Further High-Grade Copper and GOLD Mineralisation Identified at Chanach Announcement to the Toronto Stock Exchange and Australian Securities Exchange

Exploration Programs

Not for release to US wire services or distribution in the United States

FURTHER HIGH-GRADE COPPER AND GOLD

MINERALISATION IDENTIFIED AT CHANACH

ANNOUNCEMENT TO THE TORONTO STOCK EXCHANGE

AND AUSTRALIAN SECURITIES EXCHANGE

14 DECEMBER 2023

Highlights:

 New results confirm multiple styles of mineralisation and more encouraging

gold and copper grades along 6.5km of skarns and new structures

 High-grade trench sampling assays include:

o 17m @ 5.13g/t Au and 0.78% Cu from Cut 6

o 3m @ 2.52g/t Au and 10.48% Cu from Cut 7

o 11m @ 1.29g/t Au (including 1m @ 3.13g/t Au and 1.03% Cu) from Cut 8

o 3m @ 4.15% Cu from Cut 8

 Chanach demonstrates clear potential to host both a high- grade, large

Copper – Gold Porphyry Skarn system, combined with a high- grade

epithermal gold system

 Latest exploration program at Chanach included ground truthing, targeted

soil sampling, the digging of seven dozer cut trenches across the 6.5km

skarn and outcropping quartz and a magnetic survey

 Results from t he magnetic data in the eastern end of the tenement has a

relatively quiet texture with some distinctive features that clearly show the

geometries of folded lithologies and locations of structural features, along

which known mineralisation is aligned

 Results from the geochemistry show large areas of anomalism (+0.05ppm

Au and +0.01% Cu) both in gold and copper stretching over the majority of

the identified structures

 Mabilo Project in the Philippines continues to advance on-track, recent

discussions with committed local partner focused on moving the project

into development

 Budgets for the Stage 1 Direct Shipping Operation (“DSO”) are being

finalised and it is expected that discussions with financiers will re-

commence early in 2024

The Board of RTG Mining Inc. (“RTG”, or the “Company”) (TSX Code: RTG, ASX Code:

RTG) is pleased to provide an update on recent exploration activities completed at the

Company’s 90% owned Chanach Gold & Copper Project (Chanach) in the Kyrgyz

Republic.

Recent exploration activities at Chanach have included ground truthing, the collection of

1,154 soil samples concentrating on 6.5km of skarn and new structures identified in the

eastern end of the tenement in last year’s structural survey, the digging of seven dozer

cut trenches across the identified skarn and outcropping quartz and a magnetic survey

over the tenement.

Management Commentary:

Commenting on these positive results, RTG’s CEO Justine Magee said : “These

results continue to build our confidence that Chanach may be a similar opportunity to the

Mabilo Project with strong potential to evolve into both a high-grade, large Copper – Gold

Porphyry Skarn system, combined with a high-grade epithermal gold system. The results

from the magnetic surveys have correlated well with our high grade trench sampling

results providing a much stronger understanding of the significant scale and potential of

the Chanach Project. The plan is to follow up with a 3DIP survey and a drilling program

in the next field season.

In addition to the continued excellent results coming from Chanach, the Mabilo Project in

the Philippines continues to progress well with updated budgets for the planned DSO start

up expected to be finalised shortly. Importantly, early in the new year this will allow the

team to quickly focus on updates on finance offers from the various parties who have

continued to express a desire to be involved in the financing of the Mabilo Project.”

High-Grade Trench Sampling Results:

• 17m @ 5.13g/t Au and 0.78% Cu from Cut 6

• 3m @ 2.52g/t Au and 10.48% Cu from Cut 7

• 1m @2.25% Cu from Cut 7

• 2m @ 2.45% Cu from Cut 7

• 2m @ 1.13% Cu from Cut 7

• 11m @ 1.29g/t Au (including 1m @ 3.13g/t Au and 1.03% Cu) from Cut 8

• 4m @ 0.8% Cu from Cut 8

• 3m @ 4.15% Cu from Cut 8

• 3m @ 0.83g/t Au and 0.88% Cu from Cut 8

• 1m @ 1.32g/t Au from Cut 8

• 1m @ 1.13% Cu from Cut 8

• 1m @ 0.86% Cu from Cut 8

• 1m @ 0.72% Cu from Cut 8

Grades above 0.7g/t Au and 0.3% Cu have been included in the High-Grade Sampling Results

Results from dozer cuts and the soil sampling have been processed at the fully accredited

Information Research Centre Laboratory in Kara Balta in the Kyrgyz Republic with some

results still pending.

Dozer Cut 6 inter cepted broad high-grade mineralisation ( quartz, chalcopyrite, pyrite,

malachite, azurite, calcite) in a geological structure consisting of fractured sandstone with

limonite along the fractures.

Dozer Cuts 7 and 8 interc epted multiple zones of high- grade mineralisation (malachite,

azurite, magnetite, pyrite, chalcopyrite, limonite, hematite, garnets, serpentenite, epidote

and quartz) within the skarn zone.

Dozer Cuts 9 to 12 showed lower grades but was impacted by the depth of sedimentary

cover sitting on top of the skarn. These anomalies will be tested further in next field

season by digging deeper trenches.

Magnetic Survey

The magnetic survey was flown with drones by Geoscan Ltd on 25m line spacing at an

altitude of 50m. The data collected is being processed by Southern Geoscience

Consultants in Perth, whilst the full interpretation is still being worked on, initial results at

the eastern end show the magnetic data has a relatively quiet texture with some

distinctive features that clearly show the geometries of folded lithologies and locations of

structural features, along which known mineralization is aligned (See Figure 3 below).

The drone magnetic data will be integrated with all other geological datasets to yield

precise target locations for further detailed exploration in the next field season.

Geochemistry Survey

Detailed soil sampling on a 50m grid was conducted over 7km of identified structures

within the tenement. The results show continuous zones of anomalism for gold and

copper (see Figure 2 below) that coincide with key structures identified in the Structural

Survey undertaken by O. V. Vaulin in 2022 and further supported by the recent magnetic

survey. The geochemistry also indicated zones not previously identified which will be

tested in next year’s field season.

Figure 1: Tenement Map showing location of latest Trenches and Mapped Skarn Structure.

Figure 2: Tenement Map showing anomalous geochemical contours for copper and gold.

Figure 3: Magnetic Response of Eastern End of Tenement Showing Structure Definition Identified in the Structural

Survey Undertaken by O. V. Vaulin in 2022, Coincident with High-Grade Copper and Gold and Magnetic Features.

Figure 4: Tenement Map Showing Different Mineralised Zones with Coincident High- Grade Outcropping Copper

and Gold Results

ABOUT RTG MINING INC

RTG Mining Inc. is a mining and exploration company listed on the main board of the

Toronto Stock Exchange and the Australian Securities Exchange. RTG is currently

focused primarily on progressing the Mabilo Project to start-up with its new partners, the

Villar Family. The team has secured a mining permit for the Project, with a view to moving

quickly and safely to a producing gold and copper company.

The Chanach Project, although earlier stage, is advancing well and is believed to have

strong potential to be similar to or better than the Mabilo Project, with both a high-grade,

large Copper – Gold Porphyry Skarn system, combined with a high-grade epithermal gold

system.

RTG also has a number of exciting new opportunities including the Panguna Project in

Bougainville, which it remains committed to while also considering further new business

development opportunities.

RTG has an experienced management team which has to date developed seven mines

in five different countries, including being responsible for the development of the Masbate

Gold Mine in the Philippines through CGA Mining Limited. RTG has some of the most

respected international institutional investors as shareholders including Franklin

Templeton, Equinox Partners and Sun Valley.

ENQUIRIES

President & CEO – Justine Magee

Tel: +61 8 6489 2900

Email: [email protected]

US Investor Relations Contact Australia Investor and Media Contact

Jaime Wells: +1 970 640 0611 Sam Burns: +61 400 164 067

[email protected] [email protected]

COMPLIANCE STATEMENT

Date: 14 October 2023

Authorised for release by: By the Board of Directors

QUALIFIED PERSON AND COMPETENT PERSON STATEMENT

The information in this release that relates to Exploration Results and Mineral Resource Estimates

of the Chanach Project is based upon information compiled, reviewed and approved by Viktor

Zabolotny who is a Qualified Person under National Instrument 43-101 – Standards of Disclosure

for Mineral Projects (“NI 43 -101”) and a Competent Person as defined in the 2012 Edition of the

‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’

who is a Member and Chartered Professional of the Australian Institute of Mining and Metallurgy

and a Member of the Australian Institute of Geoscientists. Viktor Zabolotny is employed by BW

Three Holdings Ltd and is a consultant to RTG. Viktor Zabolotny has sufficient experience that is

relevant to the style of mineralisation and type of deposit under consideration and to the activity

being undertaken to qualify as a Competent Person and a Qualified Person for the purposes of NI

43-101. Viktor Zabolotny consents to the inclusion in the release of the matters based on her

information in the form and the context in which it appears.

The information in this release that relates to Exploration Targets of the Chanach Project is based

upon information compiled, reviewed and approved by Greg Hall who is a Qualified Person under

NI 43-101 and a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for

Reporting of Exploration Results, Mineral Resources and Ore Reserves’ who is a Member and

Chartered Professional of the Australian Institute of Mining and Metallurgy and a Member of the

Australian Institute of Geoscientists. Greg Hall is employed by Golden Phoenix International Pty

Ltd and is a consultant to RTG. Greg Hall has sufficient experience that is relevant to the style of

mineralisation and type of deposit under consideration and to the activity being undertaken to

qualify as a Competent Person and a Qualified Person for the purposes of NI 43- 101. Greg Hall

consents to the inclusion in the release of the matters based on his information in the form and the

context in which it appears.

The information in this release that relates to areas outside of exploration results, Mineral

Resources, Mineral Reserves and Metallurgy and Processing is based on information prepared by

or under the supervision of Mark Turner, who is a Qualified Person and Competent Person. Mark

Turner is a Fellow of the Australasian Institute of Mining and Metallurgy and is employed by RTG

Mining Inc, the Company. Mark Turner has sufficient experience that is relevant to the information

under consideration and to the activity which he is undertaking to qualify as a Competent Person

as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,

Mineral Resources and Ore Reserves” and to qualify as a “Qualified Person” under National

Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43- 101”). Mark Turner has

verified the data disclosed in this release. Mark Turner consents to the inclusion in the release of

the matters based on his information in the form and context in which it appears.

For the ASX Feasibility Study announcement including JORC tables please refer to the RTG

Mining website (www.rtgmining.com) and on the ASX, under announcements (www.asx.com.au).

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS

The Toronto Stock Exchange has not reviewed nor does it accept responsibility for the accuracy

or adequacy of this press release, which has been prepared by management.

This announcement includes certain “forward-looking statements” within the meaning of Canadian

securities legislation including, among others, statements made or implied relating to the

interpretation of exploration results, accuracy of mineral resource and mineral reserve estimates,

parameters and assumptions used to estimate mineral reserves and mineral resources, realization

of mineral reserve and mineral resource estimates, estimated economic results of the Mabilo

Project, future operational and financial results, including estimated cashflow and the timing

thereof, estimated expenditures, expansion, exploration and development activities and the timing

thereof, including expectations regarding the DSO, plans for progressing Stage 2 development,

completion of a debt funding package, the negotiation of contracts for start up works and offtake

arrangements and the completion of merged documentation, RTG’s objectives, strategies to

achieve those objectives, RTG’s beliefs, plans, estimates and intentions, and similar statements

concerning anticipated future events, results, circumstances, performance or expectations. All

statements, other than statements of historical fact, included herein, are forward- looking

statements. Forward looking statements generally can be identified by words such as “objective”,

“may”, “will”, “expected”, “likely”, “intend”, “estimate”, “anticipate”, “believe”, “should”, “plans”, or

similar expressions suggesting future outcomes or events. Forward- looking statements involve

various risks and uncertainties and are based on certain factors and assumptions. There can be

no assurance that such statements will prove to be accurate, and actual results and future events

could differ materially from those anticipated in such statements. Important factors that could

cause actual results to differ materially from RTG’s expectations include uncertainties related to

fluctuations in gold and other commodity prices and currency exchange rates; uncertainties

relating to interpretation of drill results and the geology, continuity and grade of mineral deposits;

uncertainty of estimates of capital and operating costs, recovery rates, production estimates and

estimated economic return; the need for cooperation of government agencies in the development

of RTG’s mineral projects; the need to obtain additional financing to develop RTG’s mineral

projects; the possibility of delay in development programs or in construction projects and

uncertainty of meeting anticipated program milestones for RTG’s mineral projects and other risks

and uncertainties as discussed in RTG’s annual report for the year ended December 31, 2022 and

detailed from time to time in our other filings with the Canadian securities regulatory authorities

available at www.sedar.com. The forward‐ looking statements made in this announcement relate

only to events as of the date on which the statements are made. RTG will not release publicly any

revisions or updates to these forward‐ looking statements to reflect events, circumstances or

unanticipated events occurring after the date of this announcement except as required by law or

by any appropriate regulatory authority.

NOT FOR RELEASE OR DISTRIBUTION IN THE UNITED STATES

This announcement has been prepared for publication in Canada and Australia and may not be

released to US wire services or distributed in the United States. This announcement does not

constitute an offer to sell, or a solicitation of an offer to buy, securities in the United States or any

other jurisdiction. Any securities described in this announcement have not been, and will not be,

registered under the US Securities Act of 1933, as amended (the “US Securities Act”), or any state

securities laws, and may not be offered or sold in the United States except in transactions exempt

from, or not subject to, registration under the US Securities Act and applicable US state securities

laws.

Appendix 1 – JORC Code, 2012 Edition – Table 1: Chanach Project

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code Explanation Commentary

Sampling

Techniques

• Nature and quality of sampling (e.g. cut

channels, random chips, or specific

specialised industry standard

measurement tools appropriate to the

minerals under investigation, such as

down hole gamma sondes, or handheld

XRF instruments, etc.). These

examples should not be taken as

limiting the broad meaning of sampling

• Include reference to measures taken to

ensure sample representivity and the

appropriate calibration of any

measurement tools or systems used.

• Aspects of the determination of

mineralisation that are Material to the

Public Report.

• In cases where ‘industry standard’ work

has been done this would be relatively

simple (e.g. ‘reverse circulation drilling

was used to obtain 1 m samples from

which 3 kg was pulverised to produce a

30 g charge for fire assay’). In other

cases more explanation may be

required, such as where there is coarse

gold that has inherent sampling

problems. Unusual commodities or

mineralisation types (e.g. submarine

nodules) may warrant disclosure of

detailed information.

• Sample bags were visually inspected for volume

to ensure minimal size variation. Sampling was

carried out under standard industry protocols and

QAQC procedures.

• A 50-gram sample is digested for gold analysis by

Fire Assay and Atomic Adsorption

Spectrophotometry (AAS), and for copper analysis

via pressed pellet X-ray florescence (XRF).

• A 0.2-gram sample is digested for multi-element

analysis by Fire Assay and Inductive Coupled

Plasma (ICP) using Mass Spectroscopy (MS) or

Optical Emission Spectroscopy (OES).

• The trench samples in 2023 were undertaken by an

experienced geologist who determined from

mapping of bedrock and trenches the areas to be

sampled.

• All samples were dried and crushed to 90%

passing 2mm. A 300g split was taken and

pulverised to 80% passing 74 microns. The

samples were analysed using Atomic Absorption.

Drilling

Techniques

• Drill type (e.g. core, reverse circulation,

open-hole hammer, rotary air blast,

auger, Bangka, sonic, etc.) and details

(e.g. core diameter, triple or standard

tube, depth of diamond tails, face-

sampling bit or other type, whether core

is oriented and if so, by what method,

etc.).

• N/A

Drill sample

recovery

• Method of recording and assessing

core and chip sample recoveries and

results assessed.

• Measures taken to maximise sample

recovery and ensure representative

nature of the samples.

• Whether a relationship exists between

sample recovery and grade and

whether sample bias may have

occurred due to preferential loss/gain of

fine/coarse material.

• N/A

Logging • Whether core and chip samples have

been geologically and geotechnically

logged to a level of detail to support

appropriate Mineral Resource

estimation, mining studies and

metallurgical studies.

• Whether logging is qualitative or

• Logging is considered qualitative.

• All 2023 trench grab samples were logged and

recorded on primary documents and maps.