million as of June 30 th, 2022. All figures in this press release are in metric units and in $US

unless stated otherwise. Additional disclosure including t he Company’s financial statements,

technical reports, news releases and other information can be obtained at www.revival-

gold.com or on SEDAR at www.sedar.com.

For further information, please contact:

Hugh Agro, President & CEO or Melisa Armand, Investor Relations

Telephone: (416) 366-4100 or Email: [email protected]

Cautionary Statement

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this news release.

This News Release includes certain "forward -looking statements" which are not comprised of

historical facts. Forward -looking statements include estimates and statements that describe the

Company’s future plans, objectives or goals, including words to the effect that the Company or

management expects a stated condition or result to occur. Forward- looking statements may be

identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”,

“would”, “will”, or “plan”. Since forward-looking statements are based on assumptions and address

future events and conditions, by their very nature they involve inherent risks and uncertainties.

Although these statements are based on information currently available to the Company, the

3

Company provides no as surance that actual results will meet management’s expectations. Risks,

uncertainties, and other factors involved with forward- looking information could cause actual

events, results, performance, prospects, and opportunities to differ materially from those

expressed or implied by such forward -looking information. Forward looking information in this

news release includes, but is not limited to, the Company’s objectives, goals or future plans,

statements, exploration results, potential mineralization, the estimation of mineral resources,

exploration and mine development plans, timing of the commencement of operations and

estimates of market conditions. Factors that could cause actual results to differ materially from

such forward- looking information include, b ut are not limited to failure to identify mineral

resources, failure to convert estimated mineral resources to reserves, the inability to complete a

feasibility study which recommends a production decision, the preliminary nature of metallurgical

test results, delays in obtaining or failures to obtain required governmental, environmental or other

project approvals, political risks, uncertainties relating to the availability and costs of financing

needed in the future, changes in equity markets, inflation, c hanges in exchange rates, fluctuations

in commodity prices, delays in the development of projects, capital, operating and reclamation

costs varying significantly from estimates and the other risks involved in the mineral exploration

and development industr y, an inability to predict and counteract the effects of COVID- 19 on the

business of the Company, including but not limited to the effects of COVID- 19 on the price of

commodities, capital market conditions, restriction on labour and international travel an d supply

chains, and those risks set out in the Company’s public documents filed on SEDAR. Although the

Company believes that the assumptions and factors used in preparing the forward- looking

information in this news release are reasonable, undue reliance should not be placed on such

information, which only applies as of the date of this news release, and no assurance can be given

that such events will occur in the disclosed time frames or at all. The Company disclaims any

intention or obligation to update or revise any forward-looking information, whether as a result of

new information, future events or otherwise, other than as required by law.