Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RTE.V ·

BMEX Gold Completes Phase 2 Drill Program on King Tut Announces Grant of Stock Options and RSUs

Exploration Programs Share Capital & Compensation

BMEX Gold Completes Phase 2 Drill Program

on King Tut Announces Grant of Stock Options

and RSUs

Vancouver, British Columbia--(Newsfile Corp. - December 16, 2021) - BMEX Gold Inc.

(TSXV: BMEX)

(FSE: 8M0) ("BMEX" or the "Company")

is pleased to announce the completion of a 3,000-metre

Phase 2 drill program on the King Tut Project located in the Abitibi Gold Belt. The program consisted of

drilling 17 holes (see

Figure 1

) utilizing two rigs with 3089 m of NQ-size diamond drill core being

recovered from the TUT/ Audet Quest Trend and was completed ahead of schedule and under budget.

For this phase-II drilling campaign on the property, the company conducted the DDH program on the

main known Tut zone but also explored 2 km of strike length between King Tut and Audet Quest (Audet

Ouest deformation trend, figure 1) and 2 km of strike length of the Main King Tut deformation Trend. Both

structures were interpreted using recently acquired high resolution magnetic drone survey.

Several holes

were drilled on the main deposit and on both interpreted deformation trend outline important quartz

veining system, alteration and deformation. Assay results are pending and will be announced when

received. For the location of the King Tut property see

Figure 2

.

Figure 1: 2021 Phase 2 Drilling Campaign on King Tut Property

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/5785/107729_04223d6de4f038b9_002full.jpg

*Note drill results from Phase 1 drilling can be found here:

Press Release June 14, 2021

Figure 2: Location Map of King Tut property

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/5785/107729_04223d6de4f038b9_003full.jpg

*Note drill results on map for BMEX Gold are historical except TUT-21-018 which is from Phase 1 drilling

Press Release June 14, 2021

Stock Options and Grant of RSUs

BMEX has granted options to acquire a total of 550,000 common shares of the Company to certain

directors and officers, pursuant to the Company's Stock Option Plan, at the exercise price of $0.15 for a

period of five years, from December 16, 2021.

In addition, the Company has granted a total of 1,300,000 restricted stock units ("RSUs") of the

Company to certain directors and consultants, pursuant to the terms of the Company's RSU Plan, which

RSUs will expire on December 16, 2023.

Qualified Person

Maxime Bouchard, Geo, M.Sc. (OGQ #1752), Consulting Geologist with Laurentia Exploration is the

Qualified Person (as defined by National Instrument 43-101 - Standards of Disclosure for Mineral

Projects) for the Company and has approved the technical disclosure contained in this news release.

The drilling campaign and the quality control program have been planned and supervised by Maxime

Bouchard. Core logging and sampling were completed by Laurentia Exploration. The quality assurance

and quality control protocol include insertion of one blank and one standard every 20 samples, in

addition to the regular insertion of blank, duplicate, and standard samples accredited by ALS Canada

Ltd. during the analytical process. Additionally, sample weight is taken prior shipment to validate sample

identity. Gold values are estimated by fire assay with finish by atomic absorption and values over 10

ppm Au are reanalyzed by fire assay with a finish by gravimetry. The Qualified Person has not completed

sufficient work to verify the historic information on the Property, particularly in regards to historical drill

results. However, the Qualified Person believes that drilling and analytical results were completed to

industry standard practices. The information provides an indication of the exploration potential of the

Property but may not be representative of expected results.

About BMEX Gold Inc.

BMEX Gold Inc. is a junior Canadian mining exploration company with the primary objective to acquire,

explore, and develop viable gold and base metal projects in the mining-friendly jurisdiction of Quebec,

Canada. BMEX has 100% interest in its two projects, both located in the prolific Abitibi greenstone belt:

King Tut Project consists of 120 contiguous claims on 5,206 hectares

Dunlop Bay Project consists of 76 mineral claims that cover 4,226 hectares

BMEX common shares trade under the symbol "BMEX" on the TSX-V and under the symbol 8M0 on the

Frankfurt Exchange.

For further information please contact:

BMEX Gold Inc.

Dylan Sidoo, Business Development

Tel: 1 (604) 423 4499

Email:

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. No stock exchange, securities commission or other regulatory authority has approved or

disapproved the information contained herein.

This news release contains "forward-looking statements" and "forward-looking information" (as defined

under applicable securities laws), based on management's best estimates, assumptions, and current

expectations. Such statements include but are not limited to, statements with respect to the plans for

future exploration and development of the King Tut and Dunlop Bay properties and the acquisition of

additional exploration projects.

Generally, these forward-looking statements can be identified by the use

of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts" , "anticipates"

"plans", "anticipates", "believes", "intends", "estimates", "projects", "aims", "potential", "goal",

"objective", "prospective", and similar expressions, or that events or conditions "will", "would", "may",

"can", "could" or "should" occur.

These statements should not be read as guarantees of future

performance or results.

Such statements involve known and unknown risks, uncertainties and other

factors that may cause actual results, performance or achievements to be materially different from those

expressed or implied by such statements, including but not limited to: risks related to the King Tut and

Dunlop Bay projects; risks related to general economic conditions, actual results of current exploration

activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be

refined; fluctuations in prices of metals including gold; increases in market prices of mining

consumables, possible variations in resource estimates, grade or recovery rates; failure of plant,

equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and

limitations on insurance coverage and other risks of the mining industry; delays in the completion of

exploration, development or construction activities, changes in national and local government regulation

of mining operations, tax rules and regulations, and political and economic developments in areas in

which the Company operates. Although the Company has attempted to identify important factors that

could cause actual results to differ materially from those contained in forward-looking statements, there

may be other factors that cause results not to be as anticipated, estimated or intended. There can be no

assurance that such statements will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. The forward-looking statements and forward-

looking information are made as of the date hereof and are qualified in their entirety by this cautionary

statement.

The Company disclaims any obligation to revise or update any such factors or to publicly

announce the result of any revisions to any forward-looking statements or forward-looking information

contained herein to reflect future results, events or developments, except as require by law. Accordingly,

readers should not place undue reliance on forward-looking statements and information. Please refer to

the Company's most recent filings under its profile at

www.sedar.com

for further information respecting

the risks affecting the Company and its business.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/107729