Carolina Rush Announces Filing of Maiden Mineral Resource Technical Report for Brewer Gold-Copper Project
Carolina Rush Announces Filing of Maiden
Mineral Resource Technical Report for Brewer
Gold-Copper Project
Toronto, Ontario--(Newsfile Corp. - May 2, 2025) - Carolina Rush Corporation (TSXV: RUSH) (OTCQB:
PUCCF) ("Carolina Rush," "Rush" or the "Company") announced that it has filed an independent
technical report (the "Technical Report") prepared in accordance with National Instrument 43-101
Standards of Disclosure for Mineral Projects ("NI 43-10") in respect to the maiden mineral resource
estimate for the Company's Brewer Gold-Copper deposit ("Brewer deposit"), located in Chesterfield
County, South Carolina.
The Technical Report, titled "NI 43-101 Technical Report and Mineral Resource Estimate, Brewer Gold-
Copper Project, Jefferson, South Carolina, USA", with an effective date of March 20, 2025, and an issue
date of May 2, 205, was prepared under National Instrument 43-101 ("NI 43-101") standards by
Qualified Persons (QP), Patrick O. Quigley and Patrick J. Hollenbeck.
The Brewer Gold-Copper Project is located at the past-producing, 397-hectare Brewer Gold Mine
property in Chesterfield County, South Carolina, 13 kilometers along trend from the producing Haile Gold
Mine (
https://oceanagold.com/operation/haile/
). The proximity of the Brewer Gold-Copper Project to the
Haile Gold Mine does not imply that mineralization or results from Haile are indicative of mineralization at
Brewer.
Table 1: Brewer in Situ Mineral Resource Statement (0.5 g/t Au cutoff):
Average Value
Material Content
I&I
Mass
Au
Cu
Au
Cu
thousand tonnes
g/t
ppm
thousand oz
thousand lbs.
Indicated
6,022
1.04
1,266
202
16,811
Inferred
7,805
0.84
460
210
7,908
Differences may occur in totals due to rounding.
(1)
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
(2)
The estimate of Mineral Resources may be materially affected by environmental, permitting, legal,
title, taxation, socio-political, marketing, or other relevant issues.
(3)
The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an
Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected
that the majority of the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource
with continued exploration.
(4)
The Mineral Resources in this report were estimated using the Canadian Institute of Mining,
Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and
Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM
Council.
(5)
A NI 43-101 Technical Report supporting the Maiden Mineral Resource Estimate is filed on SEDAR+
at
www.sedarplus.ca
.
Investors are encouraged to review the full report, which will provide further details
on key assumptions, parameters, and risks associated with the Mineral Resource Estimate.
Table 2: Brewer Inferred Backfill Mineral Resource Statement:
Average Value
Material Content
Backfill Model
Mass
Au
Cu
Au
Cu
thousand
tonnes
g/t
ppm
thousand oz
thousand
lbs.
HLP 1-4
2,000
0.17
94
11
414
HLP 5
1,579
0.49
863
25
3,007
HLP 6
2,429
0.22
292
17
1,561
Waste Rock
5,159
0.49
343
80
3,897
B6 (Waste Rock)
733
0.26
105
6
171
Total
11,900
0.36
345
139
9,050
Differences may occur in totals due to rounding.
(1)
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
(2)
The estimate of Mineral Resources may be materially affected by environmental, permitting, legal,
title, taxation, socio-political, marketing, or other relevant issues.
(3)
The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an
Indicated Mineral Resource and must not be converted to a Mineral Reserve.
(4)
The Mineral Resources in this report were estimated using the Canadian Institute of Mining,
Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and
Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM
Council.
(5)
Details on the metallurgical properties and processing methods required to extract gold and copper
from the backfill material have not been undertaken.
As such, the Backfill resource is considered
theoretical and additional studies are required to report the inferred resources at a higher level of
confidence.
No cutoff grade was applied to the backfill mineral resource.
(6)
A NI 43-101 Technical Report supporting the Maiden Mineral Resource Estimate is filed on SEDAR+
at
www.sedarplus.ca
.
Investors are encouraged to review the full report, which will provide further details
on key assumptions, parameters, and risks associated with the Mineral Resource Estimate.
Qualified Person
The technical information in this news release has been prepared in accordance with Canadian
regulatory requirements as set out in NI 43-101 and reviewed and approved by Patrick Quigley, MSc,
CPG-12116, the Company's Senior Geologist and Exploration Manager and a Qualified Person as
defined by NI 43-101.
About Carolina Rush
Carolina Rush Corporation (TSXV: RUSH) (OTCQB: PUCCF) is a U.S.-focused exploration company
100% committed to advancing the
Brewer Gold-Copper Project
in South Carolina-a large,
underexplored system with the potential to host both near-surface epithermal and deep porphyry-style
mineralization. Located just 13 km from OceanaGold's producing Haile Gold Mine, Brewer is a past-
producing operation now under modern exploration.
A
maiden NI 43-101 mineral resource estimate
with an effective date of May 2, 2025, outlines
202,000
ounces of gold in the indicated category (6.0 Mt @ 1.04 g/t Au) plus another 210,000
ounces of gold in the inferred category (7.8 Mt @ 0.84 g/t Au)
, with significant expansion potential
in multiple directions. In addition, a resource estimate of the backfill material contained in the former
open pit estimates
139,000 ounces of gold in the inferred category (11.9 Mt @ 0.36 g/t Au).
Supported by a seasoned technical team, established infrastructure, and strong community
relationships, Carolina Rush is aggressively advancing Brewer's near-surface epithermal and deep
porphyry potential.
For further information, please contact:
Layton Croft, President and CEO
or
Jeanny So, Corporate Communications Manager
E:
T: +1.647.202.0994
For additional information please visit our new website at
http://www.TheCarolinaRush.com/
and our X
feed:
https://twitter.com/TheCarolinaRush
.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
This news release contains forward-looking information which is not comprised of historical facts.
Forward-looking information is characterized by words such as "plan", "expect", "project", "intend",
"believe", "anticipate", "estimate" and other similar words, or statements that certain events or
conditions "may" or "will" occur. This news release contains forward-looking information pertaining to
the Company's 2025 Maiden MRE; that the mineral resource remains open at depth, the potential for
future MRE growth from deeper drilling, and/or future exploration. Forward-looking information
involves risks, uncertainties and other factors that could cause actual events, results, and
opportunities to differ materially from those expressed or implied by such forward-looking information.
Factors that could cause actual results to differ materially from such forward-looking information
include, but are not limited to, changes in the state of equity and debt markets, fluctuations in
commodity prices, delays in obtaining required regulatory or governmental approvals, and other risks
involved in the mineral exploration and development industry, including those risks set out in the
Company's management's discussion and analysis as filed under the Company's profile at
www.sedarplus.ca
. Forward-looking information in this news release is based on the opinions and
assumptions of management considered reasonable as of the date hereof, including that all
necessary governmental and regulatory approvals will be received as and when expected. Although
the Company believes that the assumptions and factors used in preparing the forward-looking
information in this news release are reasonable, undue reliance should not be placed on such
information. The Company disclaims any intention or obligation to update or revise any forward-
looking information, other than as required by applicable securities laws.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/250648