Red Pine Intercepts Significant Mineralization at the Wawa Gold Project, including 5.58 g/t gold over 18.44 m including 72.20 g/t gold over 0.88 m
Red Pine Intercepts Significant Mineralization at the Wawa
Gold Project, including 5.58 g/t gold over 18.44 m including
72.20 g/t gold over 0.88 m
Toronto, Ontario (May 29, 2024) – Red Pine Exploration Inc. (TSXV: RPX, OTCQB: RDEXF)
(“Red Pine” or the “Company”) is pleased to announce the most recent assay results from 14 drill
holes representing 4,105 metres (“m”) of drilling from the 2022-2024 resource expansion program
at the Wawa Gold Project . Since the resource expansion drilling program began in 2021, Red
Pine has now completed approximately 67,000 m of additional drilling in the current program for
the new mineral resource estimate update . Of these holes, approximately 60,300 m have now
been reported and the Company expects additional results to follow over the coming months from
the remaining core.
Drilling Highlights (Table 1, Figures 1-3):
• 5.58 grams per tonne (“g/t”) gold over 1 8.44 m, including 6.18 g/t gold over 1.11 m, and
72.20 g/t gold over 0.88 m in SD-24-515 within the Jubilee Shear System
• 2.21 g/t over 13.27 m, including 7.59 g/t gold over 0.88 m in SD-24-499A within the Jubilee
Shear System
• 1.48 g/t gold over 11.89 m, including 5.69 g/t gold over 1.00 m with in the Jubilee Shear
System in SD-24-511
• 1.40 g/t gold over 14.00 m , including 8.77 g/t gold over 1.00 m within the Jubilee Shear
System in SD-24-505
• 0.73 g/t gold over 9.57 m, including 2.41 g/t gold over 1.09 m within the Minto B Shear in
SD-24-496
• 1.25 g/t gold over 7.86 m within a new vein network in SD-24-509A
Paul Martin, Interim CEO and Chair of the Board of Red Pine commented: “The latest drill results
have continued to intersect extensions of gold mineralization within and away from the higher-
grade Jubilee Shear; the host of the current main underground mineral resource1. As part of this
drilling, near surface gold mineralization in the Hanging Wall of the Jubilee Shear has continued
to be intersected and is expected to contribute to reducing the stripping ratio under any proposed
open pit scenario. The recent intersection of significant gold mineralization in the Jubilee Shear
continues to confirm the continuity of the mineralization that remains open down dip and down
plunge.
With the detailed review, and correction, of our drill database completed and the addition of
significant gold assays from our drill program, we look forward to reporting our updated NI 43-101
resource in Q3. The Company anticipates a mid -June cut-off for the drilling assay database for
the resource update."
Discussion of Drill Results
In the Jubilee Shear System, the results of the exploration program indicate:
• Continuous increase of the size and the confidence, and to improve the continuity of gold
mineralization >= 2 g/t gold in the main segment of the Jubilee Shear; and
• Gold mineralization remains opens at depth in the Jubilee Shear down -dip and down -
plunge of the existing mineral resource
• Gold mineralization extends to surface beyond the northern extent of the existing mineral
resource
In the hanging wall of the Jubilee Shear, the new results comprise or indicate:
• Mineralized intercepts in the hanging wall of the Jubilee Shear confirms the presence of
mineralization zones
• Gold mineralization in the hanging wall of the Minto B shear occurs as sub-meter to multi-
meter wide shear zones surrounded by network of extensional quartz veins , that are
typically centered on narrow gabbroic injections in the Jubilee stock and are shallowly to
moderately dipping to the south and south-east
• A secondary type of gold mineralization in the hanging wall relates to the presence of
zones of intrusion -related gold (IRG) and shear -hosted mineralization associated with
sulfide disseminations.
Quality Assurance/Quality Control ("QA/QC") Measures
Following the recent discovery of selective manipulation of historical assay data, the Company
has implemented changes in the internal handling and dissemination of assay certificates. The
assay certificates are now sent to at least two members of the senior management team, and
they are accessible directly from the laboratory using a web portal that has been activated.
The rebuilding of our drilling assay database from the corrected assay certificates in preparation
for our upcoming resource update on the Wawa Gold Project is also complete and will be
compared to the database being compiled under the direction of the external QP.
Improvements have also been added to the Company’s QA/QC protocols under the direction of
the recently appointed new Chair of the Technical Committee and the incoming President and
Chief Executive Officer.
Drill core samples were transported in security sealed bags for analyses to Actlabs in Ancaster,
Ontario. Individual samples were labelled, placed in plastic sample bags and sealed. Groups of
samples were then placed into durable rice bags and shipped. The residual coarse reject portions
of the samples remain in storage if further work or verification is needed.
Red Pine has implemented a revised and strengthened quality-control program to comply with
best practices in the sampling and analysis of drill core. As part of its updated and independently
reviewed QA/QC program, Red Pine inserts external gold standards (low to high grade) and
blanks every 20 samples, and routinely insert blanks immediately after samples with visible gold.
Quarter c ore duplicates are routinely inserted to evaluate the natural variability of gold
mineralization.
Table 1– In and below the Jubilee Shear System (Figures 1 and 2)
Hole From To Length Gold Zone
(#) (m) (m) (m)* (g/t) (name)
SD-23-459 310.43 314.16 7.73 0.60 Jubilee Shear
SD-24-
499A 181.73 195.00 13.27 2.21 Jubilee Shear
including 182.89 183.77 0.88 7.59
and 189.89 190.91 1.00 4.04
SD-24-
501A 313.75 318.48 4.73 1.41 Jubilee Shear
including 317.59 318.48 0.89 4.47
408.73 412.17 3.44 1.90
Shear Zone below and
parallel to the Jubilee
Shear
SD-24-504 176.14 191.31 15.17 0.91 Jubilee Shear
including 180.89 181.81 0.92 5.00
and 185.84 186.82 0.98 2.54
and 190.3 191.31 1.01 2.50
SD-24-505 195.00 209.00 14.00 1.40 Jubilee Shear
including 195.00 196.00 1.00 8.77
and 205.40 206.40 1.00 2.17
SD-24-511 200.71 212.60 11.89 1.48 Jubilee Shear
including 200.71 201.68 0.97 3.01
and 205.69 206.69 1.00 3.43
and 210.62 211.64 1.00 5.69
SD-24-515 189.00 207.44 18.44 5.58 Jubilee Shear
including 189.00 190.11 1.11 6.18
and 191.12 192.00 0.88 72.20
and 199.24 200.45 1.21 5.20
212.60 215.78 3.18 0.86
249.00 250.23 1.23 2.84
358.77 359.77 1.00 3.45
*Intercepts are calculated using a 0.40 g/t gold cut -off and a maximum of 5 m of internal dilution with
no capping applied and are reported over core lengths. True width is estimated to vary between 75 to
95% of the reported core length.
Table 2– Hanging wall of the Jubilee Shear (Figures 1 and 2)
Hole From To Length Gold Zone
(#) (m) (m) (m)* (g/t) (name)
SD-22-332 97.31 98.50 1.19 0.60 Vein network
100.9 102.10 1.20 0.66
SD-22-352 57.67 59.00 1.33 4.20 Vein network
182.86 184.32 1.00 1.16
SD-22-380 149.00 150.49 1.49 0.49 Vein network
282.39 283.78 1.39 1.22
SD-22-382 98.00 99.44 1.44 4.22 Vein network
SD-23-459 143.44 146.38 2.94 0.68 Upper Minto B Shear
151.65 153.00 1.35 0.58
169.07 180.32 11.25 0.49
including 171.75 173.09 1.34 2.16
263.83 280.67 16.84 0.50 Minto B Shear
including 269.40 270.46 1.06 2.22
SD-24-488 39.77 41.16 1.39 0.50
SD-24-496 14.23 23.80 9.57 0.73 Minto B Shear
including 22.71 23.80 1.09 2.41
31.99 37.92 5.93 0.44
83.02 84.41 1.39 0.55
SD-24-499A 49.15 52.25 3.10 0.57
SD-24-501A 214.24 215.55 1.31 1.26
SD-24-504 117.13 118.50 1.37 0.41
SD-24-505 36.00 42.11 6.11 0.49 HW IRGS
140.22 141.68 1.46 0.69
SD-24-509A 23.39 24.64 1.25 7.86 Shear zone and Vein network
71.79 81.88 10.09 0.85
including 79.25 80.63 1.38 3.66
86.52 87.82 1.30 0.45
90.42 91.72 1.30 0.59
SD-24-515 149.75 152.20 2.45 0.53 Shear zone and Vein network
164.50 166.00 1.50 0.47
181.80 186.76 4.96 1.19
including 185.70 186.76 1.06 2.97
*Intercepts are calculated using a 0.40 g/t gold cut-off grade and a maximum of 5 m of internal dilution
with no capping applied and are reported over core lengths. True width is estimated to vary between
20 to 90% of the reported core length depending on the mineralization types defining the intersected
gold zones.
Qualified Person
Jean-Francois Montreuil, P.Geo. and Vice President, Exploration of Red Pine and the Qualified
Person, as defined by National Instrument 43 -101, has reviewed and approved the technical
information contained in this news release.
About Red Pine Exploration Inc.
Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto, Ontario,
Canada. The Company's shares trade on the TSX Venture Exchange under the symbol "RPX"
and on the OTCQB Markets under the symbol “RDEXF”.
The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontario, a region that has seen
major investment by several producers in the last five years. Its land package hosts numerous
historic gold mines and is over 7000 hectares in size. Red Pine is building a strong position as a
major mineral exploration and development player in the Michipicoten region.
For more information about the Company, visit www.redpineexp.com
Or contact:
Paul Martin, Board Chair and Interim CEO, at (416) 364-7024 or [email protected]
Or
Carrie Howes, Director Corporate Communications, at (416) 644 -7375 or
1 National Instrument 43-101 Technical Report for the Wawa Gold Project, Brian Thomas P.Geo.
Golder Associates Ltd, report effective August 18, 2021.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Cautionary Note Regarding Forward-Looking Information
This news release contains statements which constitute “forward -looking information” within the meaning
of applicable securities laws, including statements regarding the plans, intentions, beliefs and current
expectations of the Company with respect to future business activities and operating performance.
Forward-looking information is often identified by the words “may”, “would”, “could”, “should”, “will”, “intend”,
“plan”, “anticipate”, “believe”, “estimate”, “expect” or similar expressions. Forward -looking information
contained in this news release inclu des, but may not be limited to , statements regarding an updated
resource estimate, a possible open pit resource, the potential of a reduced stripping ratio under a proposed
open pit scenario, potentially expanding the resource to the north -west, and continuing t o expand the
footprints of significant mineralization in the Jubilee Shear which is expected to have a positive impact on
a future resource. Investors are cautioned that forward-looking information is not based on historical facts
but instead reflect s management’s expectations, estimates or projections concerning future results or
events based on the opinions, assumptions and estimates of management considered reasonable at the
date the statements are made. Such opinions, assumptions and estimates are inherently subject to a variety
of risks and uncertainties that could cause actual events or results to differ materially from those projected
and undue reliance should not be placed on such information, as unknown or unpredictable fact ors could
have material adverse effects on future results, performance or achievements. Among the key factors that
could cause actual results to differ materially from those projected in the forward -looking information are:
the Company's expectations in connection with the projects and exploration programs being met, the impact
of general business and economic conditions, global liquidity and credit availability on the timing of cash
flows and the values of assets and liabil ities based on projected future c onditions, fluctuating gold prices,
currency exchange rates (such as the Canadian dollar versus the United States Dollar), variations in ore
grade or recovery rates, changes in accounting policies, changes in the Company's mineral reserves and
resources, changes in project parameters as plans continue to be refined, changes in project development,
construction, production and commissioning time frames, the possibility of project cost overruns or
unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing
to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate
as anticipated, unexpected changes in mine life, seasonality and weather, costs and timing of the
development of new deposits, success of exploration activities, permitting time lines, government regulation
of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and
limitations on insurance.
This information contained in this news release is qualified in its entirety by cautionary statements and risk
factor disclosure contained in filings made by the Company, including the Company’s financial statements
and related MD&A for the year ended July 31, 2023, and the interim financial reports and related MD&A for
the period ended October 31, 2023 and January 31, 2024, filed with the securities’ regulatory authorities in
certain provinces of Canada and available at www.sedar.com.
Should one or more of these risks or uncertainties materialize, or should assumptions underlying the
forward-looking information prove incorrect, actual results may vary materially from those described herein
as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted
to identify important risks, uncertainties and factors which could cause actual results to differ materially,
there may be others that cause results not to be as anticipated, estimated or intended. The Company does
not intend, and does not assume any obligation, to update this forward -looking information except as
otherwise required by applicable law.
Figure 1 - Location of Diamond Drilling Results