Red Pine Intersects High-Grade Gold in the Minto Vein, 109.37 g/t gold over 2.68 metres (un-cut and true width) including 314 g/t gold over 0.84 metre

Drill Results

Red Pine Intersects High-Grade Gold in the Minto Vein,

109.37 g/t gold over 2.68 metres (un-cut and true width)

including 314 g/t gold over 0.84 metre

Toronto, Ontario – September 2 , 2021 – Red Pine Exploration Inc. (TSX -V: RPX)

(“Red Pine” or the “Company”) is pleased to report new and notable results from its

2021 drilling program at the Wawa Gold Project, including the discovery of high-grade

gold mineralization in the Minto Vein 30 metres down-dip of the current boundary of the

Minto Mine Deposit inferred resource.

Highlights of the 2021 Drilling Program (Tables 1 and 2, Figure 1)

• Intersection in SD -21-298A of 109.37 g/t gold (un-cut) over 2.68 metres true

width (TW) in the Minto Vein, including 314 g/t gold over 0.84 metres (TW) and

26.93 g/t gold over 0.95 metre (TW), 30 metres away from the current boundary

of the resource.

• Extension of high-grade gold mineralization in SD-21-298A in the newly identified

Sadowski Gold Zone with the intersection of 24.8 g/t gold over 1.15 metres core

length (CL).

• Visible gold has been observed in 3 different veins in the Jubilee Shear Zone in

SD-21-298A (results pending).

“The confirmation that high-grade gold mineralization extends down-dip of the current

resource of the Minto Mine deposit is a significant development for the Wawa Gold

Project. With the overlapping relationship between the Minto Mine and the Jubilee

Shear Zones, we have two exploration targets that are testing concurrently with the

same drill hole. Additionally, the extension of high-grade gold mineralization in the

Sadowski Gold Zone continues to show that the property has significant greenfield

exploration potential.

Red Pine has two active drill rigs on-site that are concurrently testing the Surluga deposit

to the North and South, and the Minto Mine Deposit. A third drill is on site waiting for a

crew with which the Company will test some of the greenfield targets near the historic

Darwin Grace mine.” – Quentin Yarie, President and CEO.

Figure 1- 2021 Drill Holes Completed

Diamond Drilling

As part of its on-going 2021 exploration drilling program, Red Pine is testing the northern

and southern depth extensions of the Surluga Deposit and the Minto Mine South

Deposit. One drill rig is active at the northern end of the Surluga Deposit and one drill

rig is active at the southern end of the Surluga Deposit. The southern drill is also testing

the Minto Mine South Deposit.

At the southern end of the Surluga Deposit, in holes SD-21-296A, 297A and 298A, the

Jubilee Shear Zone was successfully intersected up to 400 metres away from the

current boundary of the Surluga Deposit resource. Results in the Jubilee Shear Zone

for holes SD-21-296A and 297A have been released, whereas those for 298A remain

pending (bottom half of hole 298A). Visible gold has been observed in 3 different veins

in the Jubilee Shear Zone in SD-21-298A.

Drilling at the southern end of the Surluga Deposit also resulted in the discovery of the

down-dip extension of the Minto Vein in the Minto Mine Shear Zone in SD-21-297A, and

to the discovery of significant mineralization in the Minto Vein in SD-21-298A. Additional

drilling is necessary to define the size and exten t of this new zone of high-grade gold

mineralization in the Minto Vein.

Hole SD -21-298A also continues to expand the potential of the newly discovered

Sadowski Gold Zone, a new near-surface high-grade zone of mineralization (Figure 2).

The Sadowski Gold Zone is formed by a network of quartz veins variably transposed in

superimposed shearing.

At the northern end of the Surluga Deposit, drilling indicated that the Jubilee Shear Zone

extends down-dip of the current limit of diamond drilling in the area. In hole SD -21-301

(assay results pending) , visible gold has been observed in two quartz veins in two

separate domains of the Jubilee Shear Zone.

Table 1 – Significant Drilling Intersections from the 2021 Drilling Program

Hole From

(m)

To

(m)

Length

(m)*

True

Width (m)

Visible

Gold Gold (g/t) Zone

SD-21-298A

86.35 87.5 1.15 Yes 24.8 Sadowski Gold Zone

320.2 323.35 3.15 2.68 Yes 109.37

Minto Mine Shear Zone

Including

320.2 321.32 1.12 0.95 26.93

322.36 323.35 0.99 0.84 314

*Results in the Sadowski Gold Zone are presented as core length and are estimated to be between 40% and 80%

true width. Additional drilling is necessary to constrain the geometry of that zone of mineralization.

Figure 2- Newly Discovered Sadowski Gold Zone

Table 2 - Coordinates of the Reported Holes

Hole ID Easting Northing Elevation Azimuth Dip Depth (m) Status

SD-21-298A 668546 5315425 361 272 74 729 Completed

SD-21-299 668581 5317216 390.9 304 -49 372 Completed

SD-21-300 668546 5315425 361 311 -77 411 Abandoned in diabase

SD-21-301 668581 5317216 390.9 324 -62 381 Completed

Figure 3- Drill Holes at Extension of Surluga Resource

On-site Quality Assurance/Quality Control ("QA/QC") Measures

Drill core samples were transported in security sealed bags for analyses at Actlabs in

Ancaster, Ontario. Individual samples were labelled, placed in plastic sample bags and

sealed. Groups of samples were then placed into durable rice bags and then shipped.

The residual coarse reject portions of the samples remain in storage if further w ork or

verification is needed.

Red Pine has implemented a quality -control program to comply with best practices in

the sampling and analysis of drill core. As part of its QA/QC program, Red Pine inserts

external gold standards (low to high grade) and blanks every 20 samples in addition to

random standards, blanks, and duplicates.

Qualified Person

Quentin Yarie, P.Geo. and Chief Executive Officer of Red Pine and the Qualified

Person, as defined by National Instrument 43 -101, has reviewed, and approved the

news release’s technical information.

COVID-19 Precautions

Red Pine has developed and implemented compliant precautions and procedures

according to guidelines for the Province of Ontario. Protocols were put in place to ensure

our employees’ and contract ors’ safety, thereby reducing the potential for community

contact and spreading of the virus.

About Red Pine Exploration Inc.

Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto,

Ontario, Canada. The Company's common shares trade on the TSX Venture Exchange

under the symbol "RPX".

The Wawa Gold Project is in the Michipicoten greenstone belt of Ontario, a region that

has seen major investment by several producers in the last five years. Its land package

hosts numerous historic gold mines and is over 6,800 hectares in size. The Company’s

Chairman of the Board is Paul Martin, the former CEO of Detour Gold . The Board has

extensive and diverse experience at such entities as Alamos, Barrick, Generation

Mining, Detour Gold, and the Ontario Energy Board. Led by Quentin Yarie, CEO, who

has over 25 years of experience in mineral exploration, Red Pine is strengthening its

position as a major mineral exploration and development player in the Michipicoten

region.

For more information about the Company, visit www.redpineexp.com

Or contact:

Quentin Yarie, President and CEO, (416) 364-7024, [email protected]

Or

Tara Asfour, Investor Relations Manager, (514) 833-1957, [email protected]

1National Instrument 43-101 Technical Report for the Wawa Gold Project, Brian Thomas

P.Geo. Golder Associates Ltd, effective July 16, 2019

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

This News Release contains forward-looking statements. In some cases, you can

identify forward-looking statements by terminology such as "may", "should", "expects",

"plans", "anticipates", "believes", "estimates", "predicts", "potential" or "continue" or the

negative of these terms or other comparable terminology. These statements are only

predictions and involve known and unknown risks, uncertainties and other factors that

may cause our or our industry's actual results, levels of activity, performance or

achievements to be materiall y different from any future results, levels of activity,

performance or achievements expressed or implied by these forward -looking

statements.

Although the Company believes that the assumptions and factors used in preparing the

forward-looking information in this news release are reasonable, undue reliance should

not be placed on such information, which only applies as of the date of this news

release. The Company disclaims any intention or obligation to update or revise any

forward-looking information, wh ether as a result of new information, future events or

otherwise, other than as required by law.