Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RTE.V ·

BMEX Gold Reviews Dunlop Bay Ground EM Survey Results and Begins Field Campaign

Exploration Programs Sampling & Geoscience Results

BMEX Gold Reviews Dunlop Bay Ground EM

Survey Results and Begins Field Campaign

Vancouver, British Columbia--(Newsfile Corp. - July 7, 2022) - BMEX Gold Inc.

(TSXV: BMEX)

(

OTCQB: MRIRF) (FSE: 8M0) ("BMEX

"

or the

"

Company")

is pleased to announce the final

interpretation of a ground EM survey (Fixed Loop Transient Electro-Magnetic survey or FL-TDEM)

performed over the Dunlop Bay Property ('Dunlop Bay" or the "Property") in the Abitibi region, Québec,

Canada. This survey aimed to define drilling targets in the vicinity of the Dunlop Bay Ouest showing (also

known as Ghislau showing). Three conductivity anomalies (ANO1, ANO2 and ANO3) were identified,

forming an East-North-East trending conductive corridor (Figure 1).

Robert Pryde, President of BMEX Gold, commented: "The results from the FL-TDEM survey are very

encouraging as they suggest the continuity of the known Dunlop Bay Ouest showing westward. Amongst

the three anomalies, ANO1 and ANO2 are strong from early to late time channels and have modelled

plates with high conductance which might reflect the presence of massive sulphide bodies. Also, ANO1

was never tested by drilling. I am pleased to announce that this zone will be further investigated during

our field program starting in the next few weeks. In addition to these areas, our previous data compilation

and analysis of historical work has identified several high-grade gold targets as well as gold rich

massive sulphide targets on the Dunlop Property."

Figure 1 : 2022 ground EM anomalies over Dunlop Bay Ouest showing and summer 2022 field focus

To view an enhanced version of Figure 1, please visit:

https://images.newsfilecorp.com/files/5785/130165_20e52432642eaa61_001full.jpg

The Company has engaged Laurentia Exploration to complete a field program over Dunlop Bay

Property. This program will be starting in July, aiming to 1) find the continuity of existing mineralization, 2)

enhance the understanding of the various structural and geological controls over the known occurrences

and 3) discover new showings. Recent data compilation work has defined several structural trends

related to the known Dunlop Bay showing, that need to be confirmed on the field.

The field program will focus on confirming, locating and understanding the systems in order to generate

drill targets that will be tested by a 3,000 meters program scheduled for Fall 2022 (

see April 26th news

release

). Data compilation to date also identified high grade surface gold mineralization including the

Bella (historical grab samples returned up to 273.71 g/t Au) and Omela veins (historical grab samples

returned up to 14.48 g/t Au) (Figure 1, GM16102). Minimal historical work has been completed on these

targets and they have not been drilled.

In addition, the Mont Laurier Est showing extension on BMEX ground will also be investigated during this

field work season. Indeed, a recent re-interpretation of historical prospection maps and recent detailed

imagery has revealed that Cu-Au-Ag rich massive sulphides can be found in this area. Finally,

systematic outcrop description and mineralization sampling will be undertaken on the rest of the

property, and especially around the Baie Dunlop showing to confirm the above-mentioned structural

model.

The King Tut Project also received an adjusted geological and structural interpretation (Figure 2), based

on the late 2021 drilling campaign (

see April 26th news release

) and the detailed drone-born magnetic

data. A major fold hinge seems to control the location of the heart of Tut gold system; this hinge has not

been drilled to the west of the known showing. Several other potential fold axis' were also interpreted on

King Tut Project. Confirming these structural theories will require follow up field work, to begin late this

summer.

Figure 2 : King Tut adjusted geological and structural interpretation

To view an enhanced version of Figure 2, please visit:

https://images.newsfilecorp.com/files/5785/130165_20e52432642eaa61_002full.jpg

Qualified Person

Maxime Bouchard, Geo, M.Sc. (OGQ #1752), an independent Qualified Person as defined by Canadian

NI 43-101 standards, has reviewed and approved the geological information reported in this news

release. The drilling campaign and the quality control program have been planned and supervised by

Maxime Bouchard. Core logging and sampling were completed by Laurentia Exploration. The quality

assurance and quality control protocol include insertion of one blank and one standard every 20

samples, in addition to the regular insertion of blank, duplicate, and standard samples accredited by

ALS Canada Ltd. during the analytical process. Gold values are estimated by fire assay with finish by

atomic absorption. The Qualified Person has not completed sufficient work to verify the historic

information on the Property, particularly in regards to historical drill results. However, the Qualified

Person believes that drilling and analytical results were completed to industry standard practices. The

information provides an indication of the exploration potential of the Property but may not be

representative of expected results.

About BMEX Gold Inc.

BMEX Gold Inc. is a junior Canadian mining exploration company with the primary objective to acquire,

explore, and develop viable gold and base metal projects in the mining-friendly jurisdiction of Quebec,

Canada. BMEX is currently fully focused on their 100% interest in the two projects, both located in the

prolific Abitibi greenstone belt:

King Tut Project

consists of 120 contiguous claims on 5,206 hectares

Dunlop Bay Project

consists of 76 mineral claims that cover 4,226 hectares

BMEX common shares trade under the symbol "BMEX" on the TSX-V and under the symbol 8M0 on the

Frankfurt Exchange.

For further information please contact:

BMEX Gold Inc.

Robert Pryde, President

Tel: +1 (403) 478 6042

Email:

[email protected]

Dylan Sidoo, Business Development

Tel: +1 (604) 423 4499

Email:

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. No stock exchange, securities commission or other regulatory authority has approved or

disapproved the information contained herein.

This news release contains "forward-looking statements" and "forward-looking information" (as defined

under applicable securities laws), based on management's best estimates, assumptions, and current

expectations. Such statements include but are not limited to, statements with respect to the plans for

future exploration and development of the King Tut and Dunlop Bay properties and the acquisition of

additional exploration projects. Generally, these forward-looking statements can be identified by the

use of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts" ,

"anticipates" "plans", "anticipates", "believes", "intends", "estimates", "projects", "aims", "potential",

"goal", "objective", "prospective", and similar expressions, or that events or conditions "will", "would",

"may", "can", "could" or "should" occur. These statements should not be read as guarantees of future

performance or results. Such statements involve known and unknown risks, uncertainties and other

factors that may cause actual results, performance or achievements to be materially different from

those expressed or implied by such statements, including but not limited to: risks related to the King

Tut and Dunlop Bay projects; risks related to general economic conditions, actual results of current

exploration activities, unanticipated reclamation expenses; changes in project parameters as plans

continue to be refined; fluctuations in prices of metals including gold; increases in market prices of

mining consumables, possible variations in resource estimates, grade or recovery rates; failure of

plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes,

claims and limitations on insurance coverage and other risks of the mining industry; delays in the

completion of exploration, development or construction activities, changes in national and local

government regulation of mining operations, tax rules and regulations, and political and economic

developments in areas in which the Company operates. Although the Company has attempted to

identify important factors that could cause actual results to differ materially from those contained in

forward-looking statements, there may be other factors that cause results not to be as anticipated,

estimated or intended. There can be no assurance that such statements will prove to be accurate, as

actual results and future events could differ materially from those anticipated in such statements. The

forward-looking statements and forward-looking information are made as of the date hereof and are

qualified in their entirety by this cautionary statement. The Company disclaims any obligation to

revise or update any such factors or to publicly announce the result of any revisions to any forward-

looking statements or forward-looking information contained herein to reflect future results, events or

developments, except as require by law. Accordingly, readers should not place undue reliance on

forward-looking statements and information. Please refer to the Company's most recent filings under

its profile at

www.sedar.com

for further information respecting the risks affecting the Company and its

business.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/130165