Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RPX.V ·

Red Pine Reports its Best Intersection in the Hanging Wall of the Jubilee Shear Zone: 5.13 g/t gold over 37.47m, including 25.20 g/t gold over 3.41m

Drill Results

Red Pine Reports its Best Intersection in the Hanging Wall of

the Jubilee Shear Zone: 5.13 g/t gold over 37.47m, including

25.20 g/t gold over 3.41m

Toronto, Ontario (January 6, 2023) – Red Pine Exploration Inc. (TSXV: RPX, OTCQB:

RDEXF) (“Red Pine” or the “Company”) is pleased to report results from its continuing

exploration program. Hole SD-22-396 intersected significant mineralization in the Surluga

North Vein Network above the Jubilee Shear Zone (hanging wall) of the current resources

of the Wawa Gold Project. All reported drill widths are core length unless otherwise stated.

• High-grade mineralization in the Surluga North Vein Network extended laterally to

the north by 115 m

o Gold mineralization is associated with a network of multidirectional quartz-

tourmaline veins

o The vein network is in the hanging wall of the Jubilee Shear Zone and was

intersected at 165 m vertical depth

o Contains 5.13 g/t gold over 37.47 m, including 25.20 g/t gold over 3.41 m in

SD-22-396 (see table 1)

o Other intersections of significance in the Surluga North Vein Network

includes that have previously been released includes:

▪ 8.46 g/t gold over 6.42 m in SD-22-321 (see news release of March

30, 2022) located approximately 200 m SW of SD-22-396

▪ 11.19 g/t gold over 2.61 m in SD-22-326 (see news release of April

19, 2022) located approximately 200 WSW of SD-22-396

o Possibility that Surluga North Vein Network is related to a comparable

quartz-tourmaline vein network intersected 610 m north in 2016 in SD-16-

43.

Quentin Yarie, President and CEO of Red Pine Exploration commented: " These results

from the Surluga North Vein Network demonstrate that significant mineralization exists in

the hanging wall of the Jubilee Shear Zone and validates the potential for a hybrid pit and

underground project. The hanging wall of the Jubilee Shear Zone remains unexplored to

the north of the intersection in SD-22-396, leaving the Surluga North Vein Network open

for further extension toward the intersection of a comparable network of quartz-tourmaline

veins 610 m north in SD-16-43.”

Table 1– Highlights from drilling in the Wawa Gold Corridor (Figure 1)

Hole From (m) To

(m)

Length

(m)*

Visible

Gold

Gold

(g/t) Zone

SD-22-396

229.37 266.84 37.47 VG 5.13

Surluga North Vein Network

Including

238.6 239.6 1.00 VG 19.78

243.59 245 1.41 VG 30.97

246 247 1.00 VG 40.37

249.5 251 1.50 28.77

253.82 256.29 2.47 VG 7.50

Assay results presented over core length. Considering the multi -directional nature of the veins

forming the network hosting gold mineralization, additional drilling will be necessary to constrain

the true width of the mineralized envelope of the vein network.

Quality Assurance/Quality Control ("QA/QC") Measures

Drill core samples were transported in security sealed bags for analyses to Actlabs in

Ancaster, Ontario. Individual samples were labelled, placed in plastic sample bags and

sealed. Groups of samples were then p laced into durable rice bags and shipped. The

residual coarse reject portions of the samples remain in storage if further work or

verification is needed.

Red Pine has implemented a quality-control program to comply with best practices in the

sampling and a nalysis of drill core. As part of its QA/QC program, Red Pine inserts

external gold standards (low to high grade) and blanks every 20 samples in addition to

random standards, blanks, and duplicates.

Qualified Person

Quentin Yarie, P.Geo. and Chief Executive Officer of Red Pine and the Qualified Person,

as defined by National Instrument 43 -101, has reviewed, and approved the news

release’s technical information.

COVID-19 Precautions

Red Pine has developed and implemented compliant precautions and procedures

according to guidelines for the Province of Ontario. Protocols were put in place to ensure

our employees’ and contractors’ safety, thereby reducing the potential for community

contact and spreading of the virus.

About Red Pine Exploration Inc.

Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto,

Ontario, Canada. The Company's shares trade on the TSX Venture Exchange under the

symbol "RPX" and on the OTCQB Markets under the symbol “RDEXF”.

The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontario, a region that

has seen major investment by several producers in the last five years. Its land package

hosts numerous historic gold mines and is over 6,900 hectares in size. Led by Quentin

Yarie, CEO, who has over 25 years of experience in mineral exploration, Red Pine is

strengthening its position as a major mineral exploration and development player in the

Michipicoten region.

For more information about the Company, visit www.redpineexp.com

Or contact:

Quentin Yarie, President and CEO, (416) 364-7024, [email protected]

Or

Carrie Howes, Director Corporate Communications, (416) 644 -7375,

[email protected]

1 National Instrument 43-101 Technical Report for the Wawa Gold Project, Brian Thomas

P.Geo. Golder Associates Ltd, report effective August 18, 2021.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy

or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains statements which constitute “forward-looking information” within the

meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and

current expectations of the Company with respect to future business activities and operating

performance.

Forward-looking information is often identified by the words “may”, “would”, “could”, “should”, “will”,

“intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” or similar expressions. Forward-looking

information contained in this news release includes but may not be limited to:” the potential for a

hybrid pit and underground project”. Investors are cautioned that forward-looking information is not

based on historical facts but instead reflect management’s expectations, estimates or projections

concerning future results or events based on the opinions, assumptions and estimates of management

considered reasonable at the date the statements are made. Such opinions, assumptions and estimates

are inherently subject to a variety of risks and uncertainties that could cause actual events or results to

differ materially from those projected and undue reliance should not be placed on such information, as

unknown or unpredictable factors could have material adverse effects on future results, performance or

achievements. Among the key factors that could cause actual results to differ materially from those

projected in the forward-looking information are the following: the Company's expectations in

connection with the projects and exploration programs being met, the impact of general business and

economic conditions, global liquidity and credit availability on the timing of cash flows and the values of

assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange

rates (such as the Canadian dollar versus the United States Dollar), variations in ore grade or recovery

rates, changes in accounting policies, changes in the Company's mineral reserves and resources, changes

in project parameters as plans continue to be refined, changes in project development, construction,

production and commissioning time frames, the possibility of project cost overruns or unanticipated

costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher

costs and general risks of the mining industry, failure of plant, equipment or processes to operate as

anticipated, unexpected changes in mine life, seasonality and weather, costs and timing of the

development of new deposits, success of exploration activities, permitting time lines, government

regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes

or claims, and limitations on insurance.

This information is qualified in its entirety by cautionary statements and risk factor disclosure contained

in filings made by the Company, including the Company’s annual information form, financial statements

and related MD&A for the year ended July 31, 2022, and the interim financial reports and related MD&A

for the period ended October 31, 2022, filed with the securities’ regulatory authorities in certain

provinces of Canada and available at www.sedar.com.

Should one or more of these risks or uncertainties materialize, or should assumptions underlying the

forward-looking information prove incorrect, actual results may vary materially from those described

herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has

attempted to identify important risks, uncertainties and factors which could cause actual results to differ

materially, there may be others that cause results not to be as anticipated, estimated or intended. The

Company does not intend, and does not assume any obligation, to update this forward-looking

information except as otherwise required by applicable law.

Figure 1- Plan Map of Surluga Deposit and Surrounding Shear Zones

Figure 2 - Cross-Section of hole SD-22-396 with all gold assays above 0.5 gpt in the Hanging Wall and Footwall of the Surluga

Deposit