Toronto, Ontario (February 2 3, 2023) – Red Pine Exploration Inc. (TSXV: RPX,

OTCQB: RDEXF) (“Red Pine” or the “Company”) is pleased to report new drilling results

from its continuing exploration program. The new results indicate that high -grade vein

networks, comparable to the Surluga North Vein Network intersected in SD-22-396 (5.13

g/t gold over 37.47 m ), are present in the footwall of the Surluga ; an area that was

historically untested and wide open for resource expansion. (Figures 1 & 2)

Highlights

• 5.07 g/t gold over 27.35 metres in SD-22-414 including:

o infilling a large zone classified as barren in the 2019 Surluga Deposit

▪ 5.46 g/t gold over 10.51 m etres including 11.48 g/t gold over 3.27

metres

o Extension/continuation of a series of f high-grade quartz veins below the

Jubilee Shear footwall (Figure 2)

▪ 70.9 g/t gold over 1.14 metres

• Drill holes from 2022 in the footwall of the Jubilee Shear indicated the occurrence

of high -grade quartz veins with the potential to increase the exi sting resource .

These are part of the newly identified intrusive related gold system (IRGS).

o 2.06 g/t gold over 11.45 metres, including 13.00 g/t Au over 1.00 metres in

SD-22-417 130 metres north of the intersection in SD -22-414 (see press

release of February 16th, 2023)

• Visible gold observed in a quartz vein of the same vein network in SD-22-418, 165

metres north of SD-22-414 and 75 metres from SD-22-417 (assays pending)

• In addition, there have been multiple mineralized intersections in the hanging wall

of the Jubilee Shear (Minto B is in the hanging wall of the Jubilee Shear) such as:

• 1.16 g/t gold over 7.12 metres including 5.72 g/t over 0.82 metres in SD-

22-407

Quentin Yarie, President and CEO of Red Pine Exploration commented:

“With the intersection of high -grade gold outside the existing resource of the

Surluga Deposit within the footwall and hanging wall of the Jubilee Shear (host of

the Surluga Deposit) , we continue to demonstrate potential upside to the Wawa

Gold Project . The historic drilling programs focussed on the Surluga Deposit

constrained by the Jubilee Shear and did not routinely extend much beyond those

boundaries. Other existing gaps in our high-grade resource will be infilled as part

of this years planned resource expansion. We will continue to test the mineralized

systems in both the hanging wall and footwall of the Jubilee Shear. All these

results continue to add to the potential for a shallow high grade open pit model.”

Table 1– Highlights from drilling in the Wawa Gold Corridor (Figure 1)

Hole From (m) To Length

(m)*

Visible

Gold

Gold

(g/t) Zone

(m)

SD-22-

407

42.7 49.82 7.12 1.16

Jubilee Hanging Wall

Including

42.7 43.62 0.92 3.57

49 49.82 0.82 5.72

71.59 72.95 1.36 0.50

79.68 81.18 1.50 2.83

93.86 95.42 1.56 1.02

198.63 200.57 1.94 0.99

Minto B Shear

230.55 231.91 1.36 0.54

291 295.02 4.02 2.43

Jubilee Shear

325.29 328.88 3.59 0.93

342.43 343.68 1.25 0.51 Jubilee Shear

SD-22-

414

123.49 124.69 1.20 0.56 Jubilee Hanging Wall

176.15 186.05 9.90 0.56

Minto B Shear

211.47 215.49 4.02 0.41

311.33 338.68 27.35 VG 5.07

Jubilee Shear +

Footwall Vein

Network (IRGS)

Including

318.57 321.84 3.27 VG 11.48

337.54 338.68 1.14 70.90

Assay results presented over core length. True width for the intersections varies between 55 to

90% depending of the intersected geological structure.

Quality Assurance/Quality Control ("QA/QC") Measures

Drill core samples were transported in security sealed bags for analyses to Actlabs in

Ancaster, Ontario. Individual samples were labelled, placed in plastic sample bags and

sealed. Groups of samples were then placed into durable rice bags and shipped. The

residual coarse reject portions of the samples remain in storage if further work or

verification is needed.

Red Pine has implemented a quality-control program to comply with best practices in the

sampling and analysis of drill core. As part of its QA/QC p rogram, Red Pine inserts

external gold standards (low to high grade) and blanks every 20 samples in addition to

random standards, blanks, and duplicates.

Qualified Person

Quentin Yarie, P.Geo. and Chief Executive Officer of Red Pine and the Qualified Person,

as defined by National Instrument 43 -101, has reviewed, and approved the news

release’s technical information.

COVID-19 Precautions

Red Pine has developed and implemented compliant precautions and procedures

according to guidelines for the Province of Ontario. Protocols were put in place to ensure

our employees’ and contractors’ safety, thereby reducing the potential for community

contact and spreading of the virus.

About Red Pine Exploration Inc.

Red Pine Exploration Inc. is a gold explor ation company headquartered in Toronto,

Ontario, Canada. The Company's shares trade on the TSX Venture Exchange under the

symbol "RPX" and on the OTCQB Markets under the symbol “RDEXF”.

The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontar io, a region that

has seen major investment by several producers in the last five years. Its land package

hosts numerous historic gold mines and is over 6,900 hectares in size. Led by Quentin

Yarie, CEO, who has over 25 years of experience in mineral explo ration, Red Pine is

strengthening its position as a major mineral exploration and development player in the

Michipicoten region.

For more information about the Company, visit www.redpineexp.com

Or contact:

Quentin Yarie, President and CEO, (416) 364-7024, [email protected]

Or

Carrie Howes, Director Corporate Communications, (416) 644-7375,

[email protected]

1 National Instrument 43-101 Technical Report for the Wawa Gold Project, Brian Thomas

P.Geo. Golder Associates Ltd, report effective August 18, 2021.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy

or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains statements which constitute “forward -looking information” within the

meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and

current expectations of the Company with respect to fut ure business activities and operating

performance.

Forward-looking information is often identified by the words “may”, “would”, “could”, “should”, “will”,

“intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” or similar expressions. Forward -looking

information contained in this news release includes but may not be limited to:” the potential for a hybrid

pit and underground project”. Investors are cautioned that forward -looking information is not based on

historical facts but instead reflect management’s expectations, estimates or projections concerning future

results or events based on the opinions, assumptions and estimates of management considered

reasonable at the date the statements are made. Such opinions, assumptions and estimates are inherently

subject to a variety of risks and uncertainties that could cause actual events or results to differ materially

from those projected and undue reliance should not be placed on such information, as unknown or

unpredictable factors could have material ad verse effects on future results, performance or

achievements. Among the key factors that could cause actual results to differ materially from those

projected in the forward-looking information are the following: the Company's expectations in connection

with the projects and exploration programs being met, the impact of general business and economic

conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and

liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as

the Canadian dollar versus the United States Dollar), variations in ore grade or recovery rates, changes in

accounting policies, changes in the Company's mineral reserves and resources, changes in pr oject

parameters as plans continue to be refined, changes in project development, construction, production

and commissioning time frames, the possibility of project cost overruns or unanticipated costs and

expenses, higher prices for fuel, power, labour an d other consumables contributing to higher costs and

general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated,

unexpected changes in mine life, seasonality and weather, costs and timing of the development of new

deposits, success of exploration activities, permitting time lines, government regulation of mining

operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and

limitations on insurance.

This information is qualified in its entirety by cautionary statements and risk factor disclosure contained

in filings made by the Company, including the Company’s annual information form, financial statements

and related MD&A for the year ended July 31, 2022, and the interim financial reports and related MD&A

for the period ended October 31, 2022, filed with the securities’ regulatory authorities in certain provinces

of Canada and available at www.sedar.com.

Should one or more of these risks or uncertainties materialize, or should assumptions underlying the

forward-looking information prove incorrect, actual results may vary materially from those described

herein as intended, planned, anticipated, believed, est imated or expected. Although the Company has

attempted to identify important risks, uncertainties and factors which could cause actual results to differ

materially, there may be others that cause results not to be as anticipated, estimated or intended. The

Company does not intend, and does not assume any obligation, to update this forward -looking

information except as otherwise required by applicable law.

Figure 1 Location of the Minto B / Jubilee Triangle and the current drill hole collar locations from the Surluga Area

Figure 2a - Cross Section of hole SD-22-414 with the Minto B ./Jubilee shears zones and the Gold found in the Hanging wall and

Footwall of the Surluga Deposit

Figure 3b – 3D Capture of SD-22-414 with the Minto B ./Jubilee shears