BMEX Commences Phase 2 Drill Program on King Tut
BMEX Commences Phase 2 Drill Program on
King Tut
Vancouver, British Columbia--(Newsfile Corp. - November 18, 2021) - BMEX Gold Inc. (
TSXV: BMEX
)
(
FSE: 8M0
) ("
BMEX
" or the "
Company
") is pleased to announce a 3,000-metre Phase 2 drill program
on the King Tut project. BMEX conducted a drone magnetic survey on the property as a follow up to the
inaugural 4,500-metre drill program which returned anomalous gold values in nearly every hole related to
quartz-carbonates veining, indicating that a hydrothermal gold-bearing system is hosted on the property.
Highlight hole TUT-21-018 assayed 81.89 g/t Au over 0.45 metres and targeted the western edge of the
known gold-bearing structure at King Tut leaving nearly 2 km of strike length between Tut and Audet
Quest to the west to drill test an identified shear zone in the Phase 2 program. The drill targets (see
Figure 1
) were identified from integrating data collected from the magnetic survey, geological data from
the previous drill program, and geological modelling. BMEX will be using two rigs to evaluate this trend
in order to reduce costs and expedite results. Drilling is anticipated to be completed by Dec 15, 2021.
Figure 1: 2021 Drilling Campaign on King Tut Property
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5785/103990_img1.jpg
Robert Pryde, President, commented, "Armed with additional information following several months of
data compilation and analysis, we have a better understanding of the gold system at King Tut and are in
a stronger position to move forward with our Phase 2 drill program. The team is very excited to initiate
the Phase 2 drilling and we are working closely with our geoscience consulting team at Laurentia
Exploration to target the gold structure identified in previous exploration on King Tut."
The King Tut project is located 65 km east of Amex Exploration's Perron Property (see
Figure 2
).
Figure 2: Location Map of King Tut property.
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5785/103990_11c7136b94e39879_003full.jpg
About BMEX Gold Inc.
BMEX Gold Inc. is a junior Canadian mining exploration company with the primary objective to acquire,
explore, and develop viable gold and base metal projects in the mining-friendly jurisdiction of Quebec,
Canada. BMEX is currently fully focused on earning 100% interest in its two projects, both located in the
prolific Abitibi greenstone belt:
King Tut Project
consists of 120 contiguous claims on 5,206 hectares.
Dunlop Bay Project
consists of 76 mineral claims that cover 4,226 hectares.
BMEX common shares trade under the symbol "BMEX" on the TSX-V and under the symbol 8M0 on the
Frankfurt Exchange.
For further information please contact:
BMEX Gold Inc.
Dylan Sidoo, Business Development
Tel: 1 (604) 423 4499
Email:
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release. No stock exchange, securities commission or other regulatory authority has approved or
disapproved the information contained herein.
This news release contains "forward-looking statements" and "forward looking information" (as defined
under applicable securities laws), based on management's best estimates, assumptions, and current
expectations. Such statements include but are not limited to, statements with respect to the plans for
future exploration and development of the King Tut and Dunlop Bay properties and the acquisition of
additional exploration projects.
Generally, these forward-looking statements can be identified by the use
of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts" , "anticipates"
"plans", "anticipates", "believes", "intends", "estimates", "projects", "aims", "potential", "goal",
"objective", "prospective", and similar expressions, or that events or conditions "will", "would", "may",
"can", "could" or "should" occur.
These statements should not be read as guarantees of future
performance or results.
Such statements involve known and unknown risks, uncertainties and other
factors that may cause actual results, performance or achievements to be materially different from those
expressed or implied by such statements, including but not limited to: risks related to the King Tut and
Dunlop Bay projects; risks related to general economic conditions, actual results of current exploration
activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be
refined; fluctuations in prices of metals including gold; increases in market prices of mining
consumables, possible variations in resource estimates, grade or recovery rates; failure of plant,
equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and
limitations on insurance coverage and other risks of the mining industry; delays in the completion of
exploration, development or construction activities, changes in national and local government regulation
of mining operations, tax rules and regulations, and political and economic developments in areas in
which the Company operates. Although the Company has attempted to identify important factors that
could cause actual results to differ materially from those contained in forward-looking statements, there
may be other factors that cause results not to be as anticipated, estimated or intended. There can be no
assurance that such statements will prove to be accurate, as actual results and future events could differ
materially from those anticipated in such statements. The forward-looking statements and forward
looking information are made as of the date hereof and are qualified in their entirety by this cautionary
statement.
The Company disclaims any obligation to revise or update any such factors or to publicly
announce the result of any revisions to any forward-looking statements or forward looking information
contained herein to reflect future results, events or developments, except as require by law. Accordingly,
readers should not place undue reliance on forward-looking statements and information. Please refer to
the Company's most recent filings under its profile at
www.sedar.com
for further information respecting
the risks affecting the Company and its business.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/103990