Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RSM.V ·

High-Grade Assay Results up to 26% TiO2 and 18,887ppm TREO at Tiros North Block Support Next Steps Toward Scoping Study

Drill Results Economic Studies

Resouro Strategic Metals Inc.

BC0430203 (Canada) ARBN 671 716 457 (Australia)

Suite 250, 997 Seymour Street, V ancouver, British Columbia, Canada V6B 3M1 – Tel: +1 403 807 2948

Level 10, Kyle House, 27-31 Macquarie Place, Sydney NSW 2000 – Tel: + 61 407 123 143

1 | P a g e

ASX: RAU

TSXV: RSM

OTCQB: RSGOF

TSXV Release ASX Release

21 April 2025 22 April 2025

High-Grade Assay Results up to 26% TiO2 and

18,887ppm TREO at Tiros North Block Support

Next Steps Toward Scoping Study

Resouro Strategic Metals Inc. (ASX: RAU; TSX-V: RSM; FSE: 8TX; OTCQB: RSGOF) ("Resouro" or

the "Company") is pleased to announce the assay results from 21 auger drill hole for 206 m of

drilling, undertaken at the North block of the Tiros Titanium and Rare Earth Elements (“REE”)

Project in Minas Gerais, Brazil (“Tiros Project” or “Tiros” or “Project”).

Highlights

1m at 22% TiO2 and 18,827ppm TREO from 8m in auger hole FT-32

1m at 25.6% TiO2 and 12,138ppm TREO from 19m in auger hole FT-28

High-grade results close to surface include:

• 7m at 23.4 TiO2% and 8,149ppm TREO from 5m depth in auger hole FT29

• 4m at 20.8 TiO2% and 14,229ppm TREO from 6m depth in auger hole FT32

• 4m at 18.9 TiO2% and 11,059ppm TREO from 5m depth in auger hole FT42

The recent update of the MRE for the C entral Block MRE of 1.4 Billion tonnes of Measured

and Indicated Resource contains 165 Mt of titanium dioxide (TiO₂), and 5.5 Mt of Total Rare

Earths Oxide (TREO) at a Magnet Rare Earths Oxide (“MREO”) ratio of 27% and is one of

the largest mineral deposits globally. An additional resource of 500 million tonne of Inferred

Resource contains 60 million tonnes of TiO2 and 1.85 million tonnes of TREO.

The current assay results add to the massive resource potential of the Tiros Project area.

Resouro Strategic Metals Inc.

BC0430203 (Canada) ARBN 671 716 457 (Australia)

Suite 250, 997 Seymour Street, V ancouver, British Columbia, Canada V6B 3M1 – Tel: +1 403 807 2948

Level 10, Kyle House, 27-31 Macquarie Place, Sydney NSW 2000 – Tel: + 61 407 123 143

2 | P a g e

NORTH BLOCK ASSAY RESULTS

Results are related to the current auger drilling campaign, designed to evaluate the areas outside

the Tiros Central block. The North block was initially chosen because earlier results from auger

drilling showed a high-grade zone close to the surface. Assay results exclude additional 18 auger

holes for 180m of drilling, from the same North block, with results pending at ALS laboratory, at

Vespasiano, Minas Gerais.

All assay intervals (Table 1) are determined using cut -off grades of 1,000ppm for TREO and 6%

for TiO2 while the high-grade zone is defined using a cut-off grade of 6,000ppm for TREO and/or

16% for TiO2. These results from the Northern Permit of the Tiros North Block confirm high-grade

mineralisation is continuous and is either exposed at surface or covered by a thin layer of

overburden.

Hole_ID Type From To TiO2 %

TREO

ppm

NdPr ppm

FT-26 Auger 10.00 12.00

10.63

2,170 337

FT-27 Auger 0.00 10.70

10.76

4,694 1,520

FT-28 Auger 9.00 20.00

16.97

8,322 1,644

Includes Auger 14.00 20.00

22.08

11,793 2,441

Also includes Auger 19.00 20,00 25.6 12,138 2,370

FT-29 Auger 1.00 12.00

19.28

6,669 1,218

Includes Auger 5.00 12.00

23.41

8,149 1,677

FT-30 Auger 4.00 12.00

13.34

5,606 732

Includes Auger 10.00 12.00

18.58

10,063 1,915

FT-31 Auger 2.00 13.00

15.24

3,720 646

Includes Auger 5.00 9.00

17.71

4,070 558

FT-32 Auger 0.00 11.65

15.35

7,178 1,325

Includes Auger 6.00 10.00

20.81

14,229 2,884

Also includes Auger 8.00 9.00 22.1 18,827 4,058

FT-33 Auger 0.00 14.00

16.13

5,137 1,147

Resouro Strategic Metals Inc.

BC0430203 (Canada) ARBN 671 716 457 (Australia)

Suite 250, 997 Seymour Street, V ancouver, British Columbia, Canada V6B 3M1 – Tel: +1 403 807 2948

Level 10, Kyle House, 27-31 Macquarie Place, Sydney NSW 2000 – Tel: + 61 407 123 143

3 | P a g e

Includes Auger 3.00 7.00

20.94

7,001 1,602

FT-34 Auger 0.00 11.00

13.35

3,322 661

Includes Auger 4.00 6.00

18.60

2,920 719

FT-35 Auger 0.00 1.00

6.02

4,460 653

FT-36 Auger 0.00 3.50

10.30

2,522 610

FT-38 Auger 0.00 8.00

11.93

4,175 1,120

FT-39 Auger 2.00 3.00

6.70

4,139 274

FT-40 Auger 0.00 7.00

8.98

2,570 518

FT-42 Auger 1.00 9.50

15.01

8,118 1,694

Includes Auger 5.00 9.00

18.90

11,059 2,514

FT-43 Auger 0.00 12.00

11.17

3,513 502

Includes Auger 11.00 12.00

17.60

9,136 1,766

FT-44 Auger 0.00 1.00

8.62

4,136 1,237

FT-47 (partial) Auger 8.00 12.00

10.64

1,565 248

Table 1: Significant Assay intervals from Auger Holes, Tiros North

The Tiros North Block, Figure 1, is a plateau, where the Capacete Formation is preserved. Auger

holes were positioned along the rim of the plateau, in zones with little or no overburden.

Resouro Strategic Metals Inc.

BC0430203 (Canada) ARBN 671 716 457 (Australia)

Suite 250, 997 Seymour Street, V ancouver, British Columbia, Canada V6B 3M1 – Tel: +1 403 807 2948

Level 10, Kyle House, 27-31 Macquarie Place, Sydney NSW 2000 – Tel: + 61 407 123 143

4 | P a g e

Figure 1: Map of the drilling grid at the Tiros North Block

The geological map of the Capacete formation, Figure 2, demonstrates the relationship between

mineralization and overburden. The current campaign targets zones not covered by overburden.

Resouro Strategic Metals Inc.

BC0430203 (Canada) ARBN 671 716 457 (Australia)

Suite 250, 997 Seymour Street, V ancouver, British Columbia, Canada V6B 3M1 – Tel: +1 403 807 2948

Level 10, Kyle House, 27-31 Macquarie Place, Sydney NSW 2000 – Tel: + 61 407 123 143

5 | P a g e

Figure 2: Geological Map at the Tiros North Block

The photo below shows the region where the high-grade zone crops out. The top of the plateau, as

seen in the background, has overburden covering the Capacete formation, with a thickness in the

order of 20 to 25 m. The valleys, as depicted at the front part of this p hotograph, shows the

mineralization without overburden that is a favourable location to start a mining operation.

Photo 1: View to south, from the North of the Tiros North block.

Resouro Strategic Metals Inc.

BC0430203 (Canada) ARBN 671 716 457 (Australia)

Suite 250, 997 Seymour Street, V ancouver, British Columbia, Canada V6B 3M1 – Tel: +1 403 807 2948

Level 10, Kyle House, 27-31 Macquarie Place, Sydney NSW 2000 – Tel: + 61 407 123 143

6 | P a g e

NEXT STEPS

Resouro will produce a Resource Statement and develop a mine plan to complete a Scoping Study

in support of a Trial Mining License application. Work has begun on the Environmental Impact

Study required as part of the licensing process. The objective of the Scoping Study is to generate

bulk samples of raw, unprocessed material from the North Block , targeting very high-grade, near

surface, friable material, for distribution to potential offtake partners. This will help test market

interest in direct shipping and guide future development decisions.

In parallel, Resouro will continue evaluating the targets outside its Central block, where drilling is

currently concentrated. Exploratory drilling has confirmed the presence of mineralization in both

the São Gotardo and North blocks. The Campos Altos block will be mapped with the support of

the auger rig, to assess its exploration potential.

This announcement has been authorized for release by the Board of Directors.

Contact Information:

Chris Eager,

Executive Chair (Santiago)

[email protected]

+44 7388 0579809

Alistair Stephens

Chief Executive Officer (Perth)

[email protected]

+614 88 99 25

Emily Evans, SPOKE

Media and Content Manager

[email protected]

+61 401 337 959

About the Company

Resouro is a Canadian incorporated mineral exploration and development company, listed on the ASX, TSXV ,

OTC and FSE, focused on the discovery and advancement of economic mineral projects in Brazil, including the

Tiros Titanium -Rare Earths Project and the Novo Mundo Go ld Project. The Tiros project has 28 mineral

concessions totalling 497 km 2 located in the state of Minas Gerais, one of the best infrastructurally developed

states of Brazil, 350 km from the state capital of Belo Horizonte. Resouro's Mineral Resource Estim ate for the

Tiros Project contains 165 million tonne of titanium dioxide and 5.5 million tonne of total rare earths oxides within

a Measured and Indicated Resource of 1.4 billion tonne.

Resouro Strategic Metals Inc.

BC0430203 (Canada) ARBN 671 716 457 (Australia)

Suite 250, 997 Seymour Street, V ancouver, British Columbia, Canada V6B 3M1 – Tel: +1 403 807 2948

Level 10, Kyle House, 27-31 Macquarie Place, Sydney NSW 2000 – Tel: + 61 407 123 143

7 | P a g e

Note: Further details of the Company’s JORC MRE are contained within the Company’s announcement of 9 April,

2025. Resouro is not aware of any new information or data that materially affects the information included in the

Company’s announcement and that all material assumptions and technical parameters underpinning the estimates

referred to therein continue to apply and have not materially changed.

Resouro Strategic Metals Inc., capital structure

ASX Chess Depositary Interests 42,833,059

TSXV Common Stock 49,756,990

Total on Issue 92,590,049

Shares held in Escrow included in Total on Issue 10,979,257

Options issued under the Company Plan 12,495,000

Options issued to Brokers 1,843,643

Warrants issued to Brokers 600,616

Performance Rights 750,000

Fully Diluted Securities 108,279,308

Competent Person Statement

The information in this report related to Exploration Targets and Exploration Results for drilling at Tiros is based on information

compiled by Mr Rodrigo Mello, a Competent Person who is a Fellow of the Australasian Institute of Mining and Metallurgy

(FAusIMM 209332]. Mr Mello is a consultant for Resouro Strategic Metals Inc. and has sufficient experience that is relevant to

the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify him as Competent

Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and O re

Reserves’. Mr. Mello has a financial interest in the project, both as the owner of a minority stake (10% free carried interest) and as

a minor shareholder of Resouro. Mr Mello consents to include this information in the report of the matters based on his information

in the form and context in which it appears.

The information in this announcement that relates to Mineral Resources is based on, and fairly represents, information compil ed

and approved by Mr. Simon Mortimer, a Competent and Qualified Person and registered professional geologist (FAIG #7795) with

experience in geology, mineral exploration, geological modelling, mineral resource estimation and classification, and database

management. Mr. Simon Mortimer is independent of Resouro Strategic Metals Inc.. The mineral resource estimate and the processes

involved in its development have been peer reviewed by Mr. Luis Oviedo, a Competent and Qualified Person with significant

domain experience in Rare Earth Element deposits. Mr Simon Mortimer is the principal consultant for Atticus Geoscience and has

DOMAIN Category Million Tonne TiO2 % TREO (ppm) MREO (ppm)MREO/TREO ratio

HG (High Grade) Measured 30 24 9,300 2,500 27%

Indicated 74 23 8,900 2,300 26%

M + I 103 23 9,100 2,400 26%

Inferred 33 22 8,300 2,200 26%

MG (Medium Grade) Measured 340 11 3,700 1,000 28%

Indicated 930 11 3,600 1,000 28%

M + I 1,300 11 3,600 1,000 28%

Inferred 470 11 3,400 920 27%

TOTAL (HG+MG) Measured 367 12 4,100 1,100 28%

Indicated 1,000 12 4,000 1,100 27%

M + I 1,400 12 4,000 1,100 28%

Inferred 500 12 3,700 1,000 27%

Resouro Strategic Metals Inc.

BC0430203 (Canada) ARBN 671 716 457 (Australia)

Suite 250, 997 Seymour Street, V ancouver, British Columbia, Canada V6B 3M1 – Tel: +1 403 807 2948

Level 10, Kyle House, 27-31 Macquarie Place, Sydney NSW 2000 – Tel: + 61 407 123 143

8 | P a g e

sufficient experience that is relevant to the style of mineralisation and type of deposit and to the activity being undertaken to qualify

as Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mi neral

Resources and Ore Reserves’ and as Qualified Person under the National Instrument 43 -101 Standards of Disclosure for Mineral

Project. Mr Simon Mortimer consents to the inclusion of this information in this announcement of the matters based on his

information in the form and context in which it appears.

Forward-Looking Information

This news release contains certain "forward-looking information" within the meaning of applicable securities law. Forward-looking

information is frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate"

and other similar words, or statements that certain events or conditions "may" or "will" occur. Although we believe that the

expectations reflected in the forward -looking information are reasonable, there can b e no assurance that such expectations will

prove to be correct. We cannot guarantee future results, performance or achievements. Consequently, there is no representation that

the actual results achieved will be the same, in whole or in part, as those set out in the forward-looking information.

Forward-looking information is based on the opinions and estimates of management at the date the statements are made and are

subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from

those anticipated in the forward -looking information. Some of the risks and other factors that could cause the results to differ

materially from those expressed in the forward-looking information include, but are not limited to: general economic conditions in

Canada and globally; industry conditions, including governmental regulation and environmental regulation; failure to obtain

industry partner and other third party consents and approvals, if and when re quired; the need to obtain required approvals from

regulatory authorities; stock market volatility; liabilities inherent in the mining industry; competition for, among other th ings,

skilled personnel and supplies; incorrect assessments of the value of acqu isitions; geological, technical, processing and

transportation problems; changes in tax laws and incentive programs; failure to realize the anticipated benefits of acquisitions and

dispositions; and the other factors. Readers are cautioned that this list of risk factors should not be construed as exhaustive.

The forward-looking information contained in this news release is expressly qualified by this cautionary statement. We undertake

no duty to update any of the forward -looking information to conform such information to actual results or to changes in our

expectations except as otherwise required by applicable securities legislation. Readers are cautioned not to place undue relianc e

on forward-looking information.

Neither the ASX, OTC, TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.